Skip to content

Subdivision · Planning application

Five-lot commercial subdivision approved

The city approved a short plat splitting the 5.96-acre commercial property into five lots. Possible uses include a fuel station, bank, fast food, daycare and retail, but no businesses are approved yet. Each building needs its own design review and permit.

ApprovedSPS-00063-2025Filed March 31, 2025West Nampa · 82 S Middleton Rd+1 related filing
Site plan for Five-lot commercial subdivision approved
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

The applicant wants to divide a vacant commercial property at the corner of Middleton Road in Nampa into five commercial lots. No specific businesses are approved yet, though the concept mentions uses like a fuel station and convenience store, bank, fast food and daycare. Each building will need its own design review and permit later.

A commercial subdivision of five lots that include these anticipated uses: fuel with convenience store, bank, fast food with drive-thru, daycare, multi-tenant retail, etc.

Project name on file: Black's Creek Plaza

Timeline

  1. July 24, 2025

    Staff Report Preparation

  2. July 24, 2025

    City Council Decision/Action Letter

  3. June 5, 2025

    P&Z Commision Decision/Action Letter

  4. June 5, 2025

    Notify Applicant

  5. June 5, 2025

    Notice to Area Property Owners

  6. June 5, 2025

    22 documents added

  7. May 27, 2025

    Decision: Approved

    Nampa Planning and Zoning Commission: Approved.

  8. May 27, 2025

    Public hearing: Nampa Planning and Zoning Commission

  9. May 15, 2025

    Property Postings

  10. April 21, 2025

    Notice to Agencies/Departments

  11. April 10, 2025

    Assess Fees (Subdivision)

  12. April 3, 2025

    Plan Intake Passed

  13. April 3, 2025

    Accepted for review

  14. March 31, 2025

    Plan Intake Failed

  15. March 31, 2025

    Application filed

Documents

Site plans

  • Preliminary subdivision plat sheet showing parcel boundaries, easements, utility lines, road frontage and survey ties for the proposed Black's Creek Plaza subdivision.

    March 31, 2025 · 3 pages · 2.6 MB · Prelim Plat

    Download Preliminary plat for Black's Creek Plaza
  • Notes that an open space exhibit is not applicable to this commercial short plat.

    March 31, 2025 · 1 page · 4 KB · Open Space Exhibit

    Download Open space exhibit

Plans

  • Final plat sheet listing subdivision notes on pressure irrigation, resubdivision rules, easements, setbacks and right-to-farm disclosure for Black's Creek Plaza.

    March 31, 2025 · 3 pages · 1.3 MB · Final Plat

    Download Final plat notes
  • Updated proposed building elevation drawings for the Blacks Creek Plaza short plat, a two-page set.

    March 31, 2025 · 2 pages · 5.0 MB · Building Elevations

    Download Proposed building elevations, updated
  • Civil construction drawing set for the Black's Creek Plaza hotel project, covering cover, notes, grading, utilities, drainage, irrigation and landscape sheets, dated March 31, 2025.

    March 31, 2025 · 15 pages · 24.2 MB · Improv/Const Drawings

    Download Civil construction drawings set
  • Landscape plan sheet for Parcel A with notes on tree placement near utilities, street tree counts, perimeter buffer shrubs, and a plant schedule.

    March 31, 2025 · 5 pages · 4.4 MB · Landscape Plans

    Download Landscape plan, Parcel A

Project narrative

  • Cover letter describing a five-lot commercial short plat on about 5.96 acres, planned as one phase, with private internal access, a traffic study, and stormwater retained on each parcel.

    March 31, 2025 · 2 pages · 532 KB · Narrative

    Download Applicant narrative letter for short plat

Staff reports

  • Planning staff report for the May 27, 2025 Planning & Zoning Commission hearing on a five-lot commercial short plat in a BC (Community Business) zone, with zoning, utilities and comprehensive plan analysis.

    May 22, 2025 · 42 pages · 18.8 MB · Staff Report

    Download Staff report for short plat subdivision approval

Decisions

  • Planning and Zoning Commission approved the five-lot commercial short plat for Black's Creek Plaza, subject to conditions on landscaping, engineering, and irrigation district approvals.

    June 5, 2025 · 2 pages · 188 KB · Decision Letter

    Download Subdivision short plat approval decision letter

Notices

  • Notice inviting neighbors to an Oct. 16 informational meeting on a proposed commercial subdivision to support retail and neighborhood-serving uses.

    April 3, 2025 · 1 page · 926 KB · Neighborhood Mtg Notice

    Download Notice of neighborhood meeting

Application

  • Filed 2024 annual report for HOTEL-SLC, LLC, offered as proof of the applicant's authority to act for the entity.

    March 31, 2025 · 1 page · 22 KB · Proof of Authority

    Download Idaho Secretary of State annual report for LLC
  • Planning and Zoning master application for a short subdivision plat of the Black's Creek Plaza project, listing the applicant, owner and subject property details.

    March 31, 2025 · 2 pages · 2.8 MB · Application

    Download Master application for short subdivision plat
  • Planning & Zoning property inquiry notes for a 5.96-acre commercial subdivision in a Community Business zone, covering setbacks, landscaping, and irrigation requirements.

    March 31, 2025 · 3 pages · 720 KB · Pre-Application Meeting Notes

    Download Pre-application meeting notes from Planning & Zoning

Studies and reports

  • Soil exploration and foundation evaluation by Atlas Technical Consultants for a proposed hotel development, with fieldwork in October 2024 and recommendations.

    March 31, 2025 · 37 pages · 1.5 MB · Geotech/Soil Reports

    Download Geotechnical investigation report

Correspondence

  • Engineer's letter arguing that added impervious area will drain to on-site native soil, with no off-site runoff or significant impact on adjacent properties or facilities.

    March 31, 2025 · 1 page · 413 KB · Storm Water Reports

    Download Storm water drainage letter from The Land Group

Other documents

  • Application checklist

    April 10, 2025 · Checklist

  • Quitclaim deed

    March 31, 2025 · Quitclaim Deed

  • Affidavit of legal interest (signed)

    March 31, 2025 · Affidavit of Legal Interest

  • Legal description, Parcel B

    March 31, 2025 · Legal Description - Word

  • Signed legal description, Parcel B

    March 31, 2025 · Legal Description

  • Neighborhood meeting sign-in sheet

    Sign-in sheet from a neighborhood meeting held for this short subdivision plat application; attendee names are not listed here.

    March 31, 2025 · Neighborhood Mtg Sign-In Sheet

  • Vicinity map

    March 31, 2025 · Vicinity Map

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.