Skip to content

Subdivision · Planning application

Approved: 150 units across 15 lots in Baker Park Phase Two

The city approved with conditions the final plat for phase two of Baker Park on 11.69 acres, which would allow 150 dwelling units on 15 building lots, with multi-family and commercial uses. The decision was made Dec. 16, 2024, after a public hearing that day.

ApprovedSPF-00273-2024Filed Sept. 20, 2024North Nampa · 16763 Idaho Center Blvd+1 related filing
Site plan for Approved: 150 units across 15 lots in Baker Park Phase Two
Site plan from the application documents.
The county's parcel map doesn't list the filing's address; the pin is where an address lookup puts it.

From the filing

The application's description as it appears in City of Nampa's record. See the official record

A developer is asking Nampa to approve the final plat for Baker Park No. 2, a subdivision on about 11.7 acres at Idaho Center Blvd and Cherry Ln in a Gateway Business (GB2) zone. The plat would create 15 residential lots holding 164 dwelling units, including one lot for 150 multi-family units, plus one commercial lot and three common lots. The staff report recommends approval to the Planning & Zoning Commission, which would then forward it to City Council.

final plat application for phase two of Baker Park Subdivision

Project name on file: Baker Park No 2

Timeline

  1. May 1, 2025

    22 documents added

  2. Dec. 17, 2024

    City Council Decision/Action Letter

  3. Dec. 17, 2024

    P&Z Commision Decision/Action Letter

  4. Dec. 16, 2024

    Decision: Approved with Conditions

    Nampa City Council: Approved with Conditions.

  5. Dec. 16, 2024

    Public hearing: Nampa City Council

  6. Oct. 10, 2024

    Notice to Agencies/Departments

  7. Oct. 10, 2024

    Set Date for Public Meeting

  8. Oct. 9, 2024

    Assess Fees (Subdivision)

  9. Oct. 4, 2024

    Plan Intake Passed

  10. Oct. 4, 2024

    Accepted for review

  11. Oct. 2, 2024

    Plan Intake Failed

  12. Sept. 20, 2024

    Application filed

Documents

Site plans

  • Preliminary plat, full set

    Sept. 20, 2024 · 7.5 MB · Preliminary Plat

Plans

Staff reports

  • Staff report, Baker Park No. 2 final subdivision plat

    Dec. 6, 2024 · 21.7 MB · Staff Report

Decisions

  • Decision letter, Baker Park No. 2 (commission and council)

    Dec. 17, 2024 · 428 KB · Decision Letter

Other documents

  • Itemized inspection and C.C.T.V. fee calculation for sewer, water, storm drain, irrigation, curb and gutter, sidewalk and paving work, totaling $6,943.62.

    May 1, 2025 · 1 page · 56 KB · Available Online

    Download Development inspection fees worksheet
  • QLPE checklist, Baker Park 2

    May 1, 2025 · Available Online

  • City of Nampa city engineer letter finding the construction documents for the water and sewer main extensions comply with IDAPA and engineering standards, with capacity confirmed and a DEQ checklist attached.

    May 1, 2025 · 1 page · 489 KB · Available Online

    Download City engineer QLPE review letter for water and sewer
  • Agreement between the developer and the City of Nampa covering public improvements, completion deadlines, plan compliance, and a cash deposit or letter of credit before final plat signing.

    May 1, 2025 · 2 pages · 58 KB · Available Online

    Download Subdivision improvement agreement with City of Nampa
  • Construction drawings and final plat, first review

    Nov. 25, 2024 · Available Online

  • Engineering review memo

    Engineering review memo for the Subdivision No. 2 final plat application, filed as a document with no extracted text.

    Nov. 25, 2024 · Available Online

  • Final subdivision plat application No. 2

    Oct. 2, 2024 · Application

  • Project narrative, Baker Park No. 2

    Oct. 2, 2024 · Narrative

  • Entitlement package

    Sept. 20, 2024 · Bldg Floor Plans, Materials, Renderings

  • Geotechnical evaluation report

    Geotechnical evaluation for the Baker property development, filed with the final subdivision plat application.

    Sept. 20, 2024 · Geotech/Soil Reports

  • Drainage calculation package, stamped

    Sept. 20, 2024 · Storm Water Reports

  • Final plat set

    Sept. 20, 2024 · Final Plat

  • Baker Park 2 open space exhibit

    Sept. 20, 2024 · Open Space Exhibit

  • Baker Park 2 submittal set

    Sept. 20, 2024 · Improv/Const Drawings

  • Baker Park No. 2 legal description

    Sept. 20, 2024 · Legal Description - Word

  • Baker Park No. 2 legal description

    Sept. 20, 2024 · Legal Description

  • Final plat landscape plan No. 2

    Sept. 20, 2024 · Landscape Plans

  • Open door affidavit

    Affidavit of public notice concerning the open door requirement for the final subdivision plat application.

    Sept. 20, 2024 · Affidavit Barton

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.