Subdivision · Planning application
Circle K gas station and store with bank, restaurant, daycare lots proposed on 9 acres
The plan for a 9.09-acre site includes a 24-hour convenience store with six fuel pump islands, plus lots for a bank, drive-thru restaurant, daycare and retail. A public hearing is set for Nov. 10. The site needs annexation into the city.}

From the filing
The application's description as it appears in City of Nampa's record. See the official record
A Circle K convenience store and fueling station with other tentative lots associated with bank, drive-thru restaurant, daycare, and retail uses.
Project name on file: Circle K Ustick
Timeline
Nov. 10, 2026
Public hearing: Nampa Planning and Zoning Commission
Two days ago
Status changed from In review to Hearing scheduled
Reported as “In Review”.
Oct. 15, 2026
Property Postings
Oct. 15, 2026
Notice to Agencies/Departments
Oct. 8, 2026
21 documents added
Aug. 5, 2026
Assess Fees (Subdivision)
July 17, 2026
Plan Intake Passed
July 17, 2026
Accepted for review
July 16, 2026
Plan Intake Failed
July 14, 2026
Application filed
Documents
Site plans
- Download Preliminary site plan with eight lots, updated
Updated site plan for a roughly 9.09-acre vacant parcel split into eight lots, showing zoning split, setbacks, easements and stormwater areas for a Circle K development.
Oct. 8, 2026 · 2 pages · 2.9 MB · Site Plan
- Download Phasing plan (updated)
Site plan showing Phase 1 and Phase 2 development areas, with lot layout for a commercial subdivision including a convenience store, bank, daycare and retail lots.
Oct. 8, 2026 · 1 page · 743 KB · Phasing Plan
- Download Preliminary plat, Division No. 1 (updated)
Updated preliminary plat sheet for the Circle K Division No. 1 subdivision, showing lot and block layout, utility notes and curve tables for the curve data.
Oct. 8, 2026 · 2 pages · 871 KB · Preliminary Plat
- Download Sketch site plan with lot layout and setbacks
Sketch site plan for an eight-lot subdivision, showing lot areas, building and greenspace setbacks, utility and stormwater easements, and parking count, prepared by Colliers Engineering & Design.
July 14, 2026 · 2 pages · 3.0 MB · Vicinity Map
Plans
- Download Landscape plan sheet with Nampa landscaping and tree requirements
Sheet reproducing city code requirements for landscaping between right-of-way and property line, general tree caliper and spacing standards, with a planting schedule.
July 14, 2026 · 2 pages · 1.7 MB · Landscape Plans
- Download Open space plan not required
Notes that the pre-application meeting on 5/20/26 determined an open space plan is not required, so none is included in this submission.
July 14, 2026 · 1 page · 24 KB · Open Space Exhibit
- Download Floor plan and elevations, sheet 3 with keynotes
Floor plan sheet with keyed construction notes covering slab vapor barrier, casework, cooler and freezer equipment, shelving, and fire extinguisher placement.
July 14, 2026 · 4 pages · 32.9 MB · Elevations & Floor Plans
Project narrative
- Download Project narrative (updated)
Describes a convenience store with fuel canopy and future pad sites, annexation and PUD zoning request, stormwater plan, and submission deliverables.
Oct. 8, 2026 · 2 pages · 61 KB · Narrative
Application
- Download Master application form for Circle K preliminary plat
Planning department master application covering annexation, planned unit development, and preliminary subdivision, with applicant, owner, and engineer contact details.
Oct. 8, 2026 · 2 pages · 211 KB · Application
- Download Idaho Secretary of State annual report for property owner entity
Annual report filed with the Idaho Secretary of State by GZCJ Holdings LLC, listing its registered agent, managers and members as proof of the owner's entity standing.
July 17, 2026 · 1 page · 23 KB · Proof of Authority 2
- Download Pre-application planning and zoning meeting notes
Staff notes for the Circle K property inquiry covering IL light industrial zoning setbacks, exterior storage rules and the schedule of uses, with the meeting dated May 20, 2026.
July 14, 2026 · 7 pages · 515 KB · Pre-Application Meeting Notes
Studies and reports
- Download Stormwater management report for proposed Circle K store
Stormwater management report covering existing and proposed conditions, treatment, conveyance, and findings, with appendices of rainfall data and hydrograph reports.
July 14, 2026 · 262 pages · 12.3 MB · Storm Water Reports
- Download Traffic impact study
Traffic impact study for a Circle K Stores project in Nampa, covering trip generation, capacity analysis, turn-lane warrants and conclusions.
July 14, 2026 · 107 pages · 6.7 MB · TIS
- Download Geotechnical exploration report
Subsurface exploration and geotechnical review for a proposed commercial development, covering soils, groundwater at 10 to 13 feet, foundation bearing, seismic class and pavement subgrade.
July 14, 2026 · 47 pages · 7.3 MB · Geotech/Soil Reports
Other documents
- Application checklist
Completed checklist for the preliminary subdivision plat submittal, listing the required items for review.
Aug. 5, 2026 · Checklist
- Download Written consent of LLC members authorizing property sale
Unanimous consent of GZCJ Holdings, LLC members authorizing an authorized representative to sell the property to Circle K Stores, Inc. and sign related closing documents.
July 17, 2026 · 3 pages · 251 KB · Proof of Authority 1
- Title commitment (deed alternate)
July 14, 2026 · Title Commitment (Deed Alternate)
- Affidavit of legal interest
Sworn statement from the applicant establishing legal interest in the subject property for this preliminary subdivision plat application.
July 14, 2026 · Affidavit of Legal Interest
- Annexation plat and legal description
July 14, 2026 · Legal Description
- Annexation legal description
July 14, 2026 · Legal Description - Word
- Neighborhood meeting letter and sign-in sheet
Proof of the required neighborhood meeting, including the notice letter sent to residents and the attendance sign-in sheet.
July 14, 2026 · Proof of Neighborhood Meeting

