Subdivision · Planning application
Council approves six-home subdivision that keeps its office lot
The Boise City Council approved the final plat on Dec. 9 with conditions, including a 35-foot height limit, a six-foot solid fence on the west and north property lines, and shared driveway access for lots 3 through 8. The existing office building stays on its own lot.

From the filing
The application's description as it appears in City of Boise's record. See the official record
The Boise City Council approved the final plat for the Broun Terrace Subdivision at 5402 W Overland Road on December 9, 2025, with conditions. The plat covers residential homes on a hillside-overlay site served by a shared driveway, and it keeps the existing office building on the property.
Final plat for Broun Terrace Subdivision
Project name on file: Broun Terrace Subdivision
Timeline
Dec. 23, 2025
Appeal Period: Completed
Dec. 23, 2025
Review Complete: Completed
Dec. 19, 2025
Current Planning: Complete
Dec. 9, 2025
Public hearing
Outcome: Approved.
Dec. 9, 2025
Decision: Approved
Hearing marked “Approved” on 2025-12-09.
Dec. 9, 2025
Hearing: Approved
Dec. 3, 2025
Review Complete: Completed
Dec. 3, 2025
Current Planning: Complete
Oct. 8, 2025
Current Planning: In Review
Oct. 8, 2025
Assign Reviewers: Completed
Oct. 1, 2025
Fee Payment: Payment Received
Sept. 23, 2025
Prescreen Review: Passed
Sept. 23, 2025
Prescreen Review: In Progress
Sept. 23, 2025
Application Submittal: ePlanReview
Sept. 23, 2025
Application filed
Documents
Site plans
- Download Preliminary plat with lot notes and utility notes
Subdivision plat sheet showing lot layout, with notes on sewer, water, fire service, irrigation, storm water disposal, utilities, zoning and geotechnical report.
Oct. 16, 2025 · 1 page · 469 KB · PDS-Maps and Drawings
Plans
- Download Final plat, Broun Terrace Subdivision
Final plat sheet 1 of 3 for the Broun Terrace Subdivision, showing lot boundaries, dedicated strips, easements and survey references.
Oct. 16, 2025 · 2 pages · 476 KB · PDS-Maps and Drawings
- Download Final plat signature page
Signature block for the subdivision final plat, with surveyor, health, highway district, city, county surveyor and treasurer certificates, all blank.
Oct. 16, 2025 · 1 page · 128 KB · PDS-Maps and Drawings
- Download Landscape plan with planting and fence details
Landscape plan sheet showing existing cottonwoods and vegetation to remain, a shrub planting detail with planting-hole and mulch notes, and a perimeter fence detail.
Oct. 16, 2025 · 2 pages · 733 KB · PDS-Maps and Drawings
Project narrative
- Download Letter of intent for final plat
Letter from the engineer on behalf of the owners describing the six-lot clustered subdivision design, the related city approvals, and the conditions of approval for the final plat.
Oct. 16, 2025 · 1 page · 34 KB · PDS-Letter of Intent
Staff reports
- Download Staff report for the Dec. 9 City Council final plat hearing
Planning staff report recommending approval of the final plat for a seven-buildable-lot mixed-use subdivision, with conditions of approval and agency comments.
Dec. 3, 2025 · 36 pages · 3.2 MB · PDS-Project Report/Memo
Decisions
- Download Council action letter approving final plat
Letter from Boise Planning and Development Services notifying the applicant that City Council approved the Broun Terrace Subdivision final plat on December 9, 2025, subject to conditions of approval.
Dec. 12, 2025 · 14 pages · 248 KB · PDS-Action Letter
Application
- Download Assured Water Supply application B
Part II application for assured water supply certification for a development served by the city's water provider, with applicant information completed by an engineering representative.
Oct. 16, 2025 · 15 pages · 2.7 MB · PDS-Other Small Docs
- Download Public Works hillside project questionnaire
Public Works questionnaire answering whether the project involves a new parcel boundary, new dwelling, new access drive, grading over 12 inches, and retaining walls.
Oct. 16, 2025 · 1 page · 683 KB · PDS-Other Small Docs
- Download Subdivision application, final plat
Application for the final plat of Broun Terrace Subdivision, proposing 7 buildable residential lots and 2 common lots, filed by the applicant for the property owner.
Sept. 23, 2025 · 3 pages · 199 KB · PDS-Application
Correspondence
- Download Request to add contact email to subdivision applications
Applicant asks planner Cameron Lennon to add a contact email address to two subdivision application records, dated April 20, 2026.
April 20, 2026 · 1 page · 287 KB · PDS-Correspondence
- Download Central District Health review sheet
Central District Health transmittal with checkboxes on sewage, water, and plan review requirements for a subdivision proposal, signed and dated March 22.
Dec. 2, 2025 · 1 page · 963 KB · PDS-Agency Comments
- Download Parks and Recreation Department comments
Boise Parks and Recreation review finds two existing trees on proposed Lot 1 will be retained, no street trees are possible due to a gas line, and recommends a new tree per home site.
Dec. 2, 2025 · 1 page · 61 KB · PDS-Agency Comments
- Download Public Works solid waste comments
Solid waste staff say the application lacks solid waste information, so the site cannot be verified as serviceable and fails the Solid Waste Design Standards; trash enclosure requirements are linked.
Dec. 2, 2025 · 1 page · 88 KB · PDS-Agency Comments
- Download Public Works street light comments
Public Works Street Light Trades memo setting conditions for street light easements, installation, bonding, fees, and Idaho Power metered service on the subdivision.
Dec. 2, 2025 · 2 pages · 166 KB · PDS-Agency Comments
- Download Notification of the Dec. 9 City Council hearing
Letter to the applicant scheduling the final plat for the Dec. 9, 2025 Boise City Council hearing, with notes on attending virtually and where agency comments and the project report will appear.
Nov. 25, 2025 · 1 page · 109 KB · PDS-Correspondence
- Download Fire Department comments on final plat
Boise Fire Department memo dated Nov. 3, 2025 listing code requirements for hydrant placement, aerial access, turnarounds, and addressing signage for a seven-lot hillside subdivision.
Nov. 20, 2025 · 2 pages · 199 KB · PDS-Agency Comments
- Download Public Works sewer and irrigation comments
City of Boise Public Works memo listing standard pressure irrigation and sewer conditions that must be met before final plat signing on this subdivision.
Nov. 20, 2025 · 3 pages · 80 KB · PDS-Agency Comments
- Download Public Works hillside review comments
City Public Works engineering review of the Broun Terrace subdivision finds the land capable of the proposed grading and drainage, subject to the listed report recommendations and hillside standards.
Oct. 23, 2025 · 8 pages · 254 KB · PDS-Agency Comments
- Download Public Works hillside and drainage comments
Public Works conditions of approval covering hillside development, subdivision grading and drainage, and a required stormwater management plan.
Oct. 6, 2025 · 1 page · 141 KB · PDS-Agency Comments
Other documents
- Transmittal sheet
Oct. 27, 2025 · 97 KB · PDS-Transmittal Agencies
- Statement of legal interest
Oct. 16, 2025 · 21 KB · PDS-Statement of Legal Interest


