Skip to content

Planning project · Planning application

Accessory dwelling unit with two-car garage proposed in historic district

The plan adds one accessory dwelling to a lot with an existing house, plus a side-loaded garage reached from the alley. It needs historic design approval and a variance to put vehicle backup space in the side setback.

In reviewPLN26-00702Filed July 24, 2026North End · 809 N 18th St+1 related filing
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Boise's record. See the official record

ADU

Project name on file: 809 N 18TH ST - ADU

Timeline

  1. Oct. 13, 2026

    4 documents added

  2. Oct. 13, 2026

    Status changed from Submitted to In review

    Reported as “Neighborhood Meeting Review”.

  3. Aug. 12, 2026

    Concept Review Complete: CR Complete - Type 3

  4. July 24, 2026

    Application Submittal: Online

  5. July 24, 2026

    Application filed

Documents

Project narrative

  • Advisory concept review summary covering an ADU and side-loaded two-car garage, alley access and backup space rules, and required Historic Certificate of Appropriateness and variance.

    Aug. 12, 2026 · 2 pages · 460 KB · PDS-Concept Review Summary Report

    Download Concept review summary report

Application

Correspondence

  • Applicant's letter explaining the proposed replacement garage with an upstairs guest unit (ADU), its placement, footprint and size, and why the garage was demolished.

    July 24, 2026 · 1 page · 260 KB · PDS-Other Small Docs

    Download Letter of explanation for garage and accessory dwelling unit

Other documents

  • Cover page, site plan, project data, zoning and code evaluation, floor plans, elevations

    Combined set of cover sheet, site plan, property and project data, zoning and building code evaluation, floor plans, and elevations for the application.

    July 24, 2026 · 3.8 MB · PDS-Other Small Docs

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.