Skip to content

Planning project · Planning application

Solar panel installation on historic-district home approved

City staff approved the plan to put solar panels on a home in a historic district on Dec. 12. The review was administrative, so no public hearing was needed. The lot is about 0.21 acres.

ApprovedPLN25-00969Filed Nov. 4, 2025North End · 703 W Union St+1 related filing
Site plan for Solar panel installation on historic-district home approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

Solar panel installation on home in the North End historic district.

Project name on file: 703 W UNION ST

Timeline

  1. Dec. 12, 2025

    Planning Applications: Project Entitled

  2. Nov. 16, 2025

    Pending Application Submittal: Planning Applications in Review

  3. Nov. 14, 2025

    Concept Review Complete: CR Complete - Type 2

  4. Nov. 4, 2025

    Application Submittal: Online

  5. Nov. 4, 2025

    Application filed

Documents

Site plans

  • Planner's advisory notes on a Certificate of Appropriateness - Minor for solar panels on a historic home, asking that panels not be visible from the street and citing design guidelines.

    Nov. 14, 2025 · 1 page · 453 KB · PDS-Concept Review Summary Report

    Download Concept review summary for rooftop solar panels
  • Letter from the solar installer describing a 6.09 kW rooftop PV system with 14 black modules, a battery backup, and equipment placed out of public view.

    Nov. 4, 2025 · 1 page · 89 KB · PDS-Other Small Docs

    Download Detailed letter of explanation for rooftop solar system
  • One-page site layout showing equipment placement, including a Tesla powerwall, rapid shutdown button, solar disconnect, sub panel and meter main.

    Nov. 4, 2025 · 1 page · 216 KB · PDS-Other Small Docs

    Download Proposed site layout

Application

  • Application for installing a photovoltaic system for personal power production on an R-2 zoned residential property, filed by a solar company on the owner's behalf.

    Nov. 4, 2025 · 2 pages · 158 KB · PDS-Application

    Download Planning project application form

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.