Conditional use · Planning application
Meridian approves 52,000-square-foot church built in two phases
The Poiema Calvary Chapel project will include 320 parking spaces at full build-out on about 7 acres. The city approved the permit on Jan. 7, 2021, and the approval is now final.
From the filing
The application's description as it appears in City of Meridian's record. See the official record
Conditional Use Permit request to construct a new church facility built in two phases to total 52,000 square feet at total build-out and 320 parking spaces on Lot 1, Block 2, approximately 7 acres, of Poiema Subdivision, zoned R-15.
Project name on file: Poiema Calvary Chapel
Timeline
Jan. 8, 2021
Application Complete: Done
Jan. 8, 2021
Final Action: Application Complete
Findings signed on 1-7
Jan. 7, 2021
Public hearing: Meridian Planning and Zoning Commission
Outcome: Approved.
Jan. 7, 2021
Decision: Approved
Meridian Planning and Zoning Commission: Approved.
Dec. 18, 2020
Application Complete: Done
Dec. 18, 2020
Planning and Zoning Hearing: Approved
Dec. 17, 2020
Public hearing: Meridian Planning and Zoning Commission
Nov. 20, 2020
Application Complete: Done
Nov. 20, 2020
Planning and Zoning Hearing: Continued
Nov. 19, 2020
Public hearing: Meridian Planning and Zoning Commission
Nov. 16, 2020
Application Complete: Done
Nov. 16, 2020
Community Development Review: Staff Recommend Approval w/ Cond
Oct. 30, 2020
Application Complete: Done
Oct. 30, 2020
Parks Review: Review Complete
No Pathways MP Interface -- Ten Mile Pathway is located on opposite side of Creek from church.
Oct. 26, 2020
Application Complete: Done
Oct. 26, 2020
Floodplain Review: FLDP Required
Required Hydraulic and Hydrologic study complete. Study indicates large portion of site is in the 1% floodplain. Culvert needs to be replaced as designed to remove area from floodplain. Floodplain Development Permit required. Requirements dependent on if culvert is replaced as designed.
Oct. 23, 2020
Application Complete: Done
Oct. 23, 2020
MFD Plan Review: Review Complete w/ Cond
Oct. 12, 2020
Application Complete: Done
Oct. 12, 2020
Water Modeling Review: Review Complete
See Engineering-Water Staff Report Comments
Oct. 9, 2020
Application Complete: Done
Oct. 9, 2020
Wastewater Modeling Review: Review Complete
See Engineering-WW Staff Report Comments
Oct. 9, 2020
Transportation Plan Review: Review Complete w/ Cond
A street light plan will need to be included in the final plat and/or building permit application. Street light plan requirements are listed in section 6-7 of the City's Design Standards. A future installation agreement for streetlight will be required for the streetlights on E. Lake Hazel Road due to an upcoming ACHD project
Oct. 8, 2020
Application Complete: Done
Oct. 8, 2020
MPD Review: No Comment
Oct. 8, 2020
GIS Review: Review Complete
Oct. 7, 2020
Application Complete: Done
Oct. 7, 2020
Reclaimed Water Review: Connection NOT required
Oct. 7, 2020
Floodplain Review: Manual Review Required
Oct. 7, 2020
Transmit and Notice: Distribute for Plan Review
Oct. 7, 2020
Legal Description Review: Verified Legal Description
Oct. 7, 2020
Planning Cursory Review: Return to Plan Intake
Oct. 7, 2020
GIS Cursory Review: No Comment
Oct. 7, 2020
Plan Intake: Cursory Review
Oct. 7, 2020
Plan Intake: Accepted
Sept. 24, 2020
Application Complete: Done
Sept. 24, 2020
Plan Intake: Application Submitted
Sept. 24, 2020
Application filed
Documents
Site plans
- Conditional use permit application package
Sept. 24, 2020 · 67.2 MB · Site Plans or Other Information
Staff reports
- Engineering water staff report comments
Oct. 12, 2020 · 18 KB · Viewable by All
- Engineering staff report comments
Oct. 9, 2020 · 13 KB · Viewable by All
Application
- Application materials
Oct. 7, 2020 · 30.8 MB · Viewable by All
Correspondence
- Email confirmation of final action courtesy letter
Jan. 28, 2021 · 1.0 MB · Viewable by All