Development review · Planning application
172,700-square-foot generator manufacturing plant approved with conditions
The approved design is for a new concrete tilt-up building with enclosed offices, where large generator sets would be assembled. Finished units would be stored on site until trucks deliver them. The city approved it on March 6, 2024, with conditions.
From the filing
The application's description as it appears in City of Nampa's record. See the official record
NEW ~172,700 SF MANUFACTURING BUILDING WITH ENCLOSED ADMINISTRATIVE OFFICES. EXTERIOR WALLS WILL BE CONCRETE TILT-UP PANELS. ROOF WILL HAVE A TPO ROOF WITH INTERNAL DRAINS THAT CONNECT TO STORM DRAINS. PRIMARY FUNCTION WILL BE MANUFACTURING LARGE GENSET'S. THE RAW MATERIALS WILL ENTER BUILDING ON THE NORTH END. MULTIPLE MANUFACTURING PROCESSES WILL OCCUR ALONG AN ASSEMBLY LINE. FINAL ASSEMBLED GENSET UNITS WILL EXIT THE BUILDING ON THE SOUTH AND BE STORED ON SITE WHILE THEY AWAIT TO BE LOADED ONTO TRUCKS FOR DELIVERY. THE ENCLOSED ADMINISTRATIVE OFFICES WILL BE FOR SUPERVISOR OFFICES AND LARGE BREAK ROOMS FOR ALL FACILITY STAFF. NO ROOF-TOP SCREEN WALLS PLANNED. ROOF TOP MECHANICAL UNITS ARE SET-BACK FROM ROOF EDGE ENOUGH THAT THE PARAPET OF THE WALLS SCREEN THE UNITS FROM BEING VISIBILE FROM PARKING LOT OR STREET APPROACH (SEE PERSPECTIVE ON COVER SHEET FOR REFERENCE).
Project name on file: Johnson Thermal Systems
Timeline
March 6, 2024
11 documents added
March 6, 2024
Planning Staff Decision
March 6, 2024
Decision: Approved with Conditions
Nampa Planning and Zoning Commission: Approved with Conditions.
March 5, 2024
Assess Fees (Building & Site)
March 5, 2024
Planning Application Review
March 1, 2024
Application filed
Documents
Other documents
- Design review decision letter
March 6, 2024 · Available Online
- Email about trash enclosure description
March 6, 2024 · Available Online
- Design review submission
March 1, 2024 · Building Elevations
- Design review application form
March 1, 2024 · Master Application
- Color samples
March 1, 2024 · Color Samples
- Site plan, sheet 1
March 1, 2024 · Site Plan
- Affidavit of legal interest
March 1, 2024 · Affidavit of Legal Interest
- Materials and cutsheets
March 1, 2024 · Building Finishes
- No landscape plan required
States that a landscape plan is not required for this design review application.
March 1, 2024 · Landscaping Plan
- Project narrative
March 1, 2024 · Narrative
- Vicinity map
March 1, 2024 · Vicinity Map