Skip to content

Subdivision · Planning application

Final approval sought for splitting vacant lot into two for attached homes

The City Council is asked to approve the final plat dividing a 0.2-acre site into two lots for attached single-family homes sharing one driveway. The Council approved the preliminary plat in January 2026 and takes up the final plat at its May 5 meeting.

In reviewSUB26-00008Filed Feb. 18, 2026Central Foothills · 3510 W Hill Rd+5 related filings
Site plan for Final approval sought for splitting vacant lot into two for attached homes
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

The applicant is asking the Boise City Council for final approval of the McArthur Subdivision, which splits a 0.21-acre site at 3510 W Hill Road into two lots for attached single-family homes. The two lots would share one driveway onto Hill Road, and the existing sidewalk would stay. The final plat follows the preliminary plat the Council approved in January 2026.

Final Plat for preliminary plat (SUB25-00059), variance (CVA25-00057)

Project name on file: McArthur Subdivision

Timeline

  1. April 24, 2026

    Review Complete: Completed

  2. April 24, 2026

    Current Planning: Complete

  3. March 17, 2026

    Current Planning: In Review

  4. March 17, 2026

    Assign Reviewers: Completed

  5. Feb. 18, 2026

    Fee Payment: Payment Received

  6. Feb. 18, 2026

    Prescreen Review: Passed

  7. Feb. 18, 2026

    Prescreen Review: In Progress

  8. Feb. 18, 2026

    Application Submittal: ePlanReview

  9. Feb. 18, 2026

    Application filed

Documents

Plans

  • Plant schedule for the subdivision landscape plan, listing trees, shrubs, grasses and perennials with planting sizes and mature dimensions.

    March 19, 2026 · 1 page · 1.0 MB · PDS-Maps and Drawings

    Download Landscape plan plant schedule
  • Final plat sheet with survey notes on basis of bearing, setbacks, shared drive access, water supply restrictions, irrigation status, and flood hazard area.

    March 19, 2026 · 3 pages · 2.3 MB · PDS-Maps and Drawings

    Download Final subdivision plat

Project narrative

  • Applicant's letter describing a two-lot final plat for a single-family subdivision in the R-3 zone, substantially conforming to the approved preliminary plat, variance and floodplain permit.

    March 19, 2026 · 1 page · 201 KB · PDS-Letter of Intent

    Download Letter of explanation for final plat

Staff reports

  • Staff recommendation for approval of the final plat for a two-lot residential subdivision, with proposed conditions of approval and agency comments.

    April 29, 2026 · 30 pages · 8.0 MB · PDS-Project Report/Memo

    Download Staff report for the May 5, 2026 City Council meeting

Application

  • Application form for the final plat of a two-lot residential subdivision, filed as the final step after a preliminary plat and variance, with the owner and applicant contacts listed.

    Feb. 18, 2026 · 3 pages · 206 KB · PDS-Application

    Download Final subdivision plat application form

Correspondence

  • Central District Health transmittal reviewing the subdivision proposal, with checked responses on sewage, water, storm water infiltration and plan review requirements.

    April 14, 2026 · 1 page · 1.1 MB · PDS-Agency Comments

    Download Central District Health comments
  • Fire Department approval conditions for the final plat: wildland-urban interface defensible space, hydrant spacing, aerial access roads and apparatus access.

    April 14, 2026 · 2 pages · 199 KB · PDS-Agency Comments

    Download Boise Fire Department comments
  • Boise Parks and Recreation reports no comments or recommendations, and Forestry has no issue with the tree species proposed on the landscape plan.

    April 14, 2026 · 1 page · 59 KB · PDS-Agency Comments

    Download Parks and Recreation comments
  • Public Works form calculating the sewer assessment and service line fees for the subdivision, totaling $6,840.18 in subdivision fees.

    April 14, 2026 · 1 page · 97 KB · PDS-Agency Comments

    Download Sewer assessment fee form, 8-inch equivalency
  • Boise Public Works standard conditions for pressurized irrigation and sewer on the subdivision, from a March 23, 2026 memo by a civil engineer.

    April 14, 2026 · 3 pages · 171 KB · PDS-Agency Comments

    Download Public Works irrigation and sewer conditions
  • Public Works solid waste staff note the site is approved for residential cart service, with carts taken to the curb for pickup or carry-out fees applying, and link trash enclosure design standards.

    April 14, 2026 · 1 page · 86 KB · PDS-Agency Comments

    Download Solid Waste comments
  • Public Works street light trades supervisor reports no comments on the subdivision application.

    April 14, 2026 · 1 page · 125 KB · PDS-Agency Comments

    Download Street light department comments
  • Water utility's requirements for the subdivision: a will-serve letter, site plan review, separate service lines and meters per building, and standards for the existing service.

    April 14, 2026 · 1 page · 375 KB · PDS-Agency Comments

    Download Veolia Water Idaho comments

Other documents

  • Agency transmittal

    March 23, 2026 · 136 KB · PDS-Transmittal Agencies

  • Statement of legal interest

    March 19, 2026 · 149 KB · PDS-Statement of Legal Interest

  • Receipt

    Feb. 18, 2026 · 134 KB · PDS-Receipts

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.