Skip to content

Variance · Planning application

Nampa council approves landscape buffer variance for Pacific Supply site

The city council approved a variance from the 15-foot landscape buffer rule for the 2.77-acre industrial property, allowing no landscaping in front of the converted office and minimal planting elsewhere. The approval came with conditions, including that all city building and development standards be followed.

ApprovedVAR-00183-2025Filed March 5, 2025East Nampa · 1731 Industrial Rd+2 related filings
Site plan for Nampa council approves landscape buffer variance for Pacific Supply site
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

Pacific Supply, an existing industrial business at 1731 Industrial Rd in Nampa, is asking the City Council for a variance from landscaping rules triggered by rebuilding its parking lot. It proposes no street landscape buffer in front of the office so customer parking can stay, and a 15-foot buffer on the east and west sides of the building with only limited, low-water plantings because of overhead power lines and truck traffic.

Electrical Plumbing HVAC in office building and reconstruct parking lot. Request variance to landscape buffer requirement. Change lights to LED and add new garage doors and openers. Paint outside. Replace fabric of existing fence.

Project name on file: Pacific Supply

Timeline

  1. July 8, 2025

    19 documents added

  2. July 8, 2025

    City Council Decision/Action Letter

  3. June 16, 2025

    Decision: Approved with Conditions

    Nampa City Council: Approved with Conditions.

  4. June 16, 2025

    Public hearing: Nampa City Council

  5. June 2, 2025

    Notice to Area Property Owners

  6. March 28, 2025

    Notice to Agencies/Departments

  7. March 21, 2025

    Plan Intake Passed

  8. March 21, 2025

    Accepted for review

  9. March 13, 2025

    Plan Intake Failed

  10. March 13, 2025

    Assess Fees (Variance)

  11. March 5, 2025

    Application filed

Documents

Site plans

  • Survey by Elevated Land Surveying covering title commitment items, light industrial zoning, easement notes and setback requirements.

    March 5, 2025 · 2 pages · 655 KB · Record of Survey

    Download Record of survey with zoning and easement notes
  • City of Nampa engineering notes from a Feb. 27, 2025 pre-application meeting covering road frontage, utilities, storm drainage, and required permits for the office project.

    March 5, 2025 · 2 pages · 252 KB · Pre-App Mtg Notes - Engrg

    Download Pre-application engineering meeting notes

Plans

  • Cover sheet for the Pacific Supply sidewalk and landscape exhibit, marked for review, prepared by Mason & Associates.

    March 5, 2025 · 1 page · 614 KB · Sidewalk & Landscape Exhibit

    Download Sidewalk and landscape exhibit cover sheet

Project narrative

  • Applicant's narrative accompanying the variance request for the Pacific Supply application; no text was available to summarize further.

    March 21, 2025 · 15 KB · Narrative

    Download Project narrative

Staff reports

  • City staff report for the June 16, 2025 council hearing on a variance from required 15-foot landscape buffer and planting standards in the light industrial zone.

    June 12, 2025 · 23 pages · 8.4 MB · Staff Report CC - June 2025

    Download Staff report on landscape buffer variance for Pacific Supply

Decisions

  • Recorded City of Nampa variance permit allowing no front landscaping and minimal landscaping beside the existing shop in the light industrial zone, with approval criteria and conditions.

    July 8, 2025 · 2 pages · 468 KB · Recorded permit #2025-023618

    Download Recorded variance permit, landscape buffer
  • City council letter approving a variance from the 15-foot landscape buffer requirement for an industrial zone, with one condition to follow city and building standards.

    June 18, 2025 · 5 pages · 1.1 MB · Available Online

    Download Decision letter approving landscape buffer variance
  • Nampa City Council decision approving a variance to the 15-foot landscape buffer requirement for Pacific Supply's light industrial property, with findings on sight lines, overhead power lines and parking.

    June 18, 2025 · 4 pages · 717 KB · Available Online

    Download Findings of fact, conclusions of law and decision

Application

  • Master application form for a city council variance request filed by Pacific Supply, listing the owner, applicant and contractor contacts and related file numbers.

    March 13, 2025 · 2 pages · 2.2 MB · Application

    Download Master application for variance
  • Staff notes from a Feb. 27, 2025 pre-application meeting on interior electrical, plumbing and HVAC work, parking lot reconstruction, LED lighting, garage doors, painting and fence replacement, citing code requirements…

    March 5, 2025 · 7 pages · 672 KB · Pre-Application Mtg Notes - P&Z

    Download Pre-application planning and zoning meeting notes
  • Fire District notes from the Feb. 27, 2025 pre-application meeting covering extinguishers, address signage, inspections, hazardous materials, high-piled storage and sprinkler requirements tied to occupancy class.

    March 5, 2025 · 3 pages · 196 KB · Pre-Application Mtg Notes - Fire

    Download Nampa Fire District pre-application meeting notes

Studies and reports

  • Water system model of a hydrant node showing pressure against flow, with the curve adjusted to limit flow to 1,300 gpm, modeled Feb. 26, 2025.

    March 5, 2025 · 1 page · 38 KB · Industrial Rd Hydrant Flow

    Download Hydrant flow analysis

Other documents

  • Pacific Supply checklist

    March 21, 2025 · Checklist

  • Affidavit of legal interest

    March 5, 2025 · Affidavit of Legal Interest

  • Blank template exhibits for a city stormwater O&M agreement covering property description, control measure descriptions, and the maintenance plan, with fields not yet completed.

    March 5, 2025 · 3 pages · 270 KB · Stormwater O&M Agreement Exhibits

    Download Stormwater operation and maintenance agreement exhibits
  • City of Nampa utility map showing water, sewer, stormdrain, irrigation, and streetlight infrastructure, with a legend distinguishing in-service from proposed facilities.

    March 5, 2025 · 1 page · 2.1 MB · Utility Map

    Download Utility map with service lines and infrastructure legend
  • Parcel 1 legal description

    March 5, 2025 · Legal Description Parcel 1 - Word

  • Recorded warranty deed

    March 5, 2025 · Warranty Deed

  • Draft checklist of the documents required for the stormwater operations and maintenance agreement, including legal description, responsible party, drainage map, record drawings and maintenance plan.

    March 5, 2025 · 1 page · 190 KB · Stormwater O&M Agreement

    Download Stormwater O&M agreement contents checklist

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.