Skip to content

Zoning certificate · Planning application

Approved: one-bedroom accessory dwelling unit with shop behind a Boise home

The city approved a single-story detached shop with a one-bedroom accessory unit of about 897 square feet at the rear of the lot. The gravel driveway must be paved and buffered, and the shop may not be used commercially.

ApprovedCZC25-00260Filed Dec. 8, 2025Borah · 1164 S Wild Phlox Way+1 related filing
Site plan for Approved: one-bedroom accessory dwelling unit with shop behind a Boise home
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

The owner of 1164 S Wild Phlox Way in Boise received approval to build a 1,677 square foot single-story detached shop with a one-bedroom accessory dwelling unit of about 897 square feet at the rear of the lot. The house will still look like a single-family home from the street, and the existing gravel driveway was recognized as a legal nonconforming feature.

ADU

Project name on file: 1164 S WILD PHLOX WAY

Timeline

  1. March 6, 2026

    PDS Refund: Complete

    incorrect fee was access - Partial refund

  2. Feb. 3, 2026

    Appeal Period: Completed

  3. Jan. 23, 2026

    Review Complete: Completed

  4. Jan. 23, 2026

    Current Planning: Complete

  5. Jan. 14, 2026

    Current Planning: In Review

  6. Jan. 14, 2026

    Assign Reviewers: Completed

  7. Jan. 13, 2026

    Review Complete: Corrections Required

  8. Jan. 13, 2026

    Current Planning: Corrections Required

  9. Dec. 24, 2025

    Current Planning: In Review

  10. Dec. 24, 2025

    Assign Reviewers: Completed

  11. Dec. 22, 2025

    Fee Payment: Payment Received

  12. Dec. 19, 2025

    Prescreen Review: Passed

  13. Dec. 19, 2025

    Prescreen Review: Corrections Required

  14. Dec. 19, 2025

    Prescreen Review: In Progress

  15. Dec. 18, 2025

    Prescreen Review: Corrections Required

  16. Dec. 17, 2025

    Prescreen Review: In Progress

  17. Dec. 8, 2025

    Application Submittal: ePlanReview

  18. Dec. 8, 2025

    Application filed

Documents

Site plans

  • Site plan for a single-family home on a residential lot, with general notes, design loads, and energy code requirements shown on the sheet.

    Jan. 7, 2026 · 1 page · 275 KB · PDS-Maps and Drawings

    Download Architectural site plan

Plans

  • Foundation notes, foundation schedule and foundation plan sheet S1 for a residential build, with a joist and truss manufacturer note on the following page.

    Jan. 7, 2026 · 8 pages · 751 KB · PDS-Maps and Drawings

    Download Foundation plan and notes
  • Lists the building's exterior materials and colors: horizontal cottage-style hardboard lap siding, black architectural shingles, a metal insulated garage door painted to match trim, and white window frames.

    Jan. 7, 2026 · 1 page · 97 KB · PDS-Maps and Drawings

    Download Elevations and materials

Project narrative

  • Applicant's letter describing the proposed detached ADU with one bedroom and attached personal shop, its design intent, and site characteristics under Boise City Code.

    Jan. 7, 2026 · 2 pages · 110 KB · PDS-Letter of Intent

    Download Letter of intent for accessory dwelling unit

Decisions

  • Planning and Development Services letter approving legal nonconforming status for an existing gravel driveway and approving an accessory dwelling unit and an accessory structure over 1,000 square feet, with findings and…

    Jan. 23, 2026 · 14 pages · 274 KB · PDS-Action Letter

    Download Action letter approving nonconforming driveway and ADU

Notices

  • Notice that city staff approved a project establishing legal nonconforming site features and building an accessory structure over 1,000 square feet with an ADU, with appeals due Feb. 2, 2026.

    Jan. 21, 2026 · 2 pages · 645 KB · PDS-Legal Notice

    Download Notice of approval for zoning certificate

Application

  • Application for a zoning certificate to build a 1,642 sq ft accessory dwelling unit with one bedroom in the R-1C zone, filed electronically by the property owner's representative.

    Dec. 8, 2025 · 3 pages · 207 KB · PDS-Application

    Download Zoning certificate application for accessory dwelling unit

Correspondence

  • The Boise Fire Department reports no comments on the zoning certificate review, noting that building code requirements will apply and are best addressed at building permit stage.

    Jan. 23, 2026 · 1 page · 151 KB · PDS-Agency Comments

    Download Boise Fire Department comments
  • Parks and Community Forestry staff ask about an existing mature tree in the ADU footprint and encourage planting a new Class II or III tree on site.

    Jan. 23, 2026 · 1 page · 60 KB · PDS-Agency Comments

    Download Boise Parks and Recreation comments on existing tree
  • Jan. 23, 2026 · 1 page · 40 KB · PDS-Agency Comments

    Download Public Works sewer comments
  • Veolia requires a separate water service and meter for the new ADU and asks that a site plan be submitted to its engineering department for review and approval.

    Jan. 23, 2026 · 1 page · 295 KB · PDS-Agency Comments

    Download Veolia Water Idaho comments
  • ACHD finds no adjacent street improvements required, lists traffic impact fee, driveway permit and right-of-way conditions, and attaches standard conditions of approval.

    Jan. 21, 2026 · 3 pages · 183 KB · PDS-Agency Comments

    Download Ada County Highway District comments
  • Jan. 20, 2026 · 1 page · 195 KB · PDS-Agency Comments

    Download PDS-Agency Comments - WEST BOISE SEWER DISTRICT COMMENT - 1/20/26
  • Veolia Water Idaho reports water pressure and hydrant flow available for the site under maximum-day conditions, for use in fire sprinkler design.

    Jan. 7, 2026 · 1 page · 132 KB · PDS-Other Small Docs

    Download Veolia water pressure and fire flow letter

Other documents

  • Noticing radius map

    Jan. 21, 2026 · 518 KB · PDS-Maps and Drawings

  • Scanned material delivery tickets from June 2021 for clean chips and a Google Street View capture, submitted as supporting evidence; the text is largely illegible OCR.

    Jan. 15, 2026 · 4 pages · 5.3 MB · PDS-Other Small Docs

    Download Legal nonconforming use documentation
  • Receipt

    Jan. 15, 2026 · 135 KB · PDS-Receipts

  • Transmittal to agencies

    Jan. 13, 2026 · 100 KB · PDS-Transmittal Agencies

  • Statement of legal interest

    Jan. 7, 2026 · 1.4 MB · PDS-Statement of Legal Interest

  • Receipt

    Dec. 22, 2025 · 136 KB · PDS-Receipts

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.