Skip to content

Planning project · Planning application

Parking lot resurfacing and redesign approved for library site

The city approved plans to resurface and redesign the parking lot on a 2.38-acre site with a library. The building itself would not change. Staff approved the project on Aug. 7.

ApprovedPLN26-00415Filed May 1, 2026Downtown Boise · 715 S Capitol Blvd+1 related filing
Site plan for Parking lot resurfacing and redesign approved for library site
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Parking Lot Improvements

Project name on file: 715 S CAPITOL BLVD

Timeline

  1. Aug. 7, 2026

    Planning Applications: Project Entitled

  2. July 10, 2026

    Pending Application Submittal: Planning Applications in Review

  3. May 6, 2026

    Concept Review Complete: CR Complete - Type 2

  4. May 1, 2026

    Application Submittal: Online

  5. May 1, 2026

    Application filed

Documents

Site plans

  • Concept plan for the library campus showing paving, parking, EV charging, bike storage, bioretention and stormwater treatment features, keyed to numbered notes.

    May 4, 2026 · 1 page · 2.1 MB · PDS-Other Small Docs

    Download Concept site plan with keynoted improvements

Project narrative

  • Planner's advisory summary for a plan to resurface and redesign the library parking lot with no building changes, noting parking code requirements and a Design Review - Minor application.

    May 6, 2026 · 1 page · 459 KB · PDS-Concept Review Summary Report

    Download Concept review summary for library parking lot
  • Narrative from the City of Boise Public Works describing planned parking lot renovations at the downtown library campus, including stormwater treatment, micro-mobility hubs and EV charging.

    May 4, 2026 · 1 page · 106 KB · PDS-Other Small Docs

    Download Project description narrative

Application

  • Application from Cushing Terrell for the City of Boise to renovate downtown library campus parking lots with stormwater treatment, micro-mobility hubs and EV charger infrastructure.

    May 1, 2026 · 2 pages · 158 KB · PDS-Application

    Download Planning project application form

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.