Skip to content

Development review · Planning application

Three-story, nine-unit apartment building proposed to replace house and shop

The plan calls for six two-bedroom and three one-bedroom units on a 0.38-acre lot, with a shared 19-space parking lot. The existing house and shop would be removed. The design review application is still under city review.

In reviewDR-00451-2026Filed Sept. 25, 2026South Nampa · 408 E Greenhurst Rd
Site plan for Three-story, nine-unit apartment building proposed to replace house and shop
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

A new three-story, nine-unit apartment building (six two-bedroom and three one-bedroom units) is proposed at 408 E Greenhurst Rd in Nampa on a 0.38-acre lot. The existing house and shop would be removed, and the building would sit on the east side of the lot with a shared 19-space parking area on the west side.

9 plex multifamily redevelopment on existing residential lot. Will be stalling drainage, parking lot and trash enclosure

Project name on file: 9 plex Multi Family Building

Timeline

  1. Oct. 15, 2026

    18 documents added

  2. Oct. 15, 2026

    Staff Report Preparation

  3. Oct. 15, 2026

    Set Date for Public Meeting

  4. Oct. 15, 2026

    P&Z Planner Review

  5. Sept. 28, 2026

    Assess Fees (Building & Site)

  6. Sept. 28, 2026

    Planning Application Review

  7. Sept. 25, 2026

    Application filed

Documents

Site plans

  • Civil construction drawing set for a nine-unit multifamily residential redevelopment, including site data, building code analysis, parking, drainage and utility notes.

    Sept. 25, 2026 · 6 pages · 11.1 MB · Site Plan

    Download Civil construction drawings, plan set

Plans

  • Landscape plan sheet from Plantas Architectures PLLC dated 10.13.26, with a plant palette, fencing and boulder notes, and a note that at least 75% of trees and shrubs must be low or moderate water use per city code.

    Oct. 15, 2026 · 3 pages · 1.3 MB · Updated Landscape Plan

    Download Updated landscape plan (preliminary, not for construction)
  • Revised building elevation drawings for the six-unit building, including west, east, north and south views with glazing area calculations and a dated 10/14/2026 plot.

    Oct. 15, 2026 · 3 pages · 4.6 MB · Elevations updated 10-14-2026

    Download Updated elevations for 6-plex, sheets A-3.0 to A-3.1 and west color
  • City planning staff review comments on design review compliance, covering primary and non-primary facade material and modulation requirements, and a request for a material breakdown chart.

    Oct. 15, 2026 · 13 pages · 6.5 MB · Revised dwgs and docs submitted 10-14-2026

    Download Planning Department design review comments
  • East building elevation showing floor levels and material areas, including board and batten siding square footage.

    Oct. 15, 2026 · 1 page · 666 KB · East Facade material calcs

    Download East facade elevation with material calculations
  • Exposed wall area and material percentage breakdowns for the north and south elevations, covering trim, stucco, siding, board and batten, stone, shake and glazing.

    Oct. 15, 2026 · 1 page · 146 KB · Material breakdown calculations

    Download Material area and percent calculations, north and south elevations
  • Landscape plan for a multi-family project showing a materials legend, plant palette of shade, ornamental, evergreen and shrub species, and notes on common areas and water-use ratings.

    Sept. 25, 2026 · 2 pages · 1.1 MB · Landscaping Plan

    Download Landscape plan with plant palette and notes
  • Architect's site plan for a nine-unit residential building, showing parking stall layout, handicap accessibility features, paving and landscape area calculations.

    Sept. 25, 2026 · 9 pages · 6.5 MB · Building Elevations

    Download Site plan with parking and coverage data, sheet A-1.0

Project narrative

  • Narrative describing the proposed three-story nine-unit multifamily project, its RML zoning and density, parking, trash enclosures, setbacks and landscaping.

    Sept. 25, 2026 · 6 pages · 906 KB · Narrative

    Download Design review narrative for multifamily complex

Staff reports

  • Staff report for the Design Review Committee's Oct. 19 meeting on a proposed nine-unit multifamily building, covering zoning, comprehensive plan design standards and findings.

    Oct. 15, 2026 · 38 pages · 5.8 MB · DR Staff Report

    Download Design review staff report

Photos

Correspondence

  • City planning staff's October 8 design review comments listing required façade material, change-of-element and material breakdown revisions before approval.

    Oct. 15, 2026 · 4 pages · 237 KB · Plan Review Responses

    Download Planning Department design review comments

Other documents

  • Spreadsheet calculating the percentage breakdown of building materials for the design review application.

    Oct. 15, 2026 · 135 KB · Material breakdown calculations

    Download Material percentage breakdown No. 2
  • Design review checklist and application

    Sept. 25, 2026 · Checklist & Master Application

  • Signed affidavit of legal interest

    Sept. 25, 2026 · Affidavit of Legal Interest

  • Vicinity map

    Sept. 25, 2026 · Vicinity Map

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.