Eagle approves 46 townhomes in 23 one-story buildings

The Eagle City Council approved the design on consent after the builder revised the townhome exteriors to better match neighborhood scale. Staff must review revised elevations before a zoning certificate is issued.

ApprovedDR-2025-80Filed Sept. 23, 2025Eagle
Pin at the reported location.

From the filing

The application's description as it appears in City of Eagle's record. See the official record

SH ACQ2020, LLC proposes 23 townhome buildings with 46 units within Valnova Subdivision No. 1, on the east side of West Glencara Court north of West Silverberry Drive in Eagle. The site is about 13.36 acres. The City Council earlier sent the design back so the applicant could revise the building looks, and revised renderings were submitted in April 2026.

SH ACQ2020, LLC, represented by Nicolette Womack with Kimley-Horn, is requesting design review approval for 23 townhome buildings (46-units). The 13.36-acre site is generally located on the east side of West Glencara Court north of West Silverberry Drive within Valnova Subdivision No. 1 (Lots 52-75, Block 1, Lots 1-10, Block 2, Lots 14-17, Block 3, and Lots 2-9, Block 4). (ERF)

Project name on file: 23 Townhome Buildings (46-units) within Valnova Subdivision No. 1

Timeline

  1. April 14, 2026

    Approved

    Eagle City Council: Approved on its consent agenda.

  2. Sept. 23, 2025

    Application filed

Documents

Staff reports

  • Staff memo to City Council transmitting revised townhome elevations and adding condition of approval 8 to the design review findings for 23 townhome buildings.

    April 13, 2026 · 30 pages · 25.7 MB · Staff Report

    Download City Council memo on townhome design review remand
  • City of Eagle staff report and recommendation on design review for 46 townhome units, with site-specific and standard conditions of approval for City Council.

    Jan. 26, 2026 · 247 pages · 190.7 MB

    Download Design review staff report for 23 townhome buildings

Decisions

  • Design review board's written findings and conclusions approving or addressing design review for 23 townhome buildings (46 units) in a subdivision, with project history and procedural background.

    Jan. 7, 2026 · 26 pages · 899 KB · Decision

    Download Findings of fact and conclusions of law