Skip to content

Subdivision · Planning application

50-home subdivision on 15 acres of farmland approved with conditions

The final plat for the first phase of Middlebury South covers 50 single-family lots and 7 common lots. It was approved June 15 with conditions, including that irrigation assessments be paid before the plat is signed.

ApprovedSPF-00308-2025Filed Dec. 23, 2025West Nampa+1 related filing
Site plan for 50-home subdivision on 15 acres of farmland approved with conditions
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

Final plat approval is requested for the first phase of Middlebury South, a subdivision of 50 single-family lots and 7 common lots on 15.45 acres at 0 Midway Rd in Nampa. The site lies west of Midway Road between Karcher Road and Flamingo Ave. Staff found the final plat substantially matches the preliminary plat approved in February 2024.

Middlebury South no 1 subdivision is 50 single family lots on 15.45 acres

Project name on file: Middlebury South No 1

Timeline

  1. June 17, 2026

    16 documents added

  2. June 17, 2026

    City Council Decision/Action Letter

  3. June 17, 2026

    P&Z Commision Decision/Action Letter

  4. June 15, 2026

    Decision: Approved with Conditions

    Nampa City Council: Approved with Conditions.

  5. June 15, 2026

    Public hearing: Nampa City Council

  6. April 24, 2026

    Set Date for Public Meeting

  7. Jan. 14, 2026

    Notice to Agencies/Departments

  8. Jan. 9, 2026

    Assess Fees (Subdivision)

  9. Dec. 31, 2025

    Plan Intake Passed

  10. Dec. 31, 2025

    Accepted for review

  11. Dec. 24, 2025

    Plan Intake Failed

  12. Dec. 23, 2025

    Application filed

Documents

Site plans

  • Full set of final subdivision plat drawings, sealed by Bailey Engineering, Inc., spanning ten pages; the extracted text is mostly stamp and letterhead fragments.

    Dec. 23, 2025 · 10 pages · 11.9 MB · Preliminary Plat

    Download Final plat full set (engineer's stamped drawings)

Plans

  • Land use summary for the South 1 phase, showing 57 total lots, 50 residential buildable lots, and 4.28 acres of qualified open space (27.70 percent).

    Dec. 23, 2025 · 1 page · 1.0 MB · Open Space Exhibit

    Download Open space exhibit, South 1 phase
  • A 32-page set of final subdivision plat drawings from Bailey Engineering, Inc., dated Nov. 25, 2025; the extracted text is mostly stamp and seal markings.

    Dec. 23, 2025 · 32 pages · 35.0 MB · Improv/Const Drawings

    Download Final plat submittal set, sheets 1 through 32
  • Final plat sheet for the Middlebury South subdivision showing line and curve tables, legend, and notes on City of Nampa irrigation service, homeowners association common lots, and a drain easement.

    Dec. 23, 2025 · 6 pages · 11.8 MB · Final Plat

    Download Final subdivision plat, Middlebury South No. 1
  • Landscape plan sheets for the Middlebury South No. 1 final plat, with landscape work and irrigation specifications from the civil engineer, Bailey Engineering.

    Dec. 23, 2025 · 7 pages · 6.4 MB · Landscape Plans

    Download Landscape plan and specifications, final plat
  • Elevation drawings for Heritage and Cottage house models, with each model listed by lot or plan name across seven pages.

    Dec. 23, 2025 · 7 pages · 2.4 MB · Building Elevations

    Download Building elevations by house model

Project narrative

Staff reports

  • Planning staff recommends City Council approval of the final plat, which substantially conforms to the approved preliminary plat, and lists Engineering Department review comments and conditions.

    June 5, 2026 · 57 pages · 37.6 MB · Staff Report

    Download Staff report for final plat of Middlebury South No. 1

Decisions

  • Nampa Planning and Zoning Commission recommends City Council approval of the Middlebury South No. 1 final plat, subject to eight conditions of approval.

    June 17, 2026 · 2 pages · 182 KB · Decision Letter

    Download Decision letter recommending final plat approval

Application

  • Planning and Zoning master application checking the Subdivision and Final boxes, with applicant, owner and contractor contact details for the Middlebury South No 1 project.

    Dec. 24, 2025 · 2 pages · 1.5 MB · Application

    Download Master application for final subdivision plat

Studies and reports

  • Allwest geotechnical evaluation for the Wissel Property Development south portion, covering site conditions, subsurface soils, groundwater, and grading and foundation recommendations.

    Dec. 23, 2025 · 42 pages · 1.7 MB · Geotech/Soil Reports

    Download Geotechnical evaluation, south portion
  • Rational Method storm drainage analysis for a 15.5-acre subdivision, covering runoff coefficients, 100-year storage sizing, sand and grease traps, and seepage beds.

    Dec. 23, 2025 · 62 pages · 8.0 MB · Storm Water Reports

    Download Drainage calculations for Middlebury South Subdivision No. 1

Other documents

  • Checklist for Middlebury South No. 1

    Jan. 9, 2026 · Checklist

  • Affidavit of legal interest, Endurance Holdings

    Affidavit from Endurance Holdings filed as proof of legal interest in the final subdivision plat application.

    Dec. 23, 2025 · Affidavit of Legal Interest

  • Middlebury South No. 1 legal description

    Dec. 23, 2025 · Legal Description - Word

  • Middlebury South No. 1 legal description

    Dec. 23, 2025 · Legal Description

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.