Skip to content

Design review · Planning application

Approved: 0.25-mile pathway along Tuttle Lateral to link Spaulding Ranch and Capitol High

The city approved plans for a 10-foot-wide concrete multi-use pathway about a quarter mile long, which includes piping an open irrigation ditch. The project was approved Dec. 30, 2025, with conditions on construction hours and outdoor lighting.

ApprovedDRH25-00283Filed Dec. 3, 2025West Bench · 8055 W Goddard Rd+3 related filings
Site plan for Approved: 0.25-mile pathway along Tuttle Lateral to link Spaulding Ranch and Capitol High
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

This document is an internal city email thread about a design review application at 8055 W Goddard Rd in Boise. City staff discuss that the project qualifies for an exception from a grading and drainage permit, so earlier Public Works drainage comments can be removed from the record. It does not describe the size or scope of the project itself.

Tuttle Lateral Pathway

Project name on file: 8055 W GODDARD RD

Timeline

  1. Dec. 31, 2025

    Appeal Period: Completed

  2. Dec. 29, 2025

    Review Complete: Completed

  3. Dec. 29, 2025

    DR: Complete

  4. Dec. 18, 2025

    DR: In Review

  5. Dec. 18, 2025

    Assign Reviewers: Completed

  6. Dec. 5, 2025

    Fee Payment: Payment Received

  7. Dec. 4, 2025

    Prescreen Review: Passed

  8. Dec. 4, 2025

    Prescreen Review: In Progress

  9. Dec. 3, 2025

    Application Submittal: ePlanReview

  10. Dec. 3, 2025

    Application filed

Documents

Site plans

  • Site plan sheet showing a legend, typical cross-sections of paved paths and lanes with conduit and irrigation notes, and station ranges for the design review application.

    Dec. 23, 2025 · 5 pages · 7.6 MB · PDS-Maps and Drawings

    Download Site plan with typical road and path sections

Plans

  • Landscape sheet for baseball outfield restoration near Capital High School, with general notes on sod, irrigation, tree protection and bio-barrier limits.

    Dec. 23, 2025 · 1 page · 3.1 MB · PDS-Maps and Drawings

    Download Landscape plan, Milwaukee Park baseball outfield

Project narrative

Decisions

  • Revised irrigation sheet with plan notes, keynotes, and structure table responding to irrigation comments, dated Jan. 21, 2026.

    Jan. 22, 2026 · 5 pages · 1.5 MB · PDS-Action Letter

    Download Revised irrigation plan response
  • Staff approval letter for a quarter-mile multi-use pathway, listing appeal deadlines, a building permit requirement, and site-specific conditions of approval.

    Dec. 31, 2025 · 11 pages · 250 KB · PDS-Action Letter

    Download Administrative action letter approving design review
  • Public Works email confirming that drainage conditions of approval are satisfied because the project qualifies for a grading and drainage permit exception, and that the comment letter can be removed.

    Dec. 31, 2025 · 2 pages · 161 KB · PDS-Correspondence

    Download Public Works drainage conditions met, exception confirmed

Notices

  • City of Boise notice that staff found the Design Review project follows the zoning ordinance and was approved, with an appeal deadline of January 9, 2026.

    Dec. 24, 2025 · 2 pages · 776 KB · PDS-Legal Notice

    Download Notice of approval for multipath construction

Application

  • Design review application for a Tuttle Lateral Pathway project on a historic-district property owned by the Boise Independent School District, filed by the City of Boise.

    Dec. 3, 2025 · 5 pages · 226 KB · PDS-Application

    Download Design review application for Tuttle Lateral Pathway

Correspondence

Other documents

  • Transmittal sheet

    Dec. 26, 2025 · 101 KB · PDS-Transmittal Agencies

  • Noticing radius map

    Dec. 24, 2025 · 727 KB · PDS-Maps and Drawings

  • Recorded easement agreement granting the City of Boise public access and maintenance rights over a portion of a private lot for a multi-use pathway.

    Dec. 23, 2025 · 6 pages · 1.9 MB · PDS-Other Small Docs

    Download Multi-use pathway easement agreement
  • Agreement granting the City a limited license to access a property owned by an individual to build fence, irrigation box and conduit improvements tied to a multi-use pathway easement.

    Dec. 23, 2025 · 6 pages · 291 KB · PDS-Other Small Docs

    Download Temporary access and construction license agreement
  • Statement of legal interest

    Dec. 23, 2025 · 34 KB · PDS-Statement of Legal Interest

  • Statement of legal interest

    Dec. 23, 2025 · 305 KB · PDS-Statement of Legal Interest

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.