Skip to content

Design review · Planning application

Facade upgrades and interior loading planned for AutoZone space in commercial building

The city's design review covered exterior facade changes, interior loading and site plans for an AutoZone tenant improvement at the northeast corner of a commercial building. The file is closed, and the project was noted as not needing full review.

ClosedDR-00438-2026Filed June 4, 2026West Nampa · 1509 Caldwell Blvd+4 related filings
Site plan for Facade upgrades and interior loading planned for AutoZone space in commercial building
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

NE front and side corner of the Main District 208 bldg including final design drawings for interior loading, exterior facade upgrades and site plans prior to construction for the Auto Zone TI

Project name on file: District 208 facade - Not more than 50% change, not needed

Timeline

  1. June 4, 2026

    Document added: 260522 Hyperion Nampa ID_AutoZone - Design Review Package.pdf

  2. June 4, 2026

    Document added: 260423 Design Review Packet SIGNED.pdf

  3. June 4, 2026

    Application filed

Documents

Site plans

  • Completed city design review checklist listing required application materials and project specifics, including elevation wall lengths, exposed wall areas, and a façade remodel scope.

    June 4, 2026 · 5 pages · 2.7 MB · Available Online

    Download Design review checklist (signed)
  • Site location map and narrative describing interior alterations to an existing building for a new egress corridor, facade and roof work, and a proposed AutoZone tenant on the first floor.

    June 4, 2026 · 6 pages · 3.7 MB · Available Online

    Download Site location map and scope of work narrative

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.