Skip to content

Development review · Planning application

Two-story, 9,600-square-foot church expansion approved with conditions

The addition would add about 4,800 square feet on each of two floors for restrooms and classrooms, matching the existing church's materials. Approved Jan. 10, it still needs building permits and detailed landscape plans.

ApprovedDR-00379-2024Filed Dec. 20, 2024North Nampa · 10595 Cherry Ln
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

Eagle Christian Church–West Valley plans a two-story building expansion at 10595 Cherry Ln in Nampa, with about 4,800 square feet on each floor. The city approved the exterior design, which matches the materials and colors of the existing church and adds more glass and a new secondary entrance on the front.

The Project includes the expansion of an existing church facility, located in Nampa, ID off of I-84. The expansion will include approximately 4,800sf per floor, and will be two stories. Each story will have additional restrooms and classroom spaces to serve the existing church facility. Drawings were provided to EVstudio by the client and will serve as the Basis of Design for the project. The drawings are attached to this agreement as Exhibit A. The construction of the existing building is V-B, wood framed construction with slab on grade foundation, and pre-engineered roof trusses. The exterior materials are a mix of stucco, siding, and thin brick, with a TPO roof. The addition will match the construction and aesthetic of the existing building.

Project name on file: Eagle Christian Church-West Valley building expansion

Timeline

  1. Two days ago

    Expired

  2. Jan. 10, 2025

    Planning Staff Decision

  3. Jan. 10, 2025

    Staff Report Preparation

  4. Jan. 10, 2025

    10 documents added

  5. Jan. 10, 2025

    Decision: Approved with Conditions

    Nampa Planning and Zoning Commission: Approved with Conditions.

  6. Jan. 10, 2025

    P&Z Planner Review

  7. Jan. 3, 2025

    Assess Fees (Building & Site)

  8. Jan. 3, 2025

    Planning Application Review

  9. Dec. 20, 2024

    Application filed

Documents

Site plans

  • Site plan

    Dec. 20, 2024 · 1.4 MB · Site Plan

Decisions

  • Staff-level design review approval of the church building expansion's architectural plans, with conditions including future landscape plan review at building permit stage.

    Jan. 10, 2025 · 5 pages · 2.3 MB · Decision letter & approved plan set

    Download Design review approval letter

Other documents

  • Landscape plan, phase 2

    Dec. 20, 2024 · Landscaping Plan

  • Affidavit of legal interest

    Affidavit of legal interest filed with the design review application for the ECC West Valley and EV Studio project.

    Dec. 20, 2024 · Affidavit of Legal Interest

  • Building material finish calculations

    Dec. 20, 2024 · Building Finishes

  • Design review application checklist and forms, signed

    Dec. 20, 2024 · Checklist & Master Application

  • Vicinity map

    Dec. 20, 2024 · Vicinity Map

  • Color samples

    Dec. 20, 2024 · Color Samples

  • Building elevations

    Dec. 20, 2024 · Building Elevations

  • Project description

    Applicant's written narrative describing the proposed project; no text was extracted, so details are not available.

    Dec. 20, 2024 · Narrative

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.