Meridian approves annexation of 43 single-family homes on 14.9 acres

The city annexed the 14.87-acre site with R-15 zoning and approved a preliminary plat for 44 buildable lots and 4 common lots, allowing single-family detached and attached homes. The decision was made at a hearing on Oct. 13, 2020.

ApprovedH-2020-0035Filed March 16, 2020Southeast Meridian · 3727 Lake Hazel+13 related filings
Pin at the reported location; the shaded outline is the primary parcel (Ada County).

From the filing

The application's description as it appears in City of Meridian's record. See the official record

AZ of 14.87 acres with R-15 zoning; PP of 44 buildable lots and 4 common lots on 14.87 acres

Project name on file: Poiema Subdivision

Timeline

  1. Oct. 19, 2020

    GIS Final Review: Entered In GIS

  2. Oct. 13, 2020

    Public hearing: Meridian City Council

    Outcome: D A Approved.

  3. Oct. 13, 2020

    Decision: D A Approved

    Meridian City Council: D A Approved.

  4. Aug. 26, 2020

    Final Action: Application Complete

    Findings signed 8-25

  5. Aug. 25, 2020

    Public hearing: Meridian City Council

    Outcome: FF-CL Approved.

  6. Aug. 25, 2020

    Decision: FF-CL Approved

    Meridian City Council: FF-CL Approved.

  7. Aug. 21, 2020

    City Council Hearing: Approved

  8. Aug. 11, 2020

    Public hearing: Meridian City Council

  9. June 19, 2020

    Planning and Zoning Hearing: Recommend Approval

  10. June 18, 2020

    Public hearing: Meridian Planning and Zoning Commission

    Outcome: Recommended Approval.

  11. June 18, 2020

    Recommended Approval

    Meridian Planning and Zoning Commission: Recommended Approval.

  12. June 15, 2020

    Community Development Review: Staff Recommend Approval w/ Cond

  13. May 28, 2020

    Parks Review: Review Complete

    no pathways mp interface

  14. May 15, 2020

    Transportation Plan Review: Review Complete w/ Cond

    A street light plan will need to be included in the final plat application. Street light plan requirements are listed in section 6-7 of the City's Design Standards.

  15. May 14, 2020

    MPD Review: Review Complete

    See attached police comments

  16. May 13, 2020

    Floodplain Review: FLDP Required

    FLDP Required. Currently A zone. Study submitted requires culvert on Lake Hazel to be replaced and LOMR completed to change maps.

  17. May 12, 2020

    GIS Review: Review Complete

  18. May 12, 2020

    MFD Plan Review: Review Complete w/ Cond

    Comments emailed to the clerk and uploaded to Accela.

  19. May 11, 2020

    Reclaimed Water Review: Connection NOT required

  20. May 11, 2020

    Floodplain Review: Manual Review Required

  21. May 11, 2020

    Transmit and Notice: Distribute for Plan Review

  22. May 7, 2020

    Plan Intake: Accepted

  23. April 7, 2020

    Plan Intake: Application Submitted

  24. April 1, 2020

    Planning Cursory Review: Return to Plan Intake

  25. April 1, 2020

    Plan Intake: Application Submitted

  26. March 24, 2020

    Wastewater Modeling Review: Review Complete

    See Engineering-WW Staff Report Comments

  27. March 24, 2020

    Water Modeling Review: Review Complete

    See Engineering - Water Staff Report Comments

  28. March 23, 2020

    Legal Description Review: Verified Legal Description

  29. March 23, 2020

    GIS Cursory Review: Entered in GIS

    Water mains on PP were listed as 8" Instead of 12" on Lake Hazel

  30. March 20, 2020

    Reclaimed Water Review: Connection NOT required

  31. March 20, 2020

    Plan Intake: Cursory Review

    Water and sewer profiles have been combined with the pre-plat PDF drawings.

  32. March 16, 2020

    Plan Intake: Application Submitted

  33. March 16, 2020

    Application filed

Documents

Site plans

  • Open space exhibit

    May 7, 2020 · 53 KB · Viewable by All

  • GIS COGO

    March 23, 2020 · 1.1 MB · Viewable by All

  • Annexation exhibit

    March 16, 2020 · 1.5 MB · Viewable by All

  • Preliminary plat

    March 16, 2020 · 1.1 MB · Viewable by All

Plans

  • Landscape plan

    May 7, 2020 · 8.4 MB · Viewable by All

  • CAD drawing

    March 16, 2020 · 2.4 MB · Viewable by All

  • CAD drawing

    March 16, 2020 · 6.1 MB · Viewable by All

  • CAD drawings

    March 16, 2020 · 1.1 MB · Viewable by All

  • CAD drawings

    March 16, 2020 · 1.3 MB · Viewable by All

  • CAD drawings

    March 16, 2020 · 1.1 MB · Viewable by All

  • CAD drawings

    March 16, 2020 · 1.2 MB · Viewable by All

Staff reports

  • Engineering water staff report comments

    March 24, 2020 · 18 KB · Viewable by All

  • Engineering staff report comments

    March 24, 2020 · 11 KB · Viewable by All

Studies and reports

  • Geotech report

    March 16, 2020 · 27.9 MB · Viewable by All

Correspondence

  • Email confirmation of final action courtesy letter

    Sept. 23, 2020 · 809 KB · Viewable by All

  • Police comments

    May 14, 2020 · 44 KB · Viewable by All

  • Police comments

    May 14, 2020 · 188 KB · Viewable by All

Other documents

  • Zoning amendment exhibit

    March 20, 2020 · 1.5 MB · Viewable by All