Skip to content

Historic preservation · Planning application

Solar panels approved for historic North End home with conditions to keep them out of view

The city's historic preservation staff approved a 6.09-kilowatt rooftop solar system with 14 black panels and a battery, Dec. 12, with conditions that panels sit flush with the roof, be non-reflective and that equipment stay hidden from the public right of way.

ApprovedDRH25-00407Filed Nov. 16, 2025North End · 703 W Union St+1 related filing
Site plan for Solar panels approved for historic North End home with conditions to keep them out of view
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

The applicant proposes to install solar panels on the less visible sides of a historic house at 703 W Union St in Boise. The city's historic preservation staff approved the work with conditions meant to keep the panels out of view from the street.

Solar panel installation on home in the North End historic district.

Project name on file: 703 W UNION ST

Timeline

  1. Dec. 23, 2025

    Appeal Period: Completed

  2. Dec. 12, 2025

    Review Complete: Completed

  3. Dec. 12, 2025

    DR: Complete

  4. Dec. 3, 2025

    DR: In Review

  5. Dec. 3, 2025

    Assign Reviewers: Completed

  6. Nov. 19, 2025

    Fee Payment: Payment Received

  7. Nov. 19, 2025

    Prescreen Review: Passed

  8. Nov. 16, 2025

    Prescreen Review: In Progress

  9. Nov. 16, 2025

    Application Submittal: ePlanReview

  10. Nov. 16, 2025

    Application filed

Documents

Site plans

  • Site layout drawing showing the placement of the Tesla power wall, rapid shutdown button, gateway, solar disconnect, sub panel and meter main.

    Dec. 4, 2025 · 1 page · 219 KB · PDS-Maps and Drawings

    Download Site layout plan

Project narrative

  • Installer letter describing a 6.09 kW rooftop solar PV system with 14 black modules and a battery backup, with equipment placed out of public view.

    Dec. 4, 2025 · 1 page · 90 KB · PDS-Letter of Intent

    Download Letter of explanation for rooftop solar installation

Decisions

  • Approves solar panels on the secondary elevations of a contributing historic structure, with conditions on flush mounting, non-reflective panels, hidden equipment, and reversible installation.

    Dec. 12, 2025 · 4 pages · 242 KB · PDS-Action Letter

    Download Certificate of Appropriateness action letter

Notices

  • City notice that staff approved a Certificate of Appropriateness to install solar on secondary elevations of a contributing primary structure in a historic design overlay zone; appeals due Dec. 22, 2025.

    Dec. 10, 2025 · 2 pages · 746 KB · PDS-Legal Notice

    Download Notice of approval, Certificate of Appropriateness for solar installation

Application

Other documents

  • Noticing radius map

    Dec. 10, 2025 · 549 KB · PDS-Maps and Drawings

  • Transmittal sheet

    Dec. 5, 2025 · 100 KB · PDS-Transmittal Agencies

  • Manufacturer datasheet for a 400-430W backsheet monocrystalline solar module, covering power output, efficiency, warranty, certifications, dimensions and I-V/P-V curves.

    Dec. 4, 2025 · 2 pages · 2.5 MB · PDS-Other Small Docs

    Download Solar module product specification sheet
  • Statement of legal interest

    Dec. 4, 2025 · 319 KB · PDS-Statement of Legal Interest

  • Receipt

    Nov. 19, 2025 · 135 KB · PDS-Receipts

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.