Skip to content

Planning project · Planning application

Second-story apartment proposed above existing garage, needing a variance

The plan would add one or two accessory dwelling units on top of an existing garage behind a single-family home. A variance is needed because the garage sits in the rear setback by the alley. The Hearing Examiner will decide.

In reviewPLN26-00344Filed April 14, 2026South Boise Village · 1529 S Vermont Ave+3 related filings
Site plan for Second-story apartment proposed above existing garage, needing a variance
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

ADU addition

Project name on file: 1529 S VERMONT AVE

Timeline

  1. June 29, 2026

    Pending Application Submittal: Planning Applications in Review

  2. June 29, 2026

    IDR Review Complete: IDR Waived

  3. June 29, 2026

    Neighborhood Meeting Review: Completed

  4. May 5, 2026

    Concept Review Complete: CR Complete - Type 3

  5. April 29, 2026

    Concept Review Complete: Notes

    Pending applications for updated Site Plan (1 or 2 ADU, build up or east)

  6. April 22, 2026

    Concept Review Complete: Notes

    Emailed for CR scheduling

  7. April 14, 2026

    Application Submittal: Online

  8. April 14, 2026

    Application filed

Documents

Site plans

  • Invitation from the applicant to a June 25, 2026 neighborhood meeting on a proposed second-story ADU above an existing detached garage, with the applications listed.

    June 26, 2026 · 8 pages · 1.7 MB · PDS-Other Small Docs

    Download Neighborhood meeting notice for June 25 meeting
  • Concept-review existing site plan for adding a second story over a detached structure to create ADUs, with setbacks, parking, and a garage nonconformity note.

    April 14, 2026 · 1 page · 545 KB · PDS-Other Small Docs

    Download Existing site plan for accessory dwelling unit project

Project narrative

  • Advisory concept review notes for a second-story ADU addition over an existing garage, covering required applications, a legal nonconforming garage, and a rear-setback variance.

    May 5, 2026 · 3 pages · 474 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Applicant's pre-application questions on adding two accessory dwelling units to a detached garage, covering unit count, parking access, and setback nonconformities.

    April 14, 2026 · 1 page · 161 KB · PDS-Other Small Docs

    Download Pre-application questions on converting garage to ADUs

Application

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.