Skip to content

Planning project · Planning application

Final plat sought for two single-family lots on a 0.2-acre site

The final plat would divide the roughly 0.2-acre site for two single-family homes sharing a driveway. The preliminary plat and a variance were already filed, and the plat is under city review ahead of a City Council decision.

In reviewPLN26-00165Filed Feb. 12, 2026Central Foothills · 3510 W Hill Rd+5 related filings
Site plan for Final plat sought for two single-family lots on a 0.2-acre site
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Final Plat for preliminary plat (SUB25-00059), variance (CVA25-00057)

Project name on file: 3510 W HILL RD - SUB

Timeline

  1. Feb. 18, 2026

    Pending Application Submittal: Planning Applications in Review

  2. Feb. 17, 2026

    Concept Review Complete: CR Complete - Type 4 NBR-IDR Waived

  3. Feb. 12, 2026

    Application Submittal: Online

  4. Feb. 12, 2026

    Application filed

Documents

Site plans

  • Preliminary plat for a two-lot single-family subdivision in R-3 zoning, listing lot sizes, proposed setbacks, general site notes and easements.

    Feb. 12, 2026 · 1 page · 678 KB · PDS-Other Small Docs

    Download Approved preplat plat with zoning and setback notes
  • Consultant letter describing a 2-lot single-family final plat, in substantial conformance with the approved preliminary plat, variance and floodplain permit, for two attached homes in the R-3 zone.

    Feb. 12, 2026 · 1 page · 199 KB · PDS-Other Small Docs

    Download Letter of explanation for final plat

Plans

  • Plant schedule listing coniferous, deciduous, flowering trees, shrubs, ornamental grasses and perennials with quantities, sizes and mature dimensions.

    Feb. 12, 2026 · 1 page · 1.0 MB · PDS-Other Small Docs

    Download Landscape plan plant schedule

Project narrative

  • Advisory concept review summary for a two-unit single-family subdivision final plat, noting it follows a preliminary plat and a variance, with access via a shared driveway.

    Feb. 17, 2026 · 1 page · 448 KB · PDS-Concept Review Summary Report

    Download Concept review summary report

Application

  • Application for a final plat creating 2 lots, in substantial conformance with the approved preliminary plat, filed by Rodney Evans + Partners, LLC.

    Feb. 12, 2026 · 2 pages · 158 KB · PDS-Application

    Download Planning project application form

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.