Skip to content

Planning project · Planning application

337-unit affordable housing complex with structured parking approved

The Design Review Commission approved a mixed-use project on 4.68 acres after a Feb. 12 hearing. Earlier plans described two buildings with ground-floor commercial space and roughly 400 structured parking spaces. The decision was made May 15.

ApprovedPLN25-00625Filed July 23, 2025Lusk District · 1025 S Capitol Blvd+8 related filings
Site plan for 337-unit affordable housing complex with structured parking approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Mixed-use affordable housing project with associated structured parking.

Project name on file: 1025 S Capitol Blvd

Timeline

  1. Aug. 26, 2026

    Pending Application Submittal: Planning Applications in Review

  2. July 10, 2026

    Planning Applications: Generate Additional Application

  3. Feb. 18, 2026

    Pending Application Submittal: Planning Applications in Review

  4. Feb. 12, 2026

    Public hearing: Hybrid

  5. Feb. 12, 2026

    IDR Review Complete: IDR Complete

  6. Jan. 27, 2026

    Neighborhood Meeting Review: Completed

  7. Dec. 29, 2025

    Concept Review Complete: Generate AWS

  8. Dec. 29, 2025

    Concept Review Complete: CR Complete - Type 3

  9. July 23, 2025

    Application Submittal: Online

  10. July 23, 2025

    Application filed

Documents

Site plans

  • Ground-level site plan showing labeled areas such as parking, refuse, loading, retail units, residential lobby, lounge, and amenity spaces; text is mostly room labels with no narrative.

    Dec. 19, 2025 · 1 page · 3.7 MB · PDS-Other Small Docs

    Download Site plan sheet with building floor labels
  • Planner's summary of a concept review for a mixed-use project with 500+ residential units, podium parking, and some affordable units, including neighborhood meeting and IDR requirements.

    July 24, 2025 · 4 pages · 456 KB · PDS-Concept Review Summary Report

    Download Concept review meeting summary

Plans

  • Architectural level 01 site plan for the multifamily project, showing parking count (358 total), setbacks, garage, lobby and service areas, and retail and food truck spaces.

    Jan. 30, 2026 · 5 pages · 11.4 MB · PDS-Other Small Docs

    Download Level 01 site plan, IDR-10 sheet

Project narrative

  • Advisory summary of a Type 3 concept review for a proposed multi-family housing project, covering units, parking, access, required applications and water supply review.

    Dec. 29, 2025 · 3 pages · 468 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Describes a mixed-use redevelopment with 360 low-income housing units, about 10,000 square feet of ground-floor commercial space, and a public-private partnership with J Fisher Companies.

    Dec. 19, 2025 · 1 page · 97 KB · PDS-Other Small Docs

    Download Project narrative

Notices

  • Invitation from the applicant to a Jan. 22, 2026 neighborhood meeting at a restaurant, describing a proposed mixed-use development with housing, parking and commercial space, plus the applications being filed.

    Jan. 27, 2026 · 27 pages · 3.5 MB · PDS-Other Small Docs

    Download Neighborhood meeting invitation letter, Jan. 22 meeting

Application

  • Application for deed-restricted low-income apartments, parking structures and ground-floor commercial space in an MX-5 zone, filed by J Fisher Companies for the City of Boise.

    July 23, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form

Studies and reports

  • Summary of the February 12, 2026 interdepartmental review meeting covering a mixed-income housing and commercial project, with department and agency recommendations.

    Feb. 19, 2026 · 11 pages · 2.4 MB · PDS-Interdepartmental Review Summary Report

    Download Interdepartmental review summary report

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.