Skip to content

Development review · Planning application

Nampa approves 39 four-plex buildings with 156 apartments

Open Door Rentals, LLC plans 156 apartments in 1, 2 and 3 bedroom layouts on about 17.4 acres within the Middlebury North Subdivision. The city approved the design on July 24, 2025, and later revisions covered front elevations and trash enclosure screening.

ApprovedDR-00405-2025Filed June 26, 2025West Nampa · 15654 N Edgarton Ave+1 related filing
Site plan for Nampa approves 39 four-plex buildings with 156 apartments
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

Open Door Rentals, LLC proposes 39 four-plex buildings with 156 apartments in 1, 2, and 3 bedroom layouts within the Middlebury North Subdivision, on about 17.4 acres near Karcher Road and Midway Road in Nampa. This revision approves a changed design for the project's trash enclosures.

Scope includes the construction of (39) 4-plex buildings, totaling 156 units.

Project name on file: Middlebury 4-Plexes

Timeline

  1. Two days ago

    Expired

  2. April 20, 2026

    18 documents added

  3. July 24, 2025

    Decision/Action Letter

  4. July 24, 2025

    Decision: Approved with Conditions

  5. July 15, 2025

    Planning Staff Decision

  6. July 15, 2025

    Staff Report Preparation

  7. July 15, 2025

    Set Date for Public Meeting

  8. July 15, 2025

    P&Z Planner Review

  9. June 26, 2025

    Assess Fees (Building & Site)

  10. June 26, 2025

    Application filed

  11. June 26, 2025

    Planning Application Review

Documents

Site plans

  • Recorded plat map of Middlebury North Subdivision No. 1 showing blocks, lots, curve and line tables, easement notes, and a surveyor's narrative.

    June 26, 2025 · 5 pages · 2.9 MB · Other

    Download Subdivision plat, Middlebury North No. 1
  • Draft plat for Middlebury North Subdivision No. 2, prepared by Bailey Engineering, Inc., with surveyor certification stamps on the title sheets.

    June 26, 2025 · 8 pages · 2.7 MB · Other

    Download Draft subdivision plat
  • Site plan sheet showing the Chapter 22 off-street parking breakdown (335 required, 352 provided, including ADA and covered stalls) and a carport schedule by building.

    June 26, 2025 · 5 pages · 15.8 MB · Site Plan

    Download Site plan with off-street parking schedule and carport table

Renderings

  • Sample images of proposed exterior finishes, including cement board in board-and-batten and horizontal lap, and manufactured stone siding; colors are shown on separate color samples.

    June 26, 2025 · 1 page · 407 KB · Building Finishes

    Download Material examples for building finishes

Plans

  • Exterior elevation sheets with general construction notes on flashing, fiber cement siding, utility screening and finish color selection, plus material area takeoffs by elevation.

    June 26, 2025 · 6 pages · 20.7 MB · Building Elevations

    Download Building elevations with general notes and material takeoffs
  • Landscape plan sheets and specifications for the Middlebury North No. 1 final plat, including irrigation and landscape work sections, prepared by Bailey Engineering.

    June 26, 2025 · 7 pages · 5.7 MB · Landscaping Plan

    Download Final plat landscape plan
  • Landscape plan sheets for the Middlebury North No. 2 final plat, with accompanying landscape and sprinkler irrigation specification sections from the civil engineering firm Bailey Engineering.

    June 26, 2025 · 7 pages · 9.2 MB · Landscaping Plan

    Download Landscape plan, Middlebury North No. 2 final plat

Project narrative

  • Narrative for the Middlebury 4-plex design review covering unit mix, parking counts, acreage, and building materials.

    June 26, 2025 · 1 page · 220 KB · Narrative

    Download Design review narrative

Staff reports

  • Staff report to the Design Review Committee on design plans for thirty-nine 4-plex buildings (156 dwelling units) in the Middlebury North Subdivision, with applicable comprehensive plan design standards.

    July 15, 2025 · 55 pages · 31.6 MB · DR Staff report compiled

    Download Design Review staff report

Decisions

  • Planning letter approving revised trash enclosure design for the 39 four-plex buildings (156 units) in the Middlebury North subdivision, with original conditions still applying.

    April 20, 2026 · 11 pages · 15.4 MB · Design Review Approval Revised 04-20-2026

    Download Revised trash enclosure approval letter
  • City of Nampa planner approves revised front elevations for the 4-plex buildings, a stairwell beam fire-rating change, with the original July 2025 conditions still applying.

    March 17, 2026 · 7 pages · 10.0 MB · REVISED Design Review Decision Letter 03-17-2026

    Download Revised front elevation approval letter

Other documents

  • Manufacturer spec sheet for a wet-listed, impact-resistant LED wall or ceiling fixture, covering housing, diffuser, finishes, lumen outputs and ordering codes.

    July 24, 2025 · 2 pages · 3.9 MB · Light fixture

    Download Hi-Impact 7162 LED light fixture specification sheet
  • Manufacturer specification sheet for a wet-rated, impact-resistant ceiling or wall LED fixture with die-cast aluminum housing, polycarbonate diffuser, and wattage and finish options.

    July 24, 2025 · 2 pages · 3.9 MB · Light fixture

    Download Hi-Impact 7162 LED light fixture spec sheet
  • Two-page manufacturer spec sheet for a 7601 LED wall sconce covering finishes, LED performance options, frame and diffuser construction, and ordering information.

    July 24, 2025 · 2 pages · 3.4 MB · Light fixture

    Download Wall light fixture specification sheet, model 7601 LED
  • Paint and stone selections for lap siding, trim, fascia, soffit, board and batten, doors, and Pro Fit Alpine Ledgestone veneer in Echo Ridge.

    June 26, 2025 · 1 page · 1.3 MB · Color Samples

    Download Exterior color samples
  • Design review checklist

    June 26, 2025 · Checklist & Master Application

  • Vicinity map

    June 26, 2025 · Vicinity Map

  • Affidavit of legal interest

    June 26, 2025 · Affidavit of Legal Interest

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.