Property boundary adjustment · Planning application
Lot split approved to create a 0.63-acre parcel for future development
A 2.623-acre commercial lot would be divided into a 2.25-acre parcel and a 0.63-acre parcel, with a lot line adjustment to a neighboring parcel. The city approved the request on Aug. 22, and a preliminary site plan shows planned development on the smaller parcel.

From the filing
The application's description as it appears in City of Nampa's record. See the official record
At this time, we are requesting an Administrative Lot Split of Parcel Number R1214320400 which is 2.623-acres in size into two parcels. The larger back parcel being approximately 2.25-acres and the smaller front parcel (adjacent to Caldwell Boulevard) being approximately 0.63-acres in size and identified as Parcel “E” on the attached Record of Survey prepared for this application. To achieve the 0.63-acre size of the front parcel, we are also requesting an Administrative Lot Line adjustment to Parcel Number R1214320300. Additionally, we would like to note that although the newly formed Parcel “E” will have frontage along Caldwell Boulevard, no direct access will be taken from the parcel; instead access to the parcel will be take from the primary access drive originally identified on the Karcher Mall Subdivision Plat (Instrument No. 9947692). A preliminary site plan of the planned development is also included for your reference illustrating the proposed future development of the front parcel.
Project name on file: District 208
Timeline
Aug. 22, 2025
Decision: Approved
April 28, 2025
11 documents added
April 28, 2025
Planning PBA Application Review
April 25, 2025
Assess Fees (Home)
March 21, 2025
Completeness Check
March 20, 2025
Application filed
Documents
Site plans
- Download Draft boundary adjustment record of survey
Draft record of survey sheet for a property boundary adjustment, showing parcels C, D and E with bearings and surveyor contact details; the text is largely fragmentary.
March 20, 2025 · 1 page · 478 KB · Record of Survey
- Download Site map exhibit for boundary adjustment
Site plan exhibit showing the one-lot boundary adjustment for the Rhino Holdings LLC property, prepared by NV5 and dated March 18, 2025.
March 20, 2025 · 1 page · 272 KB · Other/Misc.
Project narrative
- Download Application cover letter and project narrative
Cover letter requesting an administrative lot split of one parcel into two and a lot line adjustment with a neighboring parcel, with access routed through an existing drive.
March 20, 2025 · 1 page · 198 KB · Narrative
Other documents
- Download Letter of approval with no comments from city departments
Nampa Engineering, Planning and Zoning, and Building departments approved the property boundary adjustment with no comments or conditions, noting the county assessor will need recorded deeds before issuing new parcel…
April 28, 2025 · 1 page · 226 KB · Letter of Approval
- Download Adjusted legal description for Parcel E (draft)
Draft metes-and-bounds legal description for an administrative lot split of Parcel E, dated March 18, 2025, containing about 0.63 acres, prepared by a licensed surveyor.
March 20, 2025 · 2 pages · 311 KB · Other/Misc.
- Download Legal description for administrative lot split of Parcel D
Draft metes-and-bounds legal description, dated March 18, 2025, for a 2.25-acre portion of a lot, prepared by a licensed surveyor.
March 20, 2025 · 2 pages · 308 KB · Other/Misc.
- Download Legal description for administrative lot split, Parcel C
Draft metes-and-bounds legal description for the Parcel C administrative lot split, dated March 18, 2025, tracing the boundary of a portion of Lot 4, Block 1 of a subdivision.
March 20, 2025 · 3 pages · 348 KB · Other/Misc.
- Affidavit of legal interest from NV5
Signed and notarized affidavit of legal interest submitted by NV5 for the Nampa subdivision property boundary adjustment.
March 20, 2025 · Affidavit of Legal Interest
- Signed checklist and master application
Signed copy of the checklist and master application form for the property boundary adjustment.
March 20, 2025 · Checklist & Master Application
- Nampa LLC vesting deed
Vesting deed showing Nampa LLC's ownership interest in the property, filed as proof of proprietary interest for the boundary adjustment.
March 20, 2025 · Proof of Proprietary Interest
- Vicinity map
March 20, 2025 · Vicinity Map


