Skip to content

Subdivision · Planning application

Hubble Homes wins approval for 65-lot single-family subdivision

The city approved the final plat on March 17, 2026, with conditions, including that the surveyor address final plat comments and the developer sign a subdivision improvement agreement before construction starts. The 17-acre site was irrigated farmland.

ApprovedSPF-00307-2025Filed Dec. 12, 2025North Nampa
Site plan for Hubble Homes wins approval for 65-lot single-family subdivision
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

Hubble Homes received final plat approval for Northland No 1, a single-family subdivision at Prescott Lane in Nampa. The original concept called for 65 single-family lots and 13 common lots in a single-family residential zone.

Phase 1 includes 78 total lots: 65 buildable lots and 13 common lots on approximately 17.32 acres. This represents a gross density of 3.75 lots per acre and a net density of 9.02 lots per acres, both of which are consistent with the existing entitlements.

Project name on file: Northland No 1

Timeline

  1. Sept. 30, 2026

    18 documents added

  2. March 31, 2026

    City Council Decision/Action Letter

  3. March 31, 2026

    Set Date for Public Meeting

  4. March 31, 2026

    Notice to Agencies/Departments

  5. March 31, 2026

    P&Z Commision Decision/Action Letter

  6. March 17, 2026

    Decision: Approved

    Nampa City Council: Approved.

  7. March 17, 2026

    Public hearing: Nampa City Council

  8. Jan. 16, 2026

    Assess Fees (Subdivision)

  9. Dec. 18, 2025

    Plan Intake Passed

  10. Dec. 18, 2025

    Plan Intake Failed

  11. Dec. 18, 2025

    Accepted for review

  12. Dec. 12, 2025

    Application filed

Documents

Site plans

  • Site plan sheet showing open space areas and calculations for the preliminary plat of a residential subdivision, prepared by a landscape architecture firm.

    Dec. 12, 2025 · 1 page · 881 KB · Open Space Exhibit

    Download Preliminary plat open space exhibit
  • Preliminary plat showing lot layout, project summary and zoning data (RS6, RMH and BC) for a 453.71-acre subdivision with 224 single-family lots and 17 multifamily lots in Canyon County.

    Dec. 12, 2025 · 5 pages · 8.2 MB · Preliminary Plat

    Download Preliminary plat, Northland Subdivision

Plans

  • Civil construction plan set for the Northland Subdivision final plat, with cover, notes, existing conditions, roadway plan-and-profile, utility, grading and detail sheets.

    Sept. 30, 2026 · 50 pages · 69.2 MB · Improv/Const Drawings

    Download Revised improvement drawings set
  • Revised final subdivision plat in the City of Nampa, showing the boundary, lot layout, legend, sheet index, owner's certificate, and approval certificates.

    Dec. 29, 2025 · 6 pages · 6.1 MB · Final Plat Revised

    Download Final plat, Northland Subdivision No. 1 (revised)
  • Dec. 12, 2025 · 5 pages · 2.9 MB · Building Elevations

    Download Building elevations
  • Civil construction drawing set for Northland Subdivision No. 1, including the cover sheet, index of general, roadway and utility improvement plans, and a vicinity map, signed by a licensed engineer.

    Dec. 12, 2025 · 35 pages · 37.5 MB · Improv/Const Drawings

    Download Construction plans, Northland Subdivision No. 1 (cover and index)
  • Sheet of general landscape and irrigation notes covering utility verification, irrigation system scope, plant material quantities and availability, and permits, prepared by the landscape designer.

    Dec. 12, 2025 · 7 pages · 18.0 MB · Landscape Plans

    Download Landscape plan, general notes and irrigation notes

Project narrative

  • Revised storm water drainage report for a residential subdivision in Nampa, covering drainage design against city and DEQ water quality requirements, with calculations and appendices.

    Sept. 30, 2026 · 58 pages · 13.7 MB · Storm Water Reports

    Download Revised storm drainage report
  • Project narrative for the final plat of Northland Subdivision No. 1, covering Phase 1's 78 lots (65 buildable, 13 common) on about 17.32 acres and stating conditions of approval are satisfied.

    Dec. 12, 2025 · 1 page · 112 KB · Narrative

    Download Final plat cover narrative letter
  • Engineering report on the subdivision's storm drainage design, showing compliance with City of Nampa stormwater standards and Idaho DEQ water quality requirements, with calculations and appendices.

    Dec. 12, 2025 · 58 pages · 13.7 MB · Storm Water Reports

    Download Storm drainage report for Northland Subdivision No. 1

Decisions

  • Letter to the applicant confirming Nampa City Council approval of the final subdivision plat on March 30, 2026, contingent on seven Planning and Zoning Commission conditions.

    March 31, 2026 · 2 pages · 180 KB · Decision Letter

    Download Council approval decision letter for final plat

Application

  • Planning and Zoning master application filed by Hubble Homes, LLC with KM Engineering, LLP as engineer, for a final subdivision plat tied to a prior preliminary plat.

    Dec. 18, 2025 · 2 pages · 1.4 MB · Application

    Download Master application for final subdivision plat

Studies and reports

  • SITE Consulting's July 31, 2022 report finds the planned residential subdivision geotechnically feasible, with preliminary design recommendations and further investigations still underway.

    Dec. 12, 2025 · 16 pages · 1.4 MB · Geotech/Soil Reports

    Download Geotechnical feasibility and preliminary recommendation report

Correspondence

Other documents

  • Subdivision plat checklist, Northland No 1

    Jan. 16, 2026 · Checklist

  • Affidavit of legal interest

    Dec. 12, 2025 · Affidavit of Legal Interest

  • Legal description

    Dec. 12, 2025 · Legal Description - Word

  • Legal description

    Dec. 12, 2025 · Legal Description

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.