Rezone and 4-lot subdivision for four detached homes awaits City Council decision

A developer and the property owner want to rezone a 0.33-acre lot to allow higher density and split it into four lots for single-family homes with two-car garages. A neighbor raised concerns about narrow roads and irrigation drainage. A hearing was held Jan. 29, 2026.

In reviewPLN25-00359Filed April 27, 2025Collister · 4432 W Taft St+7 related filings
Site plan for Rezone and 4-lot subdivision for four detached homes awaits City Council decision
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

A developer and the property owner are seeking to rezone a lot at 4432 W Taft St in Boise, from R-1B to R-1C, which could allow two to four houses on the site. A neighbor's letter raises concerns about narrow road conditions and irrigation drainage on the property.

Rezone and 4-lot subdivision.

Project name on file: 4432 W TAFT ST

Timeline

  1. Oct. 13, 2026

    11 documents added

  2. March 15, 2026

    Pending Application Submittal: Planning Applications in Review

  3. Feb. 3, 2026

    IDR Review Complete: IDR Complete

  4. Jan. 29, 2026

    Public hearing: Hybrid

  5. Jan. 15, 2026

    Neighborhood Meeting Review: Completed

  6. Oct. 8, 2025

    Concept Review Complete: Generate AWS

  7. Oct. 8, 2025

    Concept Review Complete: CR Complete - Type 4

  8. Oct. 7, 2025

    Concept Review Complete: Notes

    Reset WF to Concept Review per S. Mortensen.

  9. May 22, 2025

    Concept Review Complete: CR Complete - Type 4

  10. May 22, 2025

    Concept Review Complete: CR Complete - Type 2

  11. May 14, 2025

    Concept Review Complete: Notes

    Sent preliminary email discussing the need for a Comprehensive Plan Amendment R-2 is not compatible with Suburban Future Land Use.

  12. April 27, 2025

    Application Submittal: Online

  13. April 27, 2025

    Application filed

Documents

Site plans

  • Record of survey by a licensed land surveyor showing a parcel line adjustment creating Parcels A and B, with notes that the parcels may not be divided without City of Boise approval.

    May 22, 2025 · 1 page · 425 KB · PDS-Record of Survey

    Download Record of survey for parcel line adjustment
  • Site plan dated April 27, 2025 showing proposed lot layout, setbacks, sidewalk and roadway notes, and parking for a four-home subdivision with rezoning to R2.

    April 27, 2025 · 2 pages · 1.8 MB · PDS-Other Small Docs

    Download Site plan for four-house subdivision

Plans

Project narrative

  • Advisory summary of the May 22, 2025 concept review covering a proposed rezone to R-1C and four-lot subdivision with single-family homes, plus required applications and planner notes.

    Oct. 8, 2025 · 3 pages · 465 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Planner notes for a proposed rezone to R-1C and four-lot subdivision, covering overlay standards, neighborhood plan density, and rezone approval criteria.

    Oct. 8, 2025 · 2 pages · 96 KB · PDS-Other Small Docs

    Download Concept review summary and planner recommendations
  • Advisory summary of a pre-application concept review covering a proposed rezone and four-lot single-family subdivision, with required applications and prior approval history.

    May 22, 2025 · 3 pages · 457 KB · PDS-Concept Review Summary Report

    Download Concept review summary report
  • Matson Homes proposes re-zoning the parcel to R-2, subdividing it into four lots, widening the road and piping an irrigation ditch, and building four two-story single-family homes.

    April 27, 2025 · 1 page · 47 KB · PDS-Other Small Docs

    Download Project description narrative for re-zoning and four-lot subdivision

Decisions

  • A resident's email to city staff arguing the lot was already rezoned in 2023 under the Sycamore plan and overlay, and that it should not be rezoned again.

    Jan. 5, 2026 · 7 pages · 229 KB · PDS-Other Small Docs

    Download Resident email opposing rezoning of the parcel

Notices

  • Invitation from the applicant's builder to nearby residents about a proposed rezone from R-1B to R-1C and a four-lot detached home subdivision, with a Dec. 30 meeting at 6:00 PM.

    Jan. 15, 2026 · 12 pages · 1.3 MB · PDS-Neighborhood Meeting

    Download Neighborhood meeting invitation notice for Dec. 30 meeting

Application

  • Application to rezone the parcel from R-1B to R-2, subdivide it into four lots, and build four single-family detached homes.

    April 27, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form

Studies and reports

  • Advisory summary of the Jan. 29, 2026 interdepartmental review for a rezone, subdivision and variance, with Public Works solid waste recommendations.

    Feb. 3, 2026 · 8 pages · 413 KB · PDS-Interdepartmental Review Summary Report

    Download Interdepartmental review summary report