Skip to content

Development review · Planning application

Approved: 70,200-square-foot light industrial warehouse with six tenant spaces

The city approved the design and exterior finishes of the tilt-up concrete building, with conditions on lighting, including a 25-foot cap on freestanding fixtures and limits on floodlights.

ApprovedDR-00414-2025Filed Sept. 9, 2025North Nampa · 9575 Laster St
Site plan for Approved: 70,200-square-foot light industrial warehouse with six tenant spaces
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

The City of Nampa approved the design of a new light industrial warehouse with offices on its first and second floors, at 0 Laster St (the approval letter's address is 0 Laster St, while the plan sheets list 9575 Laster St). The letter addresses only the building's appearance and materials, and it covers building design and finishes, not site layout or landscaping.

70,200 SQ FT light industrial warehouse consisting of 6 tenant spaces, constructed of tilt up concrete panels.

Project name on file: Adler M142

Timeline

  1. Sept. 18, 2025

    12 documents added

  2. Sept. 18, 2025

    Planning Staff Decision

  3. Sept. 18, 2025

    Assess Fees (Building & Site)

  4. Sept. 18, 2025

    Decision: Approved with Conditions

    Nampa Planning and Zoning Commission: Approved with Conditions.

  5. Sept. 18, 2025

    Planning Application Review

  6. Sept. 18, 2025

    P&Z Planner Review

  7. Sept. 9, 2025

    Application filed

Documents

Site plans

  • Site layout sheet for the Adler Industrial building showing a 21,060 SF building with tenant spaces, 97 parking stalls including 4 ADA stalls, and a 4.95-acre building site area.

    Sept. 9, 2025 · 1 page · 833 KB · Site Plan

    Download Site layout plan, Adler industrial building

Plans

  • Revised architecture drawing set for a core and shell industrial building, including project information, general notes, code analysis, and consultant contacts.

    Sept. 18, 2025 · 8 pages · 4.5 MB · Available Online

    Download Revised architectural design review plans, September 2025
  • Revised exterior elevation drawings for a spec building, with finish material legend (tilt-up concrete panels P-1 to P-4), glazing and wall area percentages for each facade, and construction notes.

    Sept. 18, 2025 · 1 page · 2.3 MB · APPROVED VERSION

    Download Revised exterior elevations
  • Legend listing tilt-up concrete panel finishes, including grey and denim colors, with textured and smooth finish designations.

    Sept. 9, 2025 · 1 page · 61 KB · Building Finishes

    Download Building finish material legend
  • Architectural exterior elevation sheet for the Adler spec building, showing wall materials (tilt-up concrete panels in several grey and blue finishes), glazing percentages, and building heights.

    Sept. 9, 2025 · 1 page · 1.9 MB · Building Elevations

    Download Exterior building elevations, north, south, east and west
  • Landscape plan sheets prepared by South Landscape Architecture P.C., with general landscape and irrigation notes covering plant material, mulch, sod, sprinklers and controllers.

    Sept. 9, 2025 · 4 pages · 1.5 MB · Landscaping Plan

    Download Landscape set for Adler industrial spec building

Project narrative

Decisions

  • Staff approval of the design review for a light industrial warehouse with offices, subject to exterior lighting conditions; approval expires two years from the letter date.

    Sept. 18, 2025 · 3 pages · 2.7 MB · Available Online

    Download Design review approval letter with lighting conditions

Photos

Other documents

  • Affidavit of legal interest

    Sept. 9, 2025 · Affidavit of Legal Interest

  • Vicinity map

    Sept. 9, 2025 · Vicinity Map

  • City of Nampa D&R form

    Sept. 9, 2025 · Checklist & Master Application

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.