Skip to content

Planning project · Planning application

Basement apartment in single-family home approved after being built without permit

The city approved a request to legalize a 740-square-foot accessory dwelling unit in a home's basement that was converted without permits. No new parking is proposed. The decision was made administratively on Nov. 24.

ApprovedPLN25-00602Filed July 17, 2025Winstead Park · 1618 N Hartman St+1 related filing
Site plan for Basement apartment in single-family home approved after being built without permit
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Attached ADU, retroactive permitting

Project name on file: 1618 N HARTMAN ST - ADU

Timeline

  1. Oct. 7, 2025

    Planning Applications: Project Entitled

  2. Aug. 27, 2025

    Pending Application Submittal: Planning Applications in Review

  3. Aug. 13, 2025

    Concept Review Complete: CR Complete - Type 2

  4. July 30, 2025

    Concept Review Complete: Notes

    Emailed to schedule CR 7/30.

  5. July 17, 2025

    Application Submittal: Online

  6. July 17, 2025

    Application filed

Documents

Site plans

  • Floor plan layout of a basement accessory dwelling unit showing dimensions, a 40x46 inch egress window with ladder, a furnace closet, and areas of 363.5 and 401.2 square feet.

    July 17, 2025 · 1 page · 906 KB · PDS-Other Small Docs

    Download Basement ADU site plan layout

Project narrative

  • Planner notes on permitting an existing illegally converted basement ADU, the legal nonconforming setback proof required, and ADU use-specific standards.

    Aug. 13, 2025 · 2 pages · 451 KB · PDS-Concept Review Summary Report

    Download Concept review summary for retroactive basement ADU
  • Describes a proposed basement studio-style accessory dwelling unit with a separate entrance, a bathroom with shower and egress, and a kitchen installed in 2024 with prior plumbing and electrical inspections.

    July 17, 2025 · 1 page · 46 KB · PDS-Other Small Docs

    Download Project description for basement ADU

Application

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.