Skip to content

Subdivision · Planning application

67-lot Seven Maples subdivision phase gets final plat approval

The City Council approved the final plat on May 18 for 67 home lots and 17 common lots, including a pocket park and pathways, on 12.22 acres. Approval requires a revised landscape plan and irrigation district sign-off.

ApprovedSPF-00311-2026Filed Feb. 4, 2026South Nampa
Site plan for 67-lot Seven Maples subdivision phase gets final plat approval
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

This is a request for final plat approval of Seven Maples Ranch Subdivision No. 3, a 12.22-acre phase on East Oklahoma Avenue in Nampa. It would create 67 residential lots (single-family detached homes and townhouses) and 17 common lots with a pocket park and pathways. Staff finds it consistent with the preliminary plat approved in 2022.

FINAL PLAT APPLICATION FOR SEVEN MAPLES NO 3 67 SINGLE FAMILY LOTS AND 17 COMMON

Project name on file: Seven Maples No 3

Timeline

  1. May 20, 2026

    20 documents added

  2. May 19, 2026

    City Council Decision/Action Letter

  3. May 19, 2026

    P&Z Commision Decision/Action Letter

  4. May 18, 2026

    Decision: Approved

    Nampa City Council: Approved.

  5. May 18, 2026

    Public hearing: Nampa City Council

  6. May 7, 2026

    Set Date for Public Meeting

  7. May 7, 2026

    Notice to Agencies/Departments

  8. Feb. 25, 2026

    Assess Fees (Subdivision)

  9. Feb. 10, 2026

    Plan Intake Passed

  10. Feb. 10, 2026

    Accepted for review

  11. Feb. 5, 2026

    Plan Intake Failed

  12. Feb. 4, 2026

    Application filed

Documents

Site plans

  • Eight-page set of final plat drawings prepared by Bailey Engineering, Inc., with engineer stamps and a pickleball court detail; text is mostly stamp and title-block fragments.

    Feb. 4, 2026 · 8 pages · 12.8 MB · Preliminary Plat

    Download Final subdivision plat full set

Plans

  • Approved landscape plan sheets for the Seven Maples Ranch No. 3 final subdivision plat, including weed abatement and irrigation notes.

    May 20, 2026 · 6 pages · 5.6 MB · Approved landscape plans 05-20-2026

    Download Landscape plans, updated May 18 2026 (approved)
  • Revised landscape plan sheets for the Seven Maples Ranch No. 3 subdivision, dated May 18, 2026, with general notes on weed abatement and irrigation before planting.

    May 19, 2026 · 6 pages · 5.5 MB · Updated landscape plan 05/18/2026

    Download Updated landscape plans, Seven Maples Ranch No. 3
  • Revised open space exhibit for the Seven Maples Ranch No. 3 final subdivision plat, prepared by Bailey Engineering, Inc.

    May 19, 2026 · 1 page · 628 KB · Updated Open Space Exhibit 05/18/2026

    Download Updated open space exhibit
  • Updated final plat sheet for a replat of portions of Lots 26 and 27, Covert Subdivision, with easement, right-to-farm and access notes.

    May 7, 2026 · 6 pages · 983 KB · Updated final plat 04-20-2026

    Download Final plat, Seven Maples Ranch Subdivision No. 3 (updated)
  • Landscape plan for the Seven Maples Ranch subdivision final plat, phase 3, with weed abatement and irrigation notes and a vicinity map, prepared by South Beck and Baird.

    Feb. 4, 2026 · 6 pages · 13.5 MB · Landscape Plans

    Download Landscape plan, final plat phase 3 (sheet 1 of 6)
  • Elevation drawings for the Heritage house models, including the Hailey, Willow, Bennett, Ranch Dryden, Sundance, Ruterford, town house and bungalow types.

    Feb. 4, 2026 · 7 pages · 2.3 MB · Building Elevations

    Download Building elevations for Heritage house models
  • Open space exhibit for the Seven Maples final subdivision plat, sheet 3, prepared by Bailey Engineering; the extracted text is mostly stamp and header fragments.

    Feb. 4, 2026 · 1 page · 724 KB · Open Space Exhibit

    Download Open space exhibit, sheet 3
  • Set of 22 pages of engineering drawings submitted with the final subdivision plat, prepared by Bailey Engineering, Inc. and dated Dec. 19, 2025.

    Feb. 4, 2026 · 22 pages · 12.3 MB · Improv/Const Drawings

    Download Final subdivision plat submittal set
  • Final plat showing the replat of portions of Covert Subdivision lots and a vacated right-of-way in the City of Nampa, with legend, lot and block layout, and a surveyor's narrative.

    Feb. 4, 2026 · 6 pages · 994 KB · Final Plat

    Download Final subdivision plat, Seven Maples Ranch Subdivision No. 3

Project narrative

Staff reports

  • Planning staff report recommending approval of the final plat as substantially conforming to the approved preliminary plat, with building department comments on permits and lot drainage.

    May 7, 2026 · 57 pages · 19.4 MB · Staff report for PZ

    Download Staff report for Seven Maples Ranch Subdivision No. 3 final plat

Decisions

  • Letter from Nampa Planning and Zoning Commission recommending approval of the final plat, subject to listed conditions of approval including landscape plan revisions and irrigation assessment payment.

    May 19, 2026 · 34 pages · 9.3 MB · Decision Letter

    Download Planning and Zoning Commission decision letter on final plat

Application

  • City of Nampa master application form for the final plat of Seven Maples No 3, listing applicant, owner and contractor contact details.

    Feb. 10, 2026 · 2 pages · 1.6 MB · Application

    Download Master application for final subdivision plat

Studies and reports

  • Soil, groundwater, basalt and expansive clay findings, stormwater seepage rates, and recommended pavement sections for the 7 Maples Ranch development, by Allwest, July 2022.

    Feb. 4, 2026 · 42 pages · 1.7 MB · Geotech/Soil Reports

    Download Geotechnical evaluation
  • Stamped drainage calculations for Seven Maples Ranch Subdivision No. 3, covering runoff coefficients, the Rational Method analysis, 100-year storage sizing, and attached IDF curve and maps.

    Feb. 4, 2026 · 63 pages · 3.7 MB · Storm Water Reports

    Download Drainage calculations package

Other documents

  • Submittal checklist

    Feb. 25, 2026 · Checklist

  • Affidavit of legal interest

    Feb. 4, 2026 · Affidavit of Legal Interest

  • Seven Maples No. 3 legal description

    Feb. 4, 2026 · Legal Description - Word

  • Seven Maples No. 3 legal description

    Legal description of the third phase of the Seven Maples subdivision, filed with the final subdivision plat application.

    Feb. 4, 2026 · Legal Description

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.