Subdivision · Planning application
Nampa approves final plat for 64 single-family home lots
The 25.01-acre former irrigated farmland will be divided into 64 single-family home lots and 9 common lots, with conditions including a Wilson Drain pathway easement and sewer trunkline work before the plat is signed.

From the filing
The application's description as it appears in City of Nampa's record. See the official record
A developer plans a final plat for the Middlebury North No. 3 subdivision on a 25.01-acre parcel addressed as 0 Midway Road in Nampa. The plan creates 64 single-family detached home lots and 9 common lots.
Final plat for Middlebury North Subdivision no 3
Project name on file: Middlebury North No 3
Timeline
March 18, 2025
16 documents added
Feb. 13, 2025
Set Date for Public Meeting
Feb. 13, 2025
Notice to Agencies/Departments
Feb. 3, 2025
Assess Fees (Subdivision)
Feb. 3, 2025
Decision: Approved with Conditions
Jan. 16, 2025
Plan Intake Passed
Jan. 16, 2025
Plan Intake Failed
Jan. 16, 2025
Accepted for review
Jan. 10, 2025
Application filed
Documents
Site plans
- Download Open space exhibit, phase 3
Exhibit showing phase 3 open space totals: 7.71 acres common open space, 6.95 acres qualified, or 27.79% of the 25.01-acre parcel.
Jan. 10, 2025 · 1 page · 3.2 MB · Open Space Exhibit
- Download Final subdivision plat set, Middlebury North
Six-page engineering plat set prepared by Bailey Engineering, Inc., for the final subdivision plat application; the text is mostly stamp and title-block lettering.
Jan. 10, 2025 · 6 pages · 15.4 MB · Preliminary Plat
Plans
- Download Final plat for Middlebury North Subdivision No. 3, revised
Revised final plat sheets for Middlebury North Subdivision No. 3, lots 35 through 37 and 57 in Block 7, prepared by Bailey Engineering, Inc.; text shows a draft-marked surveyor certification and legal description.
Jan. 31, 2025 · 8 pages · 2.9 MB · Final Plat Revised
- Download Building elevations
Jan. 10, 2025 · 10 pages · 1.7 MB · Building Elevations
- Download Final plat check set, Middlebury North Subdivision No. 3
Bailey Engineering check set of 38 pages for the final subdivision plat, marked not for construction and showing draft survey and engineering stamps.
Jan. 10, 2025 · 38 pages · 32.1 MB · Improv/Const Drawings
- Download Landscape plan sheets for Middlebury North No. 3 final plat
Landscape plan drawings and specifications (landscape work and sprinkler irrigation sections) prepared by Bailey Engineering for the final plat, dated 12-30-24.
Jan. 10, 2025 · 7 pages · 7.9 MB · Landscape Plans
Project narrative
- Download Final plat narrative
Jan. 10, 2025 · 148 KB · Narrative
Staff reports
- Download Staff report on final plat approval for Middlebury North No 3
Planning staff recommend approval of the final plat, finding it substantially conforms to the approved preliminary plat, and include Engineering Department comments and conditions of approval.
March 18, 2025 · 51 pages · 28.0 MB · Staff Report
Decisions
- Download Planning and Zoning Commission decision letter on final plat approval
Letter recommending approval of the final plat to City Council, subject to conditions covering plat comments, engineering review, irrigation assessments and drain easement work.
March 18, 2025 · 2 pages · 204 KB · Decision Letter
Application
- Download Final subdivision plat application (Middlebury North No. 3)
Master application from Kent Brown Planning Services on behalf of Endurance Holdings LLC for final subdivision plat approval, related to a prior 2021 preliminary plat file.
Jan. 31, 2025 · 2 pages · 1.6 MB · Application
Studies and reports
- Download Geotechnical evaluation for north development
Allwest geotechnical evaluation dated January 12, 2021, covering site conditions, subsurface soils, groundwater, laboratory testing, and grading and foundation recommendations.
Jan. 10, 2025 · 43 pages · 1.7 MB · Geotech/Soil Reports
- Download Drainage calculations, Middlebury North Subdivision No. 3
Stamped drainage calculations using the Rational Method, covering runoff coefficients, 100-year storage sizing, IDF curve appendix, and treatment via sand and grease traps.
Jan. 10, 2025 · 57 pages · 9.3 MB · Storm Water Reports
Other documents
- Subdivision checklist, Middlebury North No. 3
Feb. 3, 2025 · Checklist
- Affidavit of legal interest, Endurance Holdings
Affidavit from Endurance Holdings filed as proof of legal interest in the final subdivision plat application.
Jan. 10, 2025 · Affidavit of Legal Interest
- Revised legal description, No. 3
Jan. 10, 2025 · Legal Description - Word
- Revised legal description, No. 3
Jan. 10, 2025 · Legal Description
