Skip to content

Planned unit development · Planning application

Circle K gas station and store proposed on 9-acre commercial site

The plan calls for a 24-hour convenience store with six fuel pump islands. Lots are set aside for a possible bank, drive-thru restaurant, daycare and retail. The site also needs annexation into the city. The request awaits scheduling.

In reviewPUD-00024-2026Filed July 14, 2026North Nampa+2 related filings
Site plan for Circle K gas station and store proposed on 9-acre commercial site
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

A Circle K convenience store and fueling station with other tentative lots associated with bank, drive-thru restaurant, daycare, and retail uses.

Project name on file: Circle K Ustick

Timeline

  1. Oct. 15, 2026

    Notice to Agencies/Departments

  2. Oct. 15, 2026

    Set Date for Public Hearing

  3. Oct. 15, 2026

    Property Postings

  4. Oct. 8, 2026

    17 documents added

  5. Aug. 5, 2026

    Assess Fees (PUD)

  6. July 17, 2026

    Plan Intake Passed

  7. July 17, 2026

    Accepted for review

  8. July 16, 2026

    Plan Intake Failed

  9. July 14, 2026

    Application filed

Documents

Site plans

  • Revised site plan for the Circle K development showing lot layout, zoning split between IL and BC, setbacks, easements, and stormwater and access areas.

    Oct. 8, 2026 · 2 pages · 2.9 MB · Site Plan

    Download Updated site plan, eight-lot layout
  • Sketch site plan sheets showing proposed lot layout for a Planned Unit Development, with lot areas, setbacks, access and stormwater easements, and parking count.

    July 14, 2026 · 2 pages · 3.0 MB · Site Plan

    Download Sketch site plans

Plans

  • Sheet of landscaping code excerpts (Nampa UDC 10-33-2) covering right-of-way landscaping, tree caliper and tree spacing requirements, from Colliers Engineering & Design.

    July 14, 2026 · 2 pages · 1.7 MB · Landscape Plans

    Download Landscape plans with Nampa tree and landscaping requirements
  • States that an open space plan was not required, as confirmed at the pre-application meeting, so none is included in this submission.

    July 14, 2026 · 1 page · 24 KB · Open Space Exhibit - Not Required

    Download Open space plan not required
  • Floor plan sheet with keyed notes on finishes, counters, cooler and freezer equipment, shelving, and storage areas for a convenience store with fuel sales.

    July 14, 2026 · 4 pages · 32.9 MB · Elevations & Floor Plans

    Download Floor plan and elevations

Project narrative

  • Describes a Circle K convenience store and fuel canopy with future retail pads, covering the annexation, zoning, preliminary plat and PUD request, stormwater approach, and deliverables.

    Oct. 8, 2026 · 2 pages · 61 KB · Narrative

    Download Project narrative, updated

Application

  • Filed master application checking annexation, planned unit development with zone designation, and preliminary subdivision, listing Circle K Stores Inc. as applicant and the property owner and contractor contacts.

    Oct. 8, 2026 · 2 pages · 211 KB · Application

    Download Master application form (planned unit development, annexation, subdivision)
  • Idaho Secretary of State annual report filed Sept. 3, 2025 for GZCJ Holdings LLC, listing its registered agent, members and manager as evidence of entity standing.

    July 17, 2026 · 1 page · 23 KB · Proof of Authority 2

    Download Proof of authority, Idaho annual report for LLC
  • Staff notes from a May 20, 2026 pre-application meeting for a 9.1-acre convenience store and fuel site with future commercial pads, covering IL zoning setbacks and use rules.

    July 14, 2026 · 7 pages · 515 KB · Pre-Application Meeting Notes

    Download Planning and zoning pre-application meeting notes

Other documents

  • Oct. 8, 2026 · 29 KB · Dev Agreement

    Download Development agreement
  • Circle K Ustick checklist

    July 17, 2026 · Checklist

  • Unanimous written consent of GZCJ Holdings, LLC members authorizing a representative to sell the property to Circle K Stores, Inc. and sign closing documents.

    July 17, 2026 · 3 pages · 251 KB · Proof of Authority 1

    Download Written consent of LLC members authorizing property sale
  • Title commitment (deed alternate)

    July 14, 2026 · Title Commitment (Deed Alternate)

  • Affidavit of legal interest

    July 14, 2026 · Affidavit of Legal Interest

  • Annexation plat and legal description

    July 14, 2026 · Legal Description

  • Annexation legal description

    July 14, 2026 · Legal Description - Word

  • Neighborhood meeting letter and sign-in sheet

    Proof of the required neighborhood meeting, including the notice letter sent to residents and the attendance sign-in sheet.

    July 14, 2026 · Proof of Neighborhood Meeting

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.