Skip to content

Planned unit development · Planning application

Nampa approves 72 townhome units in 18 fourplexes with conditions

The Planning and Zoning Commission approved the planned unit development and plat on Apr. 15, with 10 conditions, including added guest parking and frontage road improvements. The 7.68-acre site is now a city commercial lot.

ApprovedPUD-00018-2025Filed Feb. 4, 2025East Nampa · 2205 3rd St N+3 related filings
Site plan for Nampa approves 72 townhome units in 18 fourplexes with conditions
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

Sugar Creek Townhomes is a proposed subdivision at 2205 3rd Street N in Nampa, on about 7.68 acres near Sugar Street and Victory Road, with 72 single-family residential lots and 5 common lots. The Nampa Planning and Zoning Commission approved the planned unit development and preliminary plat on April 15, 2025, with 10 conditions.

A development of 72 units over 18 fourplexes and associated site improvements.

Project name on file: Sugar Creek Townhomes

Timeline

  1. April 16, 2025

    18 documents added

  2. April 16, 2025

    P&Z Commision Decision/Action Letter

  3. April 16, 2025

    Set Date for Public Hearing

  4. April 16, 2025

    Decision: Approved with Conditions

    Nampa Planning and Zoning Commission: Approved with Conditions.

  5. March 6, 2025

    Assess Fees (PUD)

  6. Feb. 19, 2025

    Plan Intake Passed

  7. Feb. 19, 2025

    Accepted for review

  8. Feb. 18, 2025

    Plan Intake Failed

  9. Feb. 4, 2025

    Application filed

Documents

Site plans

  • Site plan sheet showing the 7.68-acre RD 0-lot PUD layout, setbacks, amenities (playground, dog park, pathway), and a 188-space parking count against 180 required.

    Feb. 4, 2025 · 1 page · 996 KB · Site Plan

    Download Architectural site plan

Plans

  • Revised landscape plan set (7 pages, dated Feb. 4, 2025) covering materials, planting plans for three areas, plant schedules and details, prepared by Ardurra Group for the PUD submittal.

    Feb. 5, 2025 · 7 pages · 5.3 MB · Revised landscape plans provided by John Dixon 02-05-2025 for update to PUD submittal

    Download Revised landscape plans for PUD update
  • Architectural sheet A2.01 for Sugar Creek Townhomes showing Fourplex Type A rear, front and side elevations, level 1 plan, and building data, printed Nov. 21, 2024.

    Feb. 4, 2025 · 4 pages · 2.7 MB · Proposed Building Elevations

    Download Fourplex Type A building elevations and floor plan
  • Open space requirements and provided categories (play area, walking path, field, dog park) with acreage, plus the master landscape materials schedule for the planned unit development.

    Feb. 4, 2025 · 1 page · 784 KB · Open Space Exhibit

    Download Open space diagrams

Project narrative

  • Revised narrative for a planned unit development resubmittal proposing 72 townhome-style units in fourplexes on floodplain-constrained land, with smaller lots and a unit mix by bedroom count.

    March 4, 2025 · 2 pages · 115 KB · Narrative Revised

    Download Project narrative, revised planned unit development

Staff reports

  • Staff report for the April 15, 2025 hearing on preliminary plat and planned unit development approval for a 72-lot townhome project on 7.68 acres, covering zoning history, utilities and traffic.

    April 16, 2025 · 61 pages · 37.1 MB · Available Online

    Download Staff report for Planning and Zoning Commission hearing
  • Staff report for the April 15, 2025 hearing on preliminary plat and planned unit development approval for a 72-lot townhome project on 7.68 acres, covering zoning history, utilities and traffic.

    April 11, 2025 · 61 pages · 37.1 MB · Available Online

    Download Staff report for Planning and Zoning Commission hearing

Decisions

Notices

  • Letter inviting neighbors to the Feb. 3 neighborhood meeting on a 72-unit planned unit development, plus a follow-up email noting a neighbor's call about the project.

    Feb. 10, 2025 · 4 pages · 1.6 MB · Proof of Neighborhood meeting

    Download Proof of neighborhood meeting notice

Application

  • Planning and zoning master application for a preliminary subdivision (Planned Unit Development) with the applicant listed as the project architect and the owner as Bunker Development.

    March 4, 2025 · 2 pages · 2.2 MB · Application

    Download Master application for Sugar Creek Townhomes subdivision
  • A 2024 Idaho Secretary of State annual report filed for Bunker Development LLC, offered as proof of the applicant's authority to file.

    Feb. 18, 2025 · 1 page · 22 KB · Proof of Authority

    Download Idaho Secretary of State annual report for applicant LLC
  • Staff notes from a February 4, 2025 pre-application review of a townhouse PUD proposal, covering subdivision plat requirements, PUD intent, and RD zone setbacks.

    Feb. 4, 2025 · 5 pages · 1.1 MB · Pre-Application Meeting Notes

    Download Pre-application property inquiry notes from Planning & Zoning

Other documents

  • Application checklist

    March 6, 2025 · Checklist

  • Annexation description

    Legal description of the boundary for the proposed annexation.

    Feb. 4, 2025 · Legal Description - Boundary

  • Signed affidavit of legal interest

    Feb. 4, 2025 · Affidavit of Legal Interest

  • Original legal description

    Feb. 4, 2025 · Legal Description - Word

  • Recorded 2021 quitclaim deed conveying the property from SREE LLC and French Toast Investments, LLC to Bunker Development, LLC, offered as proof of ownership interest.

    Feb. 4, 2025 · 2 pages · 85 KB · Proof of Proprietary Interest

    Download Quitclaim deed to Bunker Development, LLC
  • Draft declaration of covenants, conditions and restrictions for the Sugar Creek Townhomes development, marked as awaiting exhibits.

    Feb. 4, 2025 · 248 KB · Proposed CC&R's - Draft

    Download Draft declaration of CC&Rs, version 3

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.