Property boundary adjustment · Planning application
Approved: Nampa property split to allow townhouse lots on a city residential lot
The city approved the boundary adjustment, which reconfigures five parcels into separate lots for townhouses. Several lots remain in a 100-year floodplain and need floodplain development permits before building, and each new lot must have its own city sewer, water and irrigation lines.

From the filing
The application's description as it appears in City of Nampa's record. See the official record
A property boundary adjustment was approved at 1922 E Shortline Dr in Nampa to reconfigure five parcels into separate lots for townhouses. Several of the lots are still affected by the 100-year Indian Creek floodplain and will need floodplain permits before building.
Project name on file: Property Split for Townhouses
Timeline
March 17, 2026
10 documents added
Sept. 17, 2025
Decision: Approved
Sept. 17, 2025
Planning PBA Application Review
Sept. 16, 2025
Completeness Check
Sept. 16, 2025
Application filed
Documents
Site plans
- Download Existing right-of-survey plat for Spurline Subdivision
Survey plat sheet showing the subdivision boundary, bearings, lot layout, legend and notes on irrigation, easements and common-area lots.
Sept. 16, 2025 · 3 pages · 776 KB · Available Online
Project narrative
- Download Record of survey for Lots 2, 3, 4, 6, 7 and 11, Spurline Subdivision
Recorded survey establishing the exterior boundary of six lots and dividing each to accommodate a townhouse residence, with monuments set in September 2025.
March 17, 2026 · 1 page · 5.2 MB · Available Online
- Download Applicant narrative for lot split
Applicant describes splitting six existing lots in Block 1 of Spurline Subdivision down the middle so each becomes two properties, allowing a pair of townhouses on each lot.
Sept. 16, 2025 · 1 page · 13 KB · Available Online
Decisions
- Download Property boundary adjustment approval letter
Approval letter from Nampa Engineering and Planning and Zoning with conditions on floodplain permits, utility service lines, and townhouse building requirements.
Sept. 17, 2025 · 4 pages · 938 KB · Available Online
Application
- Download Master application form
City of Nampa master application for a property boundary adjustment, a lot split for townhouses on Spurline Lot Splits, with applicant, owner, and project details.
Sept. 16, 2025 · 2 pages · 502 KB · Available Online
Other documents
- Affidavit
Sept. 16, 2025 · Available Online
- Checklist
Sept. 16, 2025 · Available Online
- Download Notice of Rights of Survey ordinance, text partly garbled
Sept. 16, 2025 · 2 pages · 671 KB · Available Online
- Vicinity map
Sept. 16, 2025 · Available Online
- Warranty deed
Sept. 16, 2025 · Available Online

