Skip to content

Development review · Planning application

Approved: 22,281-square-foot indoor hitting facility for Northwest Nazarene University

The city found the project did not meet the threshold requiring design review, so it was closed Oct. 3 as completed. The metal building would house a lobby, storage, restrooms and indoor practice space for baseball, softball and golf teams.

ApprovedDR-00367-2024Filed Sept. 27, 2024South Nampa · 229 E Dewey Ave
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

**After Reviewing the project submission, the scope of work does not meet the threshold to require Design Review.** The project is a 22,281 SF hitting facility for the Northwest Nazarene University. Metal building with metal lean-tos. Program includes lobby, storage, restrooms, and indoor hitting/practice space for Baseball, Softball, and Golf teams.

Project name on file: New hitting facility for Northwest Nazarene University.

Timeline

  1. Oct. 3, 2024

    12 documents added

  2. Oct. 3, 2024

    Decision: Approved

  3. Sept. 27, 2024

    Application filed

Documents

Site plans

  • Site plan aerial

    Sept. 27, 2024 · 804 KB · Site Plan

Renderings

  • Hitting facility renderings

    Sept. 27, 2024 · 21.0 MB · Building Finishes

Plans

  • Hitting facility building elevations

    Sept. 27, 2024 · 13.7 MB · Building Elevations

  • NNU hitting facility building finishes

    Building finishes sheet for the NNU hitting facility, listed under color samples for a design review application.

    Sept. 27, 2024 · 7.6 MB · Color Samples

  • Hitting facility floor plan

    Sept. 27, 2024 · 183 KB · Other

  • Landscape plan, sheet L1.0

    Sept. 27, 2024 · 1.4 MB · Landscaping Plan

Project narrative

  • Hitting facility narrative

    Project narrative describing the proposed hitting facility for the NNU athletics site, submitted with the design review application.

    Sept. 27, 2024 · 54 KB · Narrative

Correspondence

  • Design review comments on the NNU hitting facility

    Oct. 3, 2024 · 327 KB · Design Review not required

Other documents

  • Design review checklist

    Completed design review checklist for the NNU hitting facility, filed under the design review application for projects 5,000 square feet or greater.

    Sept. 27, 2024 · Checklist & Master Application

  • Material percentages and project specifics for NNU hitting facility

    Document listing material percentages and project specifics for the NNU hitting facility, filed with the design review application.

    Sept. 27, 2024 · Other

  • Vicinity map

    Sept. 27, 2024 · Vicinity Map

  • Affidavit of legal interest

    Affidavit of legal interest filed with the hitting facility permit application, dated Sept. 23, 2024.

    Sept. 27, 2024 · Affidavit of Legal Interest

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.