Zoning certificate · Planning application

Demolition of house and shop approved for Boise School District stadium plans

The city approved tearing down a single-family house and an accessory building. The district plans to later combine the lot with neighboring parcels for a stadium expansion. Approval covers demolition only; tree and site-stabilization conditions apply.

ApprovedCZC26-00162Filed Aug. 25, 2026Southeast Boise · 396 E Linden St+9 related filings
Site plan for Demolition of house and shop approved for Boise School District stadium plans
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

The city approved a request to demolish a single-family house and an accessory structure at 396 E Linden St in Boise. The approval covers demolition only and does not allow any new construction on the site.

Demolition of SFD and accessory structure

Project name on file: 396 E Linden St - Demolition

Timeline

  1. Sept. 29, 2026

    Appeal Period: Completed

  2. Sept. 18, 2026

    Review Complete: Completed

  3. Sept. 18, 2026

    DR: Complete

  4. Sept. 1, 2026

    DR: In Review

  5. Sept. 1, 2026

    Assign Reviewers: Completed

  6. Aug. 31, 2026

    Fee Payment: Payment Received

  7. Aug. 28, 2026

    Prescreen Review: Passed

  8. Aug. 26, 2026

    Prescreen Review: In Progress

  9. Aug. 25, 2026

    Application Submittal: ePlanReview

  10. Aug. 25, 2026

    Application filed

Documents

Site plans

  • Contractor notes on demolition, utility location and tree removal (trees under 4-inch caliper, no mitigation), with school facility access and ADA requirements.

    Sept. 9, 2026 · 1 page · 891 KB · PDS-Maps and Drawings

    Download Site plan sheet notes on demolition and utilities

Plans

  • Cover sheet for the Timberline Landscape Repair drawing set, with general notes, tree protection notes, a vicinity map, and site zoning and setback data.

    Sept. 9, 2026 · 1 page · 890 KB · PDS-Maps and Drawings

    Download Cover sheet for landscape repair plans
  • Detail sheets for erosion and sediment control measures, including concrete washout, fiber roll, and stabilized construction entrance specifications with notes.

    Sept. 9, 2026 · 1 page · 766 KB · PDS-Maps and Drawings

    Download Erosion and sediment control details
  • Erosion and sediment control plan sheet with the site's ESC legend, general notes, BMP references, and a stated erosivity index of 3.25 for a planned May to October 2026 construction period.

    Sept. 9, 2026 · 1 page · 1.0 MB · PDS-Maps and Drawings

    Download Erosion and sediment control plan
  • Sheet of existing utilities and demolition notes, including contractor duties to verify underground utility locations, protect monuments and keep school facilities operating.

    Sept. 9, 2026 · 1 page · 1.5 MB · PDS-Maps and Drawings

    Download Existing conditions and demolition plan
  • Irrigation schedule listing rotor heads, valves and controllers, with trench, sleeving and mainline isolation valve detail sections and installation notes.

    Sept. 9, 2026 · 1 page · 940 KB · PDS-Maps and Drawings

    Download Irrigation details and schedule
  • General irrigation notes covering system design assumptions, utility coordination, sleeve installation, controller wiring, and electrical requirements.

    Sept. 9, 2026 · 1 page · 913 KB · PDS-Maps and Drawings

    Download Irrigation plan notes
  • Construction detail sheet for a 4-foot chain link fence, with post, footing, fabric and gate specifications and a sizing table, marked not for construction.

    Sept. 9, 2026 · 1 page · 752 KB · PDS-Maps and Drawings

    Download Chain link fence site detail sheet
  • Sheet listing existing trees by size, species, condition and whether each is retained or removed, with notes on replacement requirements under city code.

    Sept. 9, 2026 · 1 page · 834 KB · PDS-Maps and Drawings

    Download Tree inventory plan

Project narrative

  • Boise School District letter requesting a zoning certificate to demolish a home and shop on about 0.7 acres to prepare the site for a future stadium expansion and open space.

    Sept. 9, 2026 · 1 page · 91 KB · PDS-Letter of Intent

    Download Letter of intent for demolition zoning certificate

Decisions

  • Planning and Development Services approved a demolition of a single-family dwelling and accessory structure, with conditions on arborist reports, tree mitigation, permits, and site stabilization.

    Sept. 18, 2026 · 3 pages · 177 KB · PDS-Action Letter

    Download Zoning certificate approval for demolition with conditions

Notices

Application

  • Zoning certificate application for demolition of a residential lot in the A-1 zone, filed by The Land Group, Inc. for the Boise Independent School District as owner.

    Sept. 9, 2026 · 3 pages · 204 KB · PDS-Application

    Download Zoning certificate application for demolition
  • Zoning certificate application for demolition of a residential lot in the A-1 zone, filed by The Land Group, Inc. for the Boise Independent School District as owner.

    Aug. 25, 2026 · 3 pages · 204 KB · PDS-Application

    Download Zoning certificate application for demolition

Photos

  • Three pages of site photographs filed with the zoning certificate application, alongside an aerial orthophoto map and legend.

    Sept. 9, 2026 · 3 pages · 13.2 MB · PDS-Photos

    Download Site photos

Correspondence

  • Parks and Forestry staff comment on removing 11 mature trees for proposed improvements and recommend new deciduous plantings, with the arborist report still outstanding.

    Sept. 18, 2026 · 1 page · 63 KB · PDS-Agency Comments

    Download Parks and Recreation comments on tree preservation
  • Veolia Water Idaho reports available water pressure and flow at a nearby hydrant for fire sprinkler design, to be attached to approved plan sets.

    Sept. 9, 2026 · 1 page · 110 KB · PDS-Other Small Docs

    Download Veolia water flow and pressure letter for fire flow review

Other documents

  • Noticing radius map

    Sept. 16, 2026 · 578 KB · PDS-Maps and Drawings

  • Statement of legal interest

    Sept. 9, 2026 · 122 KB · PDS-Statement of Legal Interest

  • Submittal checklist

    Sept. 9, 2026 · 865 KB · PDS-Submittal Checklist

  • Transmittal sheet

    Sept. 9, 2026 · 137 KB · PDS-Transmittal Agencies

  • Receipt

    Aug. 31, 2026 · 130 KB · PDS-Receipts