Skip to content

Subdivision · Planning application

Plan for 94 homes and a commercial lot gets one-year extension

The Nampa Planning and Zoning Commission extended the approved final plat, which covers 23.88 acres with townhomes, detached homes, triplexes and fourplexes. The plat now stays valid through July 21, 2027, or a new extension is needed.

ApprovedSPF-00285-2025Filed Feb. 27, 2025West Nampa+1 related filing
Site plan for Plan for 94 homes and a commercial lot gets one-year extension
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

Staff recommends that the Planning and Zoning Commission advance the final plat for Ederra No. 1 to City Council. The 23.88-acre site is at 0 W Orchard Ave in Nampa and would be divided into single-family homes, two-family duplex lots, one commercial lot, and common lots. The Police Department counts 135 new dwelling units in the project.

Residential (single-family attached and detached, triplex, fourplex) and commercial development consisting of 94 buildable, 15 common, and 1 commercial lots on 23.88 acres in the RD zone.

Project name on file: Ederra No 1

Timeline

  1. July 29, 2026

    29 documents added

  2. July 10, 2026

    Set Date for Public Meeting

  3. July 23, 2025

    City Council Decision/Action Letter

  4. July 23, 2025

    P&Z Commision Decision/Action Letter

  5. July 21, 2025

    Decision: Approved

    Nampa City Council: Approved.

  6. July 21, 2025

    Public hearing: Nampa City Council

  7. May 23, 2025

    Set Date for Public Meeting

  8. May 23, 2025

    Notice to Agencies/Departments

  9. May 21, 2025

    Assess Fees (Subdivision)

  10. March 7, 2025

    Plan Intake Passed

  11. March 7, 2025

    Accepted for review

  12. Feb. 27, 2025

    Application filed

Documents

Site plans

  • Engineering plat sheets from Bailey Engineering, Inc. for the final subdivision plat; the extracted text is mostly stamp and seal fragments, so the plan details are not readable here.

    Feb. 27, 2025 · 10 pages · 7.5 MB · Preliminary Plat

    Download Final subdivision plat drawings

Plans

Project narrative

Staff reports

  • Planning staff recommends City Council approve the final plat, finding it substantially conforms to the approved preliminary plat, and includes Nampa Fire District comments on the 94-lot, 33-townhouse subdivision.

    July 11, 2025 · 51 pages · 26.8 MB · Staff Report

    Download Staff report for final plat approval of Ederra No 1

Decisions

  • Planning and Zoning Commission granted a one-year extension of the approved final plat, now valid through July 21, 2027, subject to prior conditions of approval.

    July 29, 2026 · 1 page · 188 KB · 1st Extension Decision Letter

    Download One-year extension decision letter for final plat
  • Letter from Nampa Planning and Zoning Commission recommending final plat approval for Ederra No 1 to City Council, with conditions of approval for surveying, engineering, irrigation and construction.

    July 23, 2025 · 2 pages · 183 KB · Decision Letter

    Download Final plat approval decision letter

Application

  • Applicant's request to extend the final plat approval for the Ederra Subdivision No. 1, filed on the City of Nampa extension request form.

    June 9, 2026 · 1 page · 368 KB · Extension Application

    Download Extension request for final plat
  • Planning and Zoning master application checking the Subdivision and Final boxes for the Ederra No 1 project, with applicant, owner and contractor contact details.

    March 10, 2025 · 2 pages · 1.7 MB · Application

    Download Master application for final subdivision plat

Studies and reports

  • Subsurface soil, groundwater, stormwater seepage rate and pavement section recommendations for the site, prepared by Allwest for Trilogy Development.

    Feb. 27, 2025 · 53 pages · 3.6 MB · Geotech/Soil Reports

    Download Geotechnical evaluation
  • Storm drainage analysis by Bailey Engineers using the Rational Method, covering runoff coefficients, 100-year storm sizing, IDF curve, and sand and grease trap treatment for infiltration basins.

    Feb. 27, 2025 · 63 pages · 7.2 MB · Storm Water Reports

    Download Drainage calculations for Ederra Subdivision No. 1

Correspondence

Other documents

  • Ederra No. 1 checklist

    May 21, 2025 · Checklist

  • Subdivision No. 1 legal description

    Feb. 27, 2025 · WORD Legal Description

  • Subdivision No. 1 legal description

    Feb. 27, 2025 · Legal Description

  • Signed affidavit

    Feb. 27, 2025 · Affidavit of Legal Interest

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.