Skip to content

Subdivision · Planning application

KB Home gets approval for 79 single-family homes on 21 acres

The Nampa City Council's approval of the final plat, dated Apr. 21, came with conditions, including completing sewer trunkline and irrigation pump station work before the plat is signed and paying a $15,050 school sewer reimbursement fee.

ApprovedSPF-00283-2025Filed Feb. 11, 2025North Nampa · Elm Ln+5 related filings
Site plan for KB Home gets approval for 79 single-family homes on 21 acres
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

KB Home Idaho LLC received final plat approval for Cherry Grove No 5, a single-family subdivision on about 21.4 acres at Elm Lane in Nampa. The original concept called for 79 detached homes, 10 common area lots and internal roads.

Final plat consisting of 79 single-family lots and 10 common lots on 21.44 acres in an RS-8.5 zone

Project name on file: Cherry Grove No 5

Timeline

  1. Dec. 11, 2025

    21 documents added

  2. Dec. 11, 2025

    Landscape Approval

  3. April 22, 2025

    City Council Decision/Action Letter

  4. April 22, 2025

    P&Z Commision Decision/Action Letter

  5. April 22, 2025

    Notice to Agencies/Departments

  6. April 21, 2025

    Decision: Approved with Conditions

    Nampa City Council: Approved with Conditions.

  7. April 21, 2025

    Public hearing: Nampa City Council

  8. March 12, 2025

    Set Date for Public Meeting

  9. Feb. 28, 2025

    Assess Fees (Subdivision)

  10. Feb. 13, 2025

    Plan Intake Passed

  11. Feb. 13, 2025

    Accepted for review

  12. Feb. 11, 2025

    Application filed

Documents

Site plans

  • Plan sheet with an open space summary for Phase 5, listing qualified open space by lot totaling about 3.33 acres, or 16% of gross area.

    Feb. 11, 2025 · 1 page · 1.1 MB · Open Space Exhibit

    Download Phase 5 open space plan
  • Preliminary subdivision plat sheet showing lot layout, block numbering, lot areas, and adjacent parcel boundaries with dimensions and a natural gas line note.

    Feb. 11, 2025 · 1 page · 1.5 MB · Preliminary Plat

    Download Preliminary plat drawing

Plans

  • Approved landscape plan set for Cherry Grove Phase 5, with general landscape notes covering standards, grading, soils, planter beds, lawn areas and plant lists.

    Dec. 11, 2025 · 57 pages · 16.7 MB · APPROVED landscape plan set

    Download Phase 5 landscape plan set, overall notes and plant schedule
  • Landscape plan sheets for Phase 5 of the Cherry Grove subdivision, marked as requiring revisions, with general landscape notes on regulations, lawn, plants and grading.

    April 22, 2025 · 11 pages · 6.0 MB · Landscape Plan REVISIONS REQUIRED

    Download Landscape plans with revisions required
  • Construction drawing set with abbreviations and general notes citing City of Nampa specifications, permit requirements and pre-construction conference procedures.

    Feb. 11, 2025 · 28 pages · 18.1 MB · Improv/Const Drawings

    Download Construction plans and general notes
  • Building elevation drawings for the planning application, 12 pages; the extracted text is mostly unreadable, so the specific views and details could not be confirmed.

    Feb. 11, 2025 · 12 pages · 2.4 MB · Building Elevations

    Download Building elevations
  • Final subdivision plat sheets for Cherry Grove Subdivision No. 5, sealed by surveyor Clinton W. Hansen of Engineering Solutions LLP, with blank book and page fields for recording.

    Feb. 11, 2025 · 4 pages · 1.9 MB · Final Plat

    Download Final plat, Cherry Grove Subdivision No. 5
  • Overall landscape plan sheet for Phase 5 with notes on standards, sod, plant material and existing conditions, plus area plans 1 and 2.

    Feb. 11, 2025 · 11 pages · 5.6 MB · Landscape Plans

    Download Phase 5 landscape plan, overall with general notes

Project narrative

  • KB Home's narrative for a final plat of 79 single-family lots and 10 common lots on 21.44 acres in an RS-8.5 zone, covering history, density, and utilities.

    Feb. 11, 2025 · 2 pages · 973 KB · Narrative

    Download Written narrative for final plat application

Staff reports

  • Planning staff recommends the Commission find the final plat substantially conforms to the approved preliminary plat, with Engineering comments on conditions and pressure irrigation.

    April 22, 2025 · 46 pages · 21.6 MB · Staff Report

    Download Staff report on final plat approval, Cherry Grove No. 5

Decisions

  • Nampa Planning and Zoning Commission's April 15, 2025 recommendation to approve the Cherry Grove No 5 final plat, with conditions of approval for the applicant.

    April 22, 2025 · 2 pages · 206 KB · Decision Letter

    Download Final plat approval decision letter

Application

  • Planning and Zoning master application form for the Cherry Grove No. 5 final subdivision plat, filed by KB Home Idaho LLC with Engineering Solutions, LLP as contractor.

    Feb. 13, 2025 · 2 pages · 3.6 MB · Application

    Download Master application for final subdivision plat

Studies and reports

  • Kimley-Horn traffic impact study from February 2022 for the Cherry Grove residential development, covering existing conditions, trip generation, and intersection analysis with mitigation findings.

    Feb. 13, 2025 · 246 pages · 5.7 MB · TIS

    Download Traffic impact study
  • Figure 1 site map showing approximate test pit and piezometer locations, the irrigation canal, and site boundary for the geotechnical addendum.

    Feb. 11, 2025 · 1 page · 56 KB · Geotech/Soil Reports Addendum 1

    Download Geotechnical site map, addendum No. 1
  • Atlas Technical Consultants addendum adding 18 piezometers and test pit logs for the Cherry Grove subdivision final plat, dated August 29, 2022.

    Feb. 11, 2025 · 12 pages · 697 KB · Geotech/Soil Reports Addendum 2

    Download Geotechnical addendum No. 2 with piezometer installation and test pit logs
  • Soils exploration and foundation evaluation by Atlas Technical Consultants, dated July 12, 2021, with fieldwork conducted June 23, 2021 and 34 pages.

    Feb. 11, 2025 · 34 pages · 1.2 MB · Geotech/Soil Reports

    Download Geotechnical investigation report for proposed subdivision
  • Atlas Technical Consultants groundwater letter for a subdivision final plat, with monitored groundwater depths at test pits and piezometers from 2021 to 2023.

    Feb. 11, 2025 · 26 pages · 2.9 MB · Storm Water Reports

    Download Groundwater monitoring data and letter

Other documents

  • Subdivision plat checklist

    Feb. 28, 2025 · Checklist

  • Affidavit of legal interest

    Sworn statement of legal interest in the property covered by this final subdivision plat application.

    Feb. 11, 2025 · Affidavit of Legal Interest

  • Legal description, lot 5

    Feb. 11, 2025 · Legal Description - Word

  • Legal description, Cherry Grove No. 5

    Feb. 11, 2025 · Legal Description

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.