Skip to content

Property boundary adjustment · Planning application

Approved: lot line adjustment shifts boundary between two city lots

The city approved a property boundary adjustment on Aug. 22 that redraws the line between a lot with a residence and an adjoining empty lot. The applicant's narrative is partly garbled, so the exact acreage or square footage moved is not clear from the file.

ApprovedPBA-00152-2025Filed July 18, 2025East Nampa · 714 4th St N
Site plan for Approved: lot line adjustment shifts boundary between two city lots
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

PBA

Timeline

  1. Aug. 22, 2025

    Decision: Approved

  2. July 29, 2025

    Planning PBA Application Review

  3. July 23, 2025

    9 documents added

  4. July 18, 2025

    Completeness Check

  5. July 18, 2025

    Application filed

Documents

Site plans

  • Scanned one-page survey sheet showing the lot split under a property boundary adjustment; the text layer is mostly garbled, so details are hard to confirm.

    July 23, 2025 · 1 page · 373 KB · Available Online

    Download Record of survey for lot split

Project narrative

  • Applicant narrative describing a proposed lot split for a property boundary adjustment; the scanned text is largely illegible, so details cannot be confirmed.

    July 18, 2025 · 1 page · 15 KB · Available Online

    Download Lot split narrative

Correspondence

  • Review letter from Nampa Engineering, Planning and Zoning, and Building departments listing comments to address before city approval; engineering asks for a utility easement across P1 benefiting P2.

    July 21, 2025 · 4 pages · 916 KB · Available Online

    Download Letter of corrections on property boundary adjustment
  • Record of survey by a licensed surveyor showing a lot line adjustment between Lots 5 and 6, with a comment requesting a utility easement from P1 to P2 for water, sewer and irrigation.

    July 21, 2025 · 3 pages · 726 KB · ENG Review Comments

    Download Record of survey for lot line adjustment, 4th St

Other documents

  • Legal description

    July 23, 2025 · Available Online

  • Affidavit

    July 18, 2025 · Available Online

  • Application and checklist

    Property boundary adjustment application form and submittal checklist for a lot split.

    July 18, 2025 · Available Online

  • Vicinity map

    July 18, 2025 · Available Online

  • Warranty deed

    July 18, 2025 · Available Online

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.