Skip to content

Planning project · Planning application

4-story office building with ground-floor commercial space approved

The Design Review Commission approved the mixed-use building on Nov. 7. It would have about 119,000 square feet, structured parking and no homes, on a site of just over a third of an acre. Vehicle access would be from the alley.

ApprovedPLN25-00204Filed March 10, 2025North End · 500 W Washington St+5 related filings
Site plan for 4-story office building with ground-floor commercial space approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Office building

Project name on file: 500 W WASHINGTON ST

Timeline

  1. Oct. 13, 2026

    7 documents added

  2. Nov. 7, 2025

    Planning Applications: Project Entitled

  3. Oct. 9, 2025

    Planning Applications: Generate Additional Application

  4. Oct. 9, 2025

    Pending Application Submittal: Planning Applications in Review

    Updated Via Script

  5. Sept. 12, 2025

    Pending Application Submittal: Planning Applications in Review

    Updated Via Script

  6. Aug. 13, 2025

    Planning Applications: Project Entitled

  7. June 10, 2025

    Planning Applications: Notes

    WF Reset per Age and EA Change

  8. June 2, 2025

    Pending Application Submittal: Planning Applications in Review

  9. May 28, 2025

    Planning Applications: Generate Additional Application

    Regenerate child apps per S. Mortensen, due to Primary Contact change.

  10. May 23, 2025

    IDR Review Complete: IDR Complete With Recommendations

  11. May 23, 2025

    Neighborhood Meeting Review: Completed

  12. May 15, 2025

    Public hearing: Hybrid

  13. May 7, 2025

    Neighborhood Meeting Review: Notes

    AWS is Voided/Cancelled for this project. This commercial redevelopment project is not located in the Southeast Boise GWMA. AWS does not apply.

  14. April 16, 2025

    Concept Review Complete: Generate AWS

  15. April 16, 2025

    Concept Review Complete: CR Complete - Type 3

  16. April 16, 2025

    Early Assistance Review: Send to Concept Review

  17. March 19, 2025

    Early Assistance Review: Corrections Required

    Please upload a conceptual site plan and project narrative or email the documents to smortensen@cityofboise.org

  18. March 10, 2025

    Application Submittal: Online

  19. March 10, 2025

    Application filed

Documents

Site plans

  • Stack Rock Group city review set (dated 04.03.25) with an existing tree plan; notes existing trees to be removed pending an arborist report.

    April 9, 2025 · 8 pages · 2.0 MB · PDS-Other Small Docs

    Download Site plan and perspectives

Plans

  • Revised floor-area totals, bike parking requirements and stall counts (93 provided) for the building, submitted May 14, 2025.

    May 14, 2025 · 5 pages · 1.4 MB · PDS-Other Small Docs

    Download Updated building info and bike parking calculations
  • Stack Rock Group landscape sheet L010 marked preliminary, not for construction, showing existing trees with removals pending an arborist report.

    May 2, 2025 · 8 pages · 2.0 MB · PDS-Other Small Docs

    Download Existing tree plan, city review set

Project narrative

  • Boise City staff summary of an advisory concept review for a 4-story mixed-use building with structured parking, covering parking, access and bicycle parking requirements.

    April 16, 2025 · 3 pages · 461 KB · PDS-Concept Review Summary Report

    Download Concept review summary report

Notices

  • Invitation to the May 5, 2025 neighborhood meeting for a proposed four-story office building, with the notice mailing list of nearby addresses attached.

    May 23, 2025 · 8 pages · 3.5 MB · PDS-Neighborhood Meeting

    Download Neighborhood meeting invitation letter and mailing list

Application

  • Application form for an office building and parking structure in the MX-3 zone, with applicant Ahlquist and owner Idaho Farm Bureau Federation.

    March 10, 2025 · 2 pages · 154 KB · PDS-Application

    Download Planning project application form

Studies and reports

  • Summary of the May 15, 2025 staff review of a proposed 4-story mixed-use building, with preliminary Public Works comments on solid waste service and a required solid waste narrative.

    May 20, 2025 · 7 pages · 511 KB · PDS-Interdepartmental Review Summary Report

    Download Interdepartmental review summary report

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.