Irrigation district gets approval for boulder retaining wall up to 10 feet tall

The Nampa Meridian Irrigation District's rockery wall, less than 100 feet long, will widen an access drive for maintenance. The city approved the permit administratively with conditions on drainage and wall heights.

ApprovedCFH25-00014Filed Feb. 18, 2025Southeast Boise · 3960 S Eckert Rd+2 related filings
Site plan for Irrigation district gets approval for boulder retaining wall up to 10 feet tall
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

The Nampa Meridian Irrigation District plans to build a boulder retaining wall, up to 10 feet tall, at 3960 S Eckert Rd in Boise's foothills. The wall will support a widened access road. The city's planning department approved the permit administratively.

Boise River System Permit and Cat II Hillside

Project name on file: 3960 S ECKERT RD - CFH

Timeline

  1. July 8, 2025

    Appeal Period: Completed

  2. June 27, 2025

    Review Complete: Completed

  3. June 27, 2025

    Current Planning: Complete

  4. April 21, 2025

    Current Planning: In Review

  5. April 21, 2025

    Assign Reviewers: Completed

  6. April 17, 2025

    Fee Payment: Payment Received

  7. April 17, 2025

    Prescreen Review: Passed

  8. April 15, 2025

    Prescreen Review: In Progress

  9. March 3, 2025

    Application Submittal: ePlanReview

    Updated missing fields in Project Details to generate the ePlan case.

  10. Feb. 18, 2025

    Application filed

Documents

Site plans

  • Site plan dated April 17, 2025 showing the existing house, a new retaining wall, sediment control and parcel boundaries, with zoning R-1A and about 1.8 acres.

    April 24, 2025 · 1 page · 7.9 MB · PDS-Maps and Drawings

    Download Detailed site plan with retaining wall and sediment control

Plans

  • Grading plan dated Apr. 17, 2025 showing existing and proposed contours, grading conditions requiring subgrade and final inspections, and cut and fill volumes for the site.

    April 24, 2025 · 1 page · 1.3 MB · PDS-Maps and Drawings

    Download Grading plan, sheet with general notes and grading conditions

Project narrative

  • Describes a rockery wall under 100 feet long, four to ten feet high, widening an access drive for irrigation district maintenance, disturbing under 0.04 acres.

    April 24, 2025 · 1 page · 50 KB · PDS-Letter of Intent

    Download Letter of intent for rockery wall along access drive

Decisions

  • Approval letter for a Category II Hillside and Foothills permit to build a 10-foot boulder retaining wall, subject to a swale and foundation drain revisions before building permit.

    June 27, 2025 · 6 pages · 222 KB · PDS-Action Letter

    Download Administrative approval letter for Hillside development permit

Notices

Application

  • Application for a Category II hillside and foothills review covering a 1.81-acre R-1A parcel in a floodplain and wildland-urban interface, with a Boise River System Permit requested.

    April 28, 2025 · 2 pages · 198 KB · PDS-Application

    Download Hillside and foothills development application

Studies and reports

  • Geotechnical memorandum presenting hand auger findings and preliminary design recommendations for a proposed rockery retaining wall widening the Ridenbaugh Canal Diversion Dam access road.

    June 27, 2025 · 11 pages · 2.8 MB · PDS-Other Small Docs

    Download Geotechnical memo on left bank access road rockery wall
  • Revised grading plan sheet with general grading notes, cut and fill figures, and a boulder retaining wall detail along the Ridenbaugh Canal area.

    June 12, 2025 · 1 page · 1.4 MB · PDS-Maps and Drawings

    Download Revised grading plan, stamped and dated June 12, 2025
  • Memorandum presenting hand auger findings and preliminary geotechnical recommendations for a proposed rockery retaining wall at the Ridenbaugh Canal Diversion Dam, prepared for RSCI Group.

    April 28, 2025 · 11 pages · 2.5 MB · PDS-Other Small Docs

    Download Geotechnical report on left bank access road rockery wall
  • Memorandum from GeoEngineers on hand auger findings and geotechnical recommendations for a proposed rockery retaining wall at the Ridenbaugh Canal Diversion Dam access road.

    April 24, 2025 · 11 pages · 1.9 MB · PDS-Other Small Docs

    Download Limited geotechnical report, left bank access road rockery wall
  • Engineer's calculations for a 12-foot boulder retaining wall, covering soil and boulder properties, earth pressures, and overturning and sliding factors of safety.

    April 24, 2025 · 4 pages · 264 KB · PDS-Other Small Docs

    Download Boulder retaining wall design calculations

Photos

  • Six dated photos from April 17, 2025 showing the approximate location and face of the rockery wall.

    April 24, 2025 · 6 pages · 32.5 MB · PDS-Photos

    Download Site photos of rockery wall

Correspondence

  • Fire department approves the rockery retaining wall along an irrigation access drive, asking the applicant to consider emergency egress from the river.

    June 27, 2025 · 2 pages · 308 KB · PDS-Agency Comments

    Download Boise Fire Department comments
  • Public Works staff find the boulder retaining wall suitable if the technical reports are followed, and require a swale and foundation drain revisions before building permit approval.

    June 27, 2025 · 3 pages · 147 KB · PDS-Agency Comments

    Download Public Works drainage and hillside comments
  • The fire department approves the retaining wall project with a comment on considering emergency egress from the river for victim rescue and transport to the parking area.

    May 16, 2025 · 2 pages · 308 KB · PDS-Agency Comments

    Download Boise Fire Department comments

Other documents

  • Noticing radius map

    Map showing the area within the notice radius for neighboring property owners who were sent notice of the application.

    June 25, 2025 · 669 KB · PDS-Maps and Drawings

  • Checklist answering whether the project involves new parcel lines, additions, dwellings, access roads, grading over 12 inches deep, and retaining walls, with walls over 4 feet exposed.

    April 24, 2025 · 1 page · 674 KB · PDS-Other Small Docs

    Download Public Works hillside project questionnaire
  • Statement of legal interest

    April 24, 2025 · 50 KB · PDS-Statement of Legal Interest

  • Submittal checklist

    April 24, 2025 · 809 KB · PDS-Submittal Checklist

  • Agency transmittal

    April 24, 2025 · 99 KB · PDS-Transmittal Agencies

  • Fee receipt

    April 17, 2025 · 131 KB · PDS-Receipts