Zoning certificate · Planning application

Demolition of house and storage building approved for Boise School District site

The city approved demolishing a single-family house and an accessory structure, with conditions including an arborist report and vegetative groundcover. The district plans a later stadium expansion and open space; this approval allows no new construction.

ApprovedCZC26-00161Filed Aug. 25, 2026Southeast Boise · 2605 S Utter St+9 related filings
Site plan for Demolition of house and storage building approved for Boise School District site
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

The city approved a request to demolish a single-family house and an accessory structure at 2605 S Utter St in Boise. The approval covers demolition only and does not allow any new construction.

Demolition

Project name on file: 2605 S Utter St - Demolition

Timeline

  1. Oct. 13, 2026

    Appeal Period: Completed

  2. Oct. 2, 2026

    Review Complete: Completed

  3. Oct. 2, 2026

    DR: Complete

  4. Sept. 15, 2026

    DR: In Review

  5. Sept. 15, 2026

    Assign Reviewers: Completed

  6. Sept. 11, 2026

    Fee Payment: Payment Received

  7. Aug. 28, 2026

    Prescreen Review: Passed

  8. Aug. 26, 2026

    Prescreen Review: In Progress

  9. Aug. 25, 2026

    Application Submittal: ePlanReview

  10. Aug. 25, 2026

    Application filed

Documents

Site plans

  • Contractor notes on utility locating, tree removal under 4 inches requiring no mitigation, ADA compliance in the right-of-way, and protection of existing school district facilities.

    Sept. 17, 2026 · 1 page · 891 KB · PDS-Maps and Drawings

    Download Site plan sheet notes (demolition and construction)

Plans

  • Erosion and sediment control plan sheet with legend, general notes, BMP references, and an erosivity waiver for a small construction project with a May to October 2026 schedule.

    Sept. 17, 2026 · 1 page · 1.0 MB · PDS-Maps and Drawings

    Download Erosion and sediment control plan, sheet C2.00
  • Cover sheet for the Timberline Landscape Repair drawing set, with general notes, tree protection notes, a vicinity map, and site zoning and setback data.

    Sept. 17, 2026 · 1 page · 890 KB · PDS-Maps and Drawings

    Download Cover sheet for landscape repair plans
  • Detail sheets for erosion and sediment control measures, including concrete washout, fiber roll, and stabilized construction entrance specifications with notes.

    Sept. 17, 2026 · 1 page · 766 KB · PDS-Maps and Drawings

    Download Erosion and sediment control details
  • Sheet of existing utilities and demolition notes, including contractor duties to verify underground utility locations, protect monuments and keep school facilities operating.

    Sept. 17, 2026 · 1 page · 1.5 MB · PDS-Maps and Drawings

    Download Existing conditions and demolition plan
  • Irrigation plan sheet with system notes covering sleeve installation, controller wiring, pop-up head replacement, electrical requirements and trenching cleanup.

    Sept. 17, 2026 · 1 page · 913 KB · PDS-Maps and Drawings

    Download Irrigation plan, sheet L2.00
  • Irrigation schedule listing turf rotor heads, remote control valves, controllers and trench and sleeving sections for the landscape plan.

    Sept. 17, 2026 · 1 page · 940 KB · PDS-Maps and Drawings

    Download Irrigation details and schedule
  • Construction detail sheet for a 4-foot chain link fence, with post, footing, fabric and gate specifications and a sizing table, marked not for construction.

    Sept. 17, 2026 · 1 page · 752 KB · PDS-Maps and Drawings

    Download Chain link fence site detail sheet
  • Sheet listing existing trees by size, species, condition and whether each is retained or removed, with notes on replacement requirements under city code.

    Sept. 17, 2026 · 1 page · 834 KB · PDS-Maps and Drawings

    Download Tree inventory plan

Project narrative

  • Boise School District requests a zoning certificate to demolish existing structures on a 0.77-acre parcel, preparing it for a future stadium expansion and open space as part of a larger rezone and lot consolidation.

    Sept. 17, 2026 · 1 page · 91 KB · PDS-Letter of Intent

    Download Letter of intent for demolition zoning certificate

Decisions

  • Approval letter for demolition of a single-family dwelling and accessory structure, with conditions on arborist reports, tree mitigation, permits and site stabilization.

    Oct. 2, 2026 · 3 pages · 177 KB · PDS-Action Letter

    Download Zoning certificate approval with conditions of approval

Notices

  • Approval notice for demolition of a single-family dwelling and accessory structures in an R-1C zone; appeals must be filed by October 12, 2026, with applicable fees.

    Sept. 30, 2026 · 2 pages · 798 KB · PDS-Legal Notice

    Download Notice of approval for demolition

Application

  • Application by The Land Group, Inc. for a demolition zoning certificate on a 7.75-acre A-1 zoned parcel owned by Boise Independent School District.

    Sept. 17, 2026 · 3 pages · 204 KB · PDS-Application

    Download Zoning certificate application for demolition
  • Application by The Land Group, Inc. for a demolition zoning certificate on a 7.75-acre A-1 zoned parcel owned by Boise Independent School District.

    Aug. 25, 2026 · 3 pages · 204 KB · PDS-Application

    Download Zoning certificate application for demolition

Photos

  • Two pages of site photographs, with an aerial map showing parcel and road layers and a disclaimer that the map is for general reference only.

    Sept. 17, 2026 · 2 pages · 12.8 MB · PDS-Photos

    Download Site photos

Correspondence

  • The Boise Fire Department has no comments on the zoning certificate application, noting that IBC, IFC and city code requirements will apply at building permit stage.

    Oct. 2, 2026 · 1 page · 151 KB · PDS-Agency Comments

    Download Boise Fire Department comments
  • Public Works states no objection to the demolition, notes sewer connection is required for new plumbing and that sewer capacity fees may apply at building permit.

    Oct. 2, 2026 · 1 page · 65 KB · PDS-Agency Comments

    Download Public Works sewer comments
  • Veolia Water Idaho's letter reporting available water pressure and flow at a nearby hydrant, for fire sprinkler design and Fire Department review.

    Sept. 17, 2026 · 1 page · 110 KB · PDS-Other Small Docs

    Download Veolia water pressure and fire flow information

Other documents

  • Noticing radius map

    Sept. 30, 2026 · 693 KB · PDS-Maps and Drawings

  • Statement of legal interest

    Sept. 17, 2026 · 122 KB · PDS-Statement of Legal Interest

  • Submittal checklist

    Sept. 17, 2026 · 865 KB · PDS-Submittal Checklist

  • Transmittal to review agencies

    Sept. 17, 2026 · 133 KB · PDS-Transmittal Agencies

  • Receipt

    Sept. 11, 2026 · 130 KB · PDS-Receipts

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.