Skip to content

Design review · Planning application

3,694-square-foot clubhouse with pool approved for 4-plex apartment development

The clubhouse would hold a leasing office, game room, community room and fitness room, with an outdoor pool for residents. City staff approved the design with conditions on shielded exterior lighting, light pole height and lit walkways.

ApprovedDR-00448-2026Filed Aug. 27, 2026West Nampa · 15679 N Edgartown Ave
Site plan for 3,694-square-foot clubhouse with pool approved for 4-plex apartment development
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

A new 3,694-square-foot clubhouse building is proposed in the Middlebury North subdivision at 15679 N Edgartown Ave in Nampa. It would sit on a 0.75-acre lot in a two-family residential zone, and city staff approved its design on September 4, 2026.

3,694sf clubhouse for the Middlebury 4-plex development.

Project name on file: Middlebury Clubhouse

Timeline

  1. Sept. 29, 2026

    Planning Staff Decision

  2. Sept. 29, 2026

    Decision: Approved with Conditions

    Nampa Planning and Zoning Commission: Approved with Conditions.

  3. Sept. 4, 2026

    16 documents added

  4. Sept. 4, 2026

    Assess Fees (Building & Site)

  5. Sept. 4, 2026

    Planning Application Review

  6. Sept. 4, 2026

    P&Z Planner Review

  7. Aug. 27, 2026

    Application filed

Documents

Site plans

  • Site plan sheet with general construction notes, accessibility requirements, and a parking tabulation showing nine standard stalls plus one ADA stall.

    Aug. 27, 2026 · 1 page · 1.7 MB · Site Plan

    Download Overall site plan, sheet A1.2
  • Site plan sheet with general and key notes covering sidewalks, accessible parking and van-accessible loading, mailbox reach, utility burial depth, and parking lot and condensing unit references.

    Aug. 27, 2026 · 1 page · 1.1 MB · Site Plan

    Download Clubhouse site plan, sheet A1.3
  • Construction details for accessible parking stalls, ramps, signage, bollards and concrete joints, plus bike rack and loading zone details.

    Aug. 27, 2026 · 1 page · 674 KB · Site Plan

    Download Site plan details: accessible parking and related sheet

Renderings

Plans

  • Floor plan sheet for the clubhouse showing room layout, dimensions and general construction notes, including accessible seating and furniture requirements.

    Aug. 27, 2026 · 1 page · 365 KB · Other

    Download Clubhouse floor plan, sheet A2.6
  • Architectural roof plan for the clubhouse, with a 3D roof view and general notes on roof overhangs, ice and water shield, gutters, and coordination with framing and truss drawings.

    Aug. 27, 2026 · 1 page · 1.2 MB · Other

    Download Clubhouse roof plan, sheet A2.7
  • Exterior elevation sheet showing front and right elevations, with general notes on finish materials, flashing, siding, roofing and key notes for the design review.

    Aug. 27, 2026 · 1 page · 4.1 MB · Building Elevations

    Download Building elevations, front and right sides with general notes
  • Civil engineering drawings prepared by Bailey Engineering, Inc., dated 11/11/2025 and marked not for construction; text is mostly garbled stamp and seal text.

    Aug. 27, 2026 · 1 page · 895 KB · Other

    Download Civil drawings sheet
  • Landscape drawing sheets from Bailey Engineering, with attached landscape work and sprinkler irrigation specification sections covering topsoil, planting and valves.

    Aug. 27, 2026 · 7 pages · 6.7 MB · Landscaping Plan

    Download Landscape drawings and irrigation specifications
  • Wall area and percentage breakdown of siding, board and batten, stone, trim and glazing for each clubhouse building elevation, with paint and stone product labels.

    Aug. 27, 2026 · 1 page · 576 KB · Color Samples

    Download Material percentage breakdown by elevation

Project narrative

  • Narrative from the architect describing the clubhouse amenity building, its pool and fence, parking count, architectural match to the apartments, trash enclosure and screened mechanical equipment.

    Aug. 27, 2026 · 1 page · 115 KB · Narrative

    Download Design review narrative for Clubhouse

Decisions

  • Staff-level approval of design plans for a new 3,694 sq ft clubhouse, dated Sept. 4, 2026, subject to exterior lighting conditions under the design review code.

    Sept. 4, 2026 · 3 pages · 2.2 MB · DR Decision Letter

    Download Design review approval letter with lighting conditions

Other documents

  • Affidavit of legal interest

    Aug. 27, 2026 · Affidavit of Legal Interest

  • Application checklist

    Checklist for the Design Review application, listing the submittal items required for a project under 5,000 square feet.

    Aug. 27, 2026 · Checklist & Master Application

  • Master application form

    The master application form filed for this design review request, with no extractable text available to describe further.

    Aug. 27, 2026 · Checklist & Master Application

  • Vicinity map

    Aug. 27, 2026 · Vicinity Map

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.