Skip to content

Design review · Planning application

Boise approves bike and EV parking changes for 268-unit apartment building

The six-story building keeps 338 vehicle stalls but drops all planned electric vehicle charging stations. Long-term bike parking falls to one space per unit, or 298 spaces. The change was approved May 11 with conditions on construction hours and lighting.

ApprovedDRH26-00124Filed April 30, 2026West Boise · 12565 W Fairview Ave+4 related filings
Site plan for Boise approves bike and EV parking changes for 268-unit apartment building
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

The city approved a change to a previously approved six-story, 268-unit apartment building with structured parking at 12565 W Fairview Ave. The change removes all planned electric vehicle charging stations and cuts long-term bicycle parking to one space per unit, or 298 spaces. Vehicle parking stays at 338 stalls.

DR MOD for DRH25-00202 modification of approved bike parking and Ev parking per amended code

Project name on file: 12565 W FAIRVIEW AVE

Timeline

  1. May 22, 2026

    Appeal Period: Completed

  2. May 11, 2026

    Review Complete: Completed

  3. May 11, 2026

    DR: Complete

  4. May 4, 2026

    DR: In Review

  5. May 4, 2026

    Assign Reviewers: Completed

  6. May 1, 2026

    Fee Payment: Payment Received

  7. May 1, 2026

    Prescreen Review: Passed

  8. April 30, 2026

    Prescreen Review: In Progress

  9. April 30, 2026

    Application Submittal: ePlanReview

  10. April 30, 2026

    Application filed

Documents

Site plans

  • Site plan sheet with unit and area schedules, listing gross building areas, unit counts by level, and unit mix for the Design Review application.

    May 5, 2026 · 1 page · 1.5 MB · PDS-Maps and Drawings

    Download Site plan and project data

Plans

  • Concept elevation drawings showing exterior materials such as EIFS, brick veneer, vertical metal panels, storefront and vinyl windows, with level heights up to the 70-foot maximum building height.

    May 5, 2026 · 1 page · 4.7 MB · PDS-Maps and Drawings

    Download Building elevations (concept, east, south and north)
  • Material and color legend for the building, listing siding, brick, windows, steel elements, soffits and paint colors, with a concept view of the southeast corner.

    May 5, 2026 · 1 page · 4.3 MB · PDS-Maps and Drawings

    Download Building materials legend and color palette
  • Material and color legend for the building, with keyed material types, paint colors and a concept view of the southwest corner.

    May 5, 2026 · 1 page · 3.7 MB · PDS-Maps and Drawings

    Download Building materials legend and color board
  • Concept floor plans for the first two levels, showing unit layouts with square footages, amenity and trash areas, and ground-floor street frontage measurements for the Design Review application.

    May 5, 2026 · 1 page · 2.4 MB · PDS-Maps and Drawings

    Download Level 1 and 2 floor plans

Project narrative

  • Letter from the applicant's architect proposing to reduce bicycle parking from 380 to 296 spaces and remove EV charging stations, per the revised zoning code.

    May 5, 2026 · 1 page · 41 KB · PDS-Letter of Intent

    Download Design review modification letter of intent

Decisions

Notices

  • Planning and Development Services notice that a modification to the EV parking and long-term bicycle parking plan for a multifamily project in a MX-3 zone was approved, with appeal instructions.

    May 6, 2026 · 2 pages · 689 KB · PDS-Legal Notice

    Download Notice of approval for EV and bicycle parking modification

Application

  • Application modifying previously approved bike and EV parking to meet amended code, with site footprint figures, MX-3 zoning, and noted utility hazards.

    April 30, 2026 · 15 pages · 292 KB · PDS-Application

    Download Design review application for parking modification

Other documents

  • Noticing radius map

    May 6, 2026 · 529 KB · PDS-Maps and Drawings

  • Statement of legal interest

    May 5, 2026 · 234 KB · PDS-Statement of Legal Interest

  • Fee receipt

    May 1, 2026 · 135 KB · PDS-Receipts

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.