Skip to content

Subdivision · Planning application

Nampa approves split of 0.8-acre property into three lots

The city approved with conditions a short plat that would place each of three existing buildings on its own lot. The application was filed July 1, 2024, and decided Oct. 14, 2024.

ApprovedSPS-00061-2024Filed July 1, 2024West Nampa · 1820 W Bella Ln
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

The owner of three existing four-plex apartment buildings at 1820-1880 W Bella Lane in Nampa wants to split the 0.8-acre property into three lots so each building sits on its own lot. No new construction or changes to the buildings, parking, or landscaping are proposed.

Subdivide the property in order to place each of the existing buildings on its own lot

Project name on file: Bella Lane North

Timeline

  1. Oct. 14, 2024

    City Council Decision/Action Letter

  2. Oct. 14, 2024

    21 documents added

  3. Oct. 14, 2024

    Staff Report Preparation

  4. Oct. 14, 2024

    Decision: Approved with Conditions

    Nampa City Council: Approved with Conditions.

  5. Aug. 29, 2024

    Notify Applicant

  6. Aug. 29, 2024

    Notice to Area Property Owners

  7. Aug. 29, 2024

    P&Z Commision Decision/Action Letter

  8. Aug. 29, 2024

    Property Postings

  9. Aug. 9, 2024

    Notice to Agencies/Departments

  10. Aug. 9, 2024

    Set Date for Public Hearing

  11. Aug. 5, 2024

    Assess Fees (Subdivision)

  12. Aug. 1, 2024

    Planning Application Review

  13. July 1, 2024

    Application filed

Documents

Staff reports

  • Staff report

    Planning staff's report on the short subdivision plat application, prepared for review; the document text was not available to summarize further.

    Oct. 14, 2024 · 18.4 MB · Staff Report

Other documents

  • Decision letter for short subdivision plat

    Oct. 14, 2024 · Decision letter

  • Decision letter on connection to city utilities

    Planning and zoning decision letter addressing the application's request to connect to city utilities.

    Aug. 29, 2024 · Decision Letter PZ

  • Staff report for connection to city utilities

    Aug. 29, 2024 · Staff Report PZ

  • Subdivision plat checklist

    Aug. 5, 2024 · Checklsit

  • Aerial with lot lines

    Aerial photograph of the site with proposed lot lines overlaid; no extracted text is available to confirm further detail.

    July 1, 2024 · Building Elevations

  • Affidavit of legal interest

    July 1, 2024 · Affidavit of Legal Interest

  • Boundary description

    July 1, 2024 · Legal Description - Word

  • Boundary description

    July 1, 2024 · Legal Description

  • Construction plan

    July 1, 2024 · Improv/Const Drawings

  • Final plat

    July 1, 2024 · Final Plat

  • Geotechnical report

    July 1, 2024 · Geotech/Soil Reports

  • Landscape plan

    July 1, 2024 · Landscape Plans

  • Project narrative

    July 1, 2024 · Narrative

  • Open space exhibit

    July 1, 2024 · Open Space Exhibit

  • Planning and zoning pre-application meeting notes

    Notes from the pre-application meeting with planning and zoning staff for a short subdivision plat, covering three lots.

    July 1, 2024 · Pre-Application Meeting Notes

  • Preliminary plat

    July 1, 2024 · Prelim Plat

  • Neighborhood meeting sign-in sheet

    Sign-in sheet from the neighborhood meeting, included as proof the meeting was held for this short subdivision plat application.

    July 1, 2024 · Proof of Neighborhood Meeting

  • Stormwater report

    July 1, 2024 · Storm Water Reports

  • Vicinity map

    July 1, 2024 · Vicinity Map

  • Warranty deed

    Warranty deed filed as proof of proprietary interest in the property for this short subdivision plat application.

    July 1, 2024 · Proof of Proprietary Interest

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.