Skip to content

Development review · Planning application

Altec approved for 13,926-square-foot truck repair garage in Nampa

The one-story metal building would have 10 service bays for servicing equipment mounted on trucks, plus parts storage and offices. The city approved the design Oct. 28 with conditions on screening, lighting and light pole height.

ApprovedDR-00418-2025Filed Oct. 21, 2025North Nampa · 9785 Laster St
Site plan for Altec approved for 13,926-square-foot truck repair garage in Nampa
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

A new 13,926-square-foot pre-engineered metal building for motor vehicle repair is planned as the Altec Service Center in Nampa's light industrial zone, on Midland Blvd near Laster St. The building has an office area and service bays, with a wall height of about 27 feet. City staff approved the building's design on October 28, 2025.

Pre-engineered metal building used as a motor vehicle repair garage with offices.

Project name on file: Altec Service Center

Timeline

  1. Oct. 28, 2025

    Planning Staff Decision

  2. Oct. 28, 2025

    14 documents added

  3. Oct. 28, 2025

    Decision: Approved with Conditions

    Nampa Planning and Zoning Commission: Approved with Conditions.

  4. Oct. 28, 2025

    P&Z Planner Review

  5. Oct. 22, 2025

    Assess Fees (Building & Site)

  6. Oct. 22, 2025

    Planning Application Review

  7. Oct. 21, 2025

    Application filed

Documents

Site plans

  • Preliminary construction drawing set for the overall landscape and fencing layout, marked not for construction, with a 6-foot chain link fence and rolling gate noted.

    Oct. 21, 2025 · 2 pages · 3.1 MB · Landscaping Plan

    Download Overall landscape and fencing plan, Altec truck service center
  • Engineering civil site plan sheet dated 10/20/2025 showing existing utilities, easements, and notes on utility coordination and ADA accessible route slopes.

    Oct. 21, 2025 · 1 page · 1.6 MB · Site Plan

    Download Civil site plan sheet with utility and grading notes

Plans

  • Architect's cover sheet for the 100% review set, listing the drawing index, building code summary, occupancy, construction type, and sprinkler and separation requirements for the motor vehicle repair garage with offices.

    Oct. 28, 2025 · 10 pages · 5.4 MB · Available Online

    Download Title sheet, index of drawings and code information
  • Front facade elevation sheet listing exterior metal panel types, areas and percentages, finish notes, and general exterior construction notes by Blackmon architects.

    Oct. 21, 2025 · 1 page · 346 KB · Building Elevations

    Download Exterior wall surfaces materials, front facade
  • Rear (south) elevation drawing for the Altec Service Center, with exterior wall surface material areas, metal panel and opening percentages, and finish notes.

    Oct. 21, 2025 · 1 page · 1.0 MB · Building Elevations

    Download Rear building elevation and exterior materials, sheet A3.1
  • Architect's sheet listing front facade exterior materials, areas and percentages (metal panels, glazing) and general exterior finish notes.

    Oct. 21, 2025 · 1 page · 346 KB · Building Finishes

    Download Exterior wall surfaces materials, front facade
  • Sheet A3.1 for the Altec Service Center lists exterior wall, roof and trim finishes, with material areas for the rear and left side facades.

    Oct. 21, 2025 · 1 page · 1.0 MB · Building Finishes

    Download Building finishes, rear and side elevation materials
  • Color and material sample sheet for the Altec Service Center, showing front elevation, entrance plan, and finish colors for storefront, panels, trim and roof.

    Oct. 21, 2025 · 1 page · 3.6 MB · Color Samples

    Download Architectural elevations and color samples, Altec service center

Project narrative

  • Describes a 13,926 sq ft motor vehicle repair garage for Altec Industries, with its design upgrades under Nampa's industrial design standards and landscape screening.

    Oct. 21, 2025 · 1 page · 35 KB · Narrative

    Download Project narrative for design review submittal

Decisions

  • Nampa staff approve the design review for a 13,926 s.f. light industrial metal building for motor vehicle repair, with conditions on mechanical screening and exterior lighting.

    Oct. 28, 2025 · 6 pages · 6.3 MB · Available Online

    Download Design review approval letter
  • Nampa Planning and Zoning design review checklist for an industrial project, listing required submittals, the project type, and wall dimensions with exposed wall square footage.

    Oct. 22, 2025 · 13 pages · 10.8 MB · All documents submitted 10-22-2025

    Download Design review checklist

Other documents

  • Affidavit of legal interest

    Sworn affidavit filed with the Industrial Design application, sometimes used to document notice to affected parties.

    Oct. 21, 2025 · Affidavit of Legal Interest

  • Site design checklist and master application

    Oct. 21, 2025 · Checklist & Master Application

  • Vicinity map, sheet A0.0

    Oct. 21, 2025 · Vicinity Map

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.