Skip to content

Record of survey · Planning application

Lot line adjustment between two Boise lots approved with conditions

The city approved a property line adjustment moving the shared boundary between two existing lots, with no new homes or buildings described. The approval takes effect only after the appeal period ends Jan. 5 without an appeal, and the revised survey must be signed and recorded.

ClosedROS25-00074Filed Oct. 16, 2025East End · 724 N Santa Paula Pl+3 related filings
Site plan for Lot line adjustment between two Boise lots approved with conditions
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

A property line adjustment between Lots 3 and 4 of the Aldape Heights Extension Subdivision at 724 N Santa Paula Place in Boise. The change moves the shared boundary between the two existing lots, and no new buildings or housing units are described.

ROS - Property Line Adjustment

Project name on file: 724 N SANTA PAULA PL - ROS

Timeline

  1. June 6, 2026

    Appeal Period: Completed

  2. June 5, 2026

    Finalize Record of Survey: Recorded

  3. June 5, 2026

    Site Inspection: Not Required

  4. Jan. 5, 2026

    Review Complete: Completed

  5. Dec. 26, 2025

    Review Complete: Completed

  6. Dec. 26, 2025

    Current Planning: Complete

  7. Dec. 23, 2025

    Building Plan Reviewer: Complete

  8. Dec. 16, 2025

    Building Plan Reviewer: In Review

  9. Dec. 16, 2025

    Current Planning: In Review

  10. Dec. 16, 2025

    Assign Reviewers: Completed

  11. Dec. 11, 2025

    Review Complete: Corrections Required

  12. Dec. 11, 2025

    Current Planning: Corrections Required

  13. Nov. 25, 2025

    Building Plan Reviewer: Complete

  14. Nov. 25, 2025

    Building Plan Reviewer: In Review

  15. Nov. 25, 2025

    Current Planning: In Review

  16. Nov. 25, 2025

    Assign Reviewers: Completed

  17. Nov. 19, 2025

    Fee Payment: Payment Received

  18. Nov. 19, 2025

    Prescreen Review: Passed

  19. Nov. 19, 2025

    Prescreen Review: In Progress

  20. Nov. 14, 2025

    Prescreen Review: Corrections Required

  21. Nov. 12, 2025

    Prescreen Review: In Progress

  22. Nov. 10, 2025

    Prescreen Review: Corrections Required

  23. Nov. 7, 2025

    Prescreen Review: In Progress

  24. Oct. 29, 2025

    Application Submittal: ePlanReview

    Updated missing fields in Project Details with input from Christy Webster in order to generate the ePlan case.

  25. Oct. 16, 2025

    Application filed

Documents

Site plans

  • Revised record of survey sheet for the application, with boundary and lot information; the text is mostly garbled or rotated, so details are unclear.

    March 30, 2026 · 1 page · 502 KB · PDS-Record of Survey

    Download Revised record of survey
  • Survey map showing a boundary adjustment of two lots into Parcels A and B, with owner certificates, planning director signature block, and notary acknowledgments.

    Dec. 2, 2025 · 1 page · 470 KB · PDS-Record of Survey

    Download Record of survey for property boundary adjustment

Plans

  • Structural notes and retaining wall design drawings for the McFarlane retaining wall, including design loads, wind and seismic criteria, material properties and rebar specifications.

    Dec. 2, 2025 · 4 pages · 8.5 MB · PDS-Maps and Drawings

    Download Retaining wall drawings

Project narrative

  • Property owners notify the city they are taking over permitting for a lot line adjustment and retaining wall project from the prior contractor and list new contacts.

    March 30, 2026 · 1 page · 33 KB · PDS-Letter of Intent

    Download Revised letter of intent
  • Letter from Webster Construction explaining that a record of survey will realign the property line so a failing retaining wall sits on the correct property before replacement.

    Dec. 2, 2025 · 1 page · 24 KB · PDS-Letter of Intent

    Download Letter of intent for lot line adjustment

Decisions

Notices

  • City of Boise notice that staff found the record of survey for a property line adjustment between two lots consistent with the zoning ordinance and approved it; appeals are due by Jan. 5, 2026.

    Dec. 22, 2025 · 2 pages · 779 KB · PDS-Legal Notice

    Download Notice of approval for record of survey

Application

  • A Public Works questionnaire with yes/no answers on parcel changes, grading, driveways and retaining walls for a hillside project, dated 11/19/2025.

    Dec. 2, 2025 · 1 page · 676 KB · PDS-Other Small Docs

    Download Public Works hillside project questionnaire
  • Application for a record of survey documenting a property line adjustment, with two lots before and after, sewer and water connections present, and a Hillside and WUI designation.

    Nov. 19, 2025 · 2 pages · 203 KB · PDS-Application

    Download Record of survey application for property line adjustment

Studies and reports

  • Engineering calculations for the McFarlane retaining wall, covering design criteria (2018 IBC, seismic, wind, snow), soil pressures and a cantilevered retaining wall analysis.

    Dec. 2, 2025 · 30 pages · 5.3 MB · PDS-Other Small Docs

    Download Retaining wall structural calculations
  • Geotechnical evaluation with two hand-auger subsurface borings to 10 feet, plus earthwork, bearing capacity, retaining wall and drainage recommendations for the properties.

    Dec. 2, 2025 · 21 pages · 1.2 MB · PDS-Other Small Docs

    Download Geotechnical engineering report

Photos

  • Six photographs of the site, dated Nov. 19, 2025, filed with the record of survey application.

    Dec. 2, 2025 · 6 pages · 41.3 MB · PDS-Photos

    Download Site photos

Correspondence

  • Boise Fire Department approves the parcel line adjustment as presented, with wildland-urban interface, defensible space and hydrant/access conditions for future changes.

    Dec. 26, 2025 · 2 pages · 233 KB · PDS-Agency Comments

    Download Fire Department comments
  • Boise Parks and Recreation reviewed the application with Community Forestry and has no comments or recommendations.

    Dec. 26, 2025 · 1 page · 57 KB · PDS-Agency Comments

    Download Parks and Recreation Department comments
  • Addressing technician's review confirming both parcels keep their existing addresses, and asking to be notified once the survey is finalized.

    Dec. 26, 2025 · 1 page · 66 KB · PDS-Agency Comments

    Download Addressing plan review comments
  • Plan review found no comments on the final record of survey, but notes that a retaining wall will need a separate building permit.

    Dec. 26, 2025 · 1 page · 106 KB · PDS-Agency Comments

    Download Building plan review comments
  • Public Works reviewed the record of survey and returned no objections or comments on the sewer and irrigation review.

    Dec. 26, 2025 · 1 page · 10 KB · PDS-Agency Comments

    Download Public Works sewer comments
  • Plan review found no comments on the final record of survey, but notes that a retaining wall will need a separate building permit.

    Dec. 2, 2025 · 1 page · 106 KB · PDS-Agency Comments

    Download Building plan review comments

Other documents

  • Assessor's land records parcel activity form assigning new parcel numbers after a quitclaim deed transfer, listing affected parcels in the Aldape Heights Extension land group.

    June 5, 2026 · 2 pages · 748 KB · PDS-Other Small Docs

    Download Ada County Assessor new parcel numbers form
  • Recorded notice creating a new buildable parcel (Parcel B) by property line adjustment, with legal descriptions of the original and new parcels; valid only once the city planning director's certificate is signed.

    June 5, 2026 · 8 pages · 1.7 MB · PDS-Other Small Docs

    Download Notice of buildable parcel for property line adjustment
  • Recorded survey plat adjusting the property lines of two lots in Aldape Heights Extension, with owner certificates, notes on zoning, and surveyor certification.

    June 5, 2026 · 1 page · 674 KB · PDS-Record of Survey

    Download Record of survey for a property line adjustment
  • Draft notice describing the legal descriptions of the original and new buildable parcels for a property line adjustment, with a planning director certificate still unsigned.

    March 30, 2026 · 4 pages · 328 KB · PDS-Other Small Docs

    Download Notice of buildable parcel for property line adjustment
  • Revised notice describing Parcel B, a buildable parcel created by a property line adjustment between Lot 3 and Lot 4 of Aldape Heights Extension, with a Boise City signature certificate required.

    March 30, 2026 · 4 pages · 781 KB · PDS-Other Small Docs

    Download Notice of buildable parcel for property line adjustment, revised
  • Statement of legal interest from neighbor

    March 30, 2026 · 73 KB · PDS-Statement of Legal Interest

  • Noticing radius map

    Dec. 22, 2025 · 544 KB · PDS-Maps and Drawings

  • Transmittal to agencies

    Dec. 3, 2025 · 99 KB · PDS-Transmittal Agencies

  • Metes-and-bounds legal description of Parcel A, combining all of Lot 4 and part of Lot 3 of a recorded subdivision, prepared by Mason & Associates for Webster Construction, dated August 27, 2025.

    Dec. 2, 2025 · 4 pages · 155 KB · PDS-Other Small Docs

    Download Parcel A legal description
  • Statement of legal interest

    Dec. 2, 2025 · 658 KB · PDS-Statement of Legal Interest

  • Payment receipt

    Nov. 19, 2025 · 134 KB · PDS-Receipts

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.