Skip to content

Subdivision · Planning application

79-lot single-family subdivision phase approved with conditions

The Nampa City Council approved the final plat on Aug. 17 for the fifth phase of KB Homes' Reflections Edge, covering about 38.7 acres. Conditions include a subdivision improvement agreement with the city before construction starts.

ApprovedSPF-00320-2026Filed May 13, 2026East Nampa+3 related filings
Site plan for 79-lot single-family subdivision phase approved with conditions
Site plan from the application documents.
Pin at the reported location; the shaded outline is the primary parcel (Canyon County).

From the filing

The application's description as it appears in City of Nampa's record. See the official record

KB Homes' final plat for Reflections Edge No. 5 covers about 38.7 acres along East Railroad Street in Nampa. The original concept is 79 single-family detached lots plus 16 common area lots. The Nampa City Council approved the final plat with conditions.

79 Lot Subdivision, Phase 5 of Reflections Edge

Project name on file: Reflections Edge Phase 5

Timeline

  1. Sept. 3, 2026

    City Council Decision/Action Letter

  2. Sept. 3, 2026

    P&Z Commision Decision/Action Letter

  3. Aug. 18, 2026

    18 documents added

  4. Aug. 17, 2026

    Decision: Approved with Conditions

    Nampa City Council: Approved with Conditions.

  5. Aug. 17, 2026

    Public hearing: Nampa City Council

  6. July 6, 2026

    Set Date for Public Meeting

  7. July 6, 2026

    Notice to Agencies/Departments

  8. July 1, 2026

    Assess Fees (Subdivision)

  9. June 24, 2026

    GIS Addressing

  10. May 28, 2026

    Plan Intake Passed

  11. May 28, 2026

    Accepted for review

  12. May 21, 2026

    Plan Intake Failed

  13. May 13, 2026

    Application filed

Documents

Site plans

  • Open space exhibit sheet with block and phase layout and open space data for the final subdivision plat.

    May 13, 2026 · 1 page · 890 KB · Open Space Exhibit

    Download Qualifying open space exhibit
  • Amended preliminary plat for Reflection's Edge Subdivision with preliminary plat data, notes on setbacks, public streets, utilities, and drainage easements, and flood zone boundaries.

    May 13, 2026 · 9 pages · 7.7 MB · Preliminary Plat

    Download Amended preliminary plat

Plans

  • Final subdivision plat sheet showing lot layout, legend, scale, and general notes on utility and irrigation easements, irrigation district assessments, zoning compliance, and footing elevations.

    June 18, 2026 · 6 pages · 3.6 MB · Final Plat

    Download Final plat, Reflections Edge Subdivision No. 5
  • Building elevation drawings for Phase 4 of the Reflections Edge subdivision, filed with the final subdivision plat application.

    May 28, 2026 · 12 pages · 2.4 MB · Building Elevations from Phase 4

    Download Building elevations, Phase 4
  • Landscape requirements table for the subdivision's residential and street frontage, covering tree counts, buffer shrubs, turf limits, and decorative rock mulch, with notes on matching the pre-plat plan.

    May 13, 2026 · 7 pages · 8.8 MB · Landscape Plans

    Download Landscape plan with tree and buffer requirements
  • Civil site development plan set for phase 5 of Reflection's Edge Subdivision, including the cover sheet, sheet index, vicinity map, general notes and utility contractor cautions.

    May 13, 2026 · 41 pages · 47.8 MB · Improv/Const Drawings

    Download Site development plans, general notes and cover sheet, phase 5
  • States that the building elevations will be similar to the existing Reflection's Edge products.

    May 13, 2026 · 1 page · 3 KB · Building Elevations - Statement

    Download Building elevations statement

Project narrative

  • Engineer's cover letter for the Phase 5 construction drawings, landscape plans and final plat, covering lot count, density, setbacks, utilities, drainage and road standards.

    June 18, 2026 · 1 page · 139 KB · Narrative

    Download Phase 5 project narrative cover letter

Staff reports

  • Staff finds the final plat substantially conforms to the approved preliminary plat, and includes Nampa GIS and Police Department comments on service demand and a requested officer funding commitment.

    Aug. 18, 2026 · 28 pages · 13.5 MB · Available Online

    Download Staff report for final plat of Reflections Edge No. 5

Decisions

  • Nampa City Council letter approving the Reflections Edge No. 5 final plat on August 17, 2026, after Planning and Zoning Commission recommendation, listing six conditions.

    Aug. 18, 2026 · 12 pages · 3.7 MB · Available Online

    Download Council approval letter with conditions of approval

Application

  • Master application for the Reflections Edge No. 5 final subdivision plat, listing the applicant engineer, owner and contractor contact information.

    June 18, 2026 · 2 pages · 1.2 MB · Application

    Download Master application form for final subdivision plat

Studies and reports

  • Geotechnical evaluation by GeoTek, Inc. for a residential development of about 48 acres, covering site soils, groundwater, seismicity, conclusions and earthwork recommendations.

    May 13, 2026 · 53 pages · 2.1 MB · Geotech/Soil Reports

    Download Geotechnical evaluation report
  • Preliminary drainage study for the amended plat of Phase 5, covering existing and proposed drainage, 79 residential lots and 18 common lots, prepared by Kimley-Horn for KB Home.

    May 13, 2026 · 71 pages · 8.5 MB · Storm Water Reports

    Download Preliminary storm drainage report, Phase 5

Correspondence

  • Engineer Abbey Hahn explains that the parcel total and project total differ because Phase 5 covers only part of the parcels, and proposes correcting the first total acreage to 41.3.

    May 28, 2026 · 3 pages · 648 KB · Email Explaining Acreage

    Download Email explaining differing acreage totals

Other documents

  • Subdivision plat checklist, No. 5

    May 28, 2026 · Checklist

  • Signed affidavit form

    May 13, 2026 · Affidavit of Legal Interest

  • Plat No. 5 legal description

    Written legal description of the land covered by Plat No. 5 in this final subdivision plat application.

    May 13, 2026 · Legal Description

  • Legal description

    May 13, 2026 · Legal Description - Word

Nearby

The Boise Builds daily briefing

Every new planning application in the Treasure Valley, and every filing that changed, in one email each morning. See a sample

Free. One email a day, only when something is new. Unsubscribe anytime.