Skip to content

Assured water supply · Planning application

Outdoor storage site under review for water supply approval

The city is reviewing an assured water supply application for an outdoor storage use on vacant land zoned for industrial use. It was filed Oct. 5, 2026, with a water demand estimate and site plan.

In reviewAWS26-00050Filed Oct. 5, 2026South Cole · 5975 S Visionary Ave+2 related filings
Site plan for Outdoor storage site under review for water supply approval
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Outdoor Storage

Project name on file: 5975 S VISIONARY AVE

Timeline

  1. Oct. 7, 2026

    Prescreen Review: Prescreen Approved

  2. Oct. 6, 2026

    Prescreen Review: Corrections Required

    Please include the zoning district on the site location map (Exhibit B-1).Please upload the entire demand estimate worksheet as a PDF (Exhibit C-3).

  3. Oct. 5, 2026

    Application Submittal: In Office

  4. Oct. 5, 2026

    Application filed

Documents

Site plans

  • One-page site map exhibit (Exhibit B-1) showing zoning district labels for the Assured Water Supply application; the text is partly garbled, so details are limited.

    Oct. 7, 2026 · 1 page · 903 KB · PDS-Other Small Docs

    Download Site map
  • One-page exhibit labeled B-1 showing a site map with zoning, part of the Assured Water Supply application.

    Oct. 5, 2026 · 1 page · 902 KB · PDS-Other Small Docs

    Download Site map with zoning
  • Site plan sheet A010 for a gravel lay-down yard, listing general construction notes and sheet notes for fencing, gate, landscaping, sidewalk and curb work, marked Addendum 02.

    Oct. 5, 2026 · 1 page · 775 KB · PDS-Other Small Docs

    Download Architectural site plan with general and sheet notes

Application

  • Section C form for planned water service from Veolia, with buildout demand estimates for annual, average, winter and maximum day use.

    Oct. 7, 2026 · 10 pages · 286 KB · PDS-Other Small Docs

    Download Assured Water Supply application, Section C water supply information
  • Application form for an assured water supply review covering an outdoor storage project on a property zoned I-1, with the applicant and two owners listed.

    Oct. 5, 2026 · 2 pages · 152 KB · PDS-Application

    Download Assured water supply application
  • Application B for an assured water supply certification within a city water provider's service area, with applicant information in Section A.

    Oct. 5, 2026 · 10 pages · 236 KB · PDS-Other Small Docs

    Download Assured water supply application B

Studies and reports

  • Exhibit C-3 spreadsheet estimating average and maximum daily water demand at buildout for one commercial/industrial customer, for the Assured Water Supply application.

    Oct. 7, 2026 · 4 pages · 158 KB · PDS-Other Small Docs

    Download Water demand calculator worksheet (commercial/industrial)
  • Exhibit C-3 gives projected water demand at buildout: 100,000 gallons per year, 408 gallons per day average and maximum day, and 0 gallons per day in winter.

    Oct. 5, 2026 · 1 page · 205 KB · PDS-Other Small Docs

    Download Water demand estimate worksheet

Correspondence

  • Veolia states the project is serviceable under its current tariffs, notes owner-funded main extensions may be required, and says the letter expires after twelve months.

    Oct. 5, 2026 · 1 page · 143 KB · PDS-Other Small Docs

    Download Veolia will-serve letter

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.