Skip to content

Planning project · Planning application

Property line adjustment approved for 9.9-acre industrial site

City staff approved shifting the shared line between two industrial lots on April 28. The change is meant to prepare for a separate industrial development proposal on the eastern lot, which would need its own review.

ApprovedPLN25-01041Filed Nov. 26, 2025South Cole · 2543 S Beverly St+2 related filings
Site plan for Property line adjustment approved for 9.9-acre industrial site
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Property line adjustment

Project name on file: 2543 S BEVERLY ST

Timeline

  1. Oct. 13, 2026

    14 documents added

  2. April 28, 2026

    Planning Applications: Project Entitled

  3. Feb. 10, 2026

    Pending Application Submittal: Planning Applications in Review

  4. Dec. 10, 2025

    Concept Review Complete: CR Complete - Type 2

  5. Nov. 26, 2025

    Application Submittal: Online

  6. Nov. 26, 2025

    Application filed

Documents

Site plans

  • Page 2 of a preliminary property line adjustment survey, showing owner, planning director, surveyor and county recorder certificate blocks; the text is mostly certificate headings with no measurements.

    Nov. 26, 2025 · 1 page · 171 KB · PDS-Other Small Docs

    Download Preliminary property line adjustment survey, page 2
  • Site plan showing parking counts, EV-capable spaces, bicycle parking and fenced yard for Buildings A113 and A114.

    Nov. 26, 2025 · 1 page · 643 KB · PDS-Other Small Docs

    Download Site plan for Buildings A113 and A114

Plans

  • A 1972 subdivision plat for a portion of a section in Ada County, including airport-zone acknowledgments and restrictive covenant references.

    Nov. 26, 2025 · 2 pages · 371 KB · PDS-Other Small Docs

    Download Plat of Suburban Land Tracts Unit No. 1

Project narrative

  • Advisory staff notes for a proposed property line adjustment between two lots, requiring a Record of Survey, with future frontage improvements tied to a related industrial project.

    Dec. 10, 2025 · 2 pages · 451 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Page 1 of a preliminary survey for a property line adjustment, with a legend, line table, easements, notes, survey references, and a surveyor's narrative.

    Nov. 26, 2025 · 1 page · 264 KB · PDS-Other Small Docs

    Download Preliminary property line adjustment survey, page 1
  • Surveyor's cover letter stating that the property line adjustment and parcel consolidation accommodate the site development shown on the attached site plan.

    Nov. 26, 2025 · 1 page · 164 KB · PDS-Other Small Docs

    Download Project description letter for property line adjustment

Application

  • Application form for a light industrial development on a city-owned I-1 zoned parcel, filed by a land surveying firm on behalf of the owner.

    Nov. 26, 2025 · 2 pages · 158 KB · PDS-Application

    Download Planning project application form

Correspondence

  • Airport staff has no objection to two speculative industrial buildings and a contractor yard, noting airport influence area C sound attenuation, lighting, and bird-hazard conditions.

    Jan. 6, 2026 · 2 pages · 212 KB · PDS-Other Small Docs

    Download Boise Airport preliminary comments

Other documents

  • Affidavit of legal interest

    Nov. 26, 2025 · 49 KB · PDS-Other Small Docs

  • Preliminary legal description

    Nov. 26, 2025 · 115 KB · PDS-Other Small Docs

  • Preliminary legal description

    Nov. 26, 2025 · 115 KB · PDS-Other Small Docs

  • Right-of-way deed

    Nov. 26, 2025 · 551 KB · PDS-Other Small Docs

  • Warranty deed

    Nov. 26, 2025 · 129 KB · PDS-Other Small Docs

  • Warranty deed

    Nov. 26, 2025 · 151 KB · PDS-Other Small Docs

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.